Isabel Avenue Trail
Greenway in California · OpenStreetMap relation
Runs through Livermore · Alameda County
Conditions now
Loading the weather near Livermore…
Forecast by the National Weather Service for Livermore · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Wright Brothers Avenue mile 0 directions to trailhead 1
- Parking at Discovery Drive mile 0.4 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Isabel Avenue Trail is a paved multi-use path beside Isabel Avenue on the western side of Livermore, Alameda County, California. Isabel Avenue is the corridor the city planned as the new State Route 84: a 2001 state notice describes transferring the old Route 84 through central Livermore to the city and adopting the Isabel Avenue corridor as Route 84, to take trucks and through traffic off Stanley Boulevard and First Street. At that time Isabel was in various stages of construction and design; the section between Vallecitos Road and Vineyard Avenue, built with the Ruby Hills development, had opened in April 2000.
A local guide, eLivermore, describes the trail as running along the newer section of Isabel from Jack London Boulevard near the airport to Alden Lane, where it turns east between the quarry area and the Oaks housing development. It is open to bicycling, walking and horseback riding, and the signals at Concannon Boulevard and Jack London Boulevard have crossing buttons mounted high for riders on horses. Most of it is separated from traffic, and Isabel also has on-street bike lanes. TrailLink lists the trail as 3.2 miles of asphalt and notes its link to the Arroyo Mocho Trail.
This record maps about 2.4 miles in four pieces, from near Jack London Boulevard and the airport south past East Stanley Boulevard and Concannon Boulevard to about half a mile south of Concannon. Near Stanley Boulevard the trail meets the Iron Horse Trail: in May 2022 Zone 7 Water Agency invited the public to celebrate the opening of a new Iron Horse Trail segment on the south side of the Arroyo Mocho channel, about 5,000 feet of 10-foot-wide asphalt that closed a one-mile gap between Isabel Avenue and an existing segment behind the Heritage Estates property on Stanley Boulevard.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Livermore, 2.7 km from the trail's middle, 9 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 57 61 66 71 77 84 89 89 86 77 65 57 Low °F 39 41 43 46 50 54 57 57 55 50 43 39 Precipitation, in 2.8 2.7 2.2 1.1 0.5 0.1 0 0 0.1 0.8 1.5 2.7 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1906 Pleasanton sheet (1:62,500); the 1953 Livermore sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Iron Horse Regional Trail within 0.2 mi · 32.0 mi, paved
- Arroyo Mocho Trail within 0.2 mi · 5.8 mi, paved
- South Livermore Trail 1.2 mi away · 1.6 mi, surface unknown
- Arroyo del Valle Regional Trail 1.4 mi away · 1.9 mi, paved
- Centennial Trail 4.5 mi away · 1.8 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14157044, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- State Route 84 Relinquishment and Transfer (Notice of Preparation, received 5/29/2001) — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026 Supports: transfer of old Route 84 through central Livermore to the city, adoption of the Isabel Avenue corridor as Route 84, reduction of trucks and through traffic on Stanley Boulevard and First Street, Isabel in stages of construction and design, Vallecitos-Vineyard section built with Ruby Hills and opened April 2000
- Iron Horse Trail and Stanley Reach Improvements (News Release, May 17, 2022) — Zone 7 Water Agency · web · checked Oct 16, 2026 Supports: opening of a new Iron Horse Trail segment on the south side of the Arroyo Mocho channel, one-mile gap closed between Isabel Ave. and the segment behind Heritage Estates on Stanley Blvd., about 5,000 feet of 10-foot-wide asphalt trail
- Isabel Avenue Trail — TrailLink · web · checked Oct 16, 2026 Supports: 3.2 miles, asphalt, western Livermore along Isabel Avenue, connection to the Arroyo Mocho Trail
- Hiking, Biking, and Horsing Around in Livermore, Pleasanton, and the Tri-Valley — eLivermore.com · web · checked Oct 16, 2026 Supports: route from Jack London Blvd near the airport to Alden Lane and east between the quarry area and the Oaks development, bicycling, walking and horseback riding, high crossing buttons at Concannon and Jack London, separation from traffic, on-street bike lanes
- OpenStreetMap relation 14157044, Isabel Avenue Trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: route name, mapped extent of about 2.4 miles in four pieces from near Jack London Boulevard south past Stanley and Concannon boulevards
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.