Island Line Trail
Rail-trail in Vermont · OpenStreetMap relation
Runs through South Hero, Colchester and Burlington · Grand Isle and Chittenden counties
Conditions now
Loading the weather near Burlington…
Forecast by the National Weather Service for Burlington · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Island Line Trail, also known as the Island Line Rail Trail or Colchester Causeway, is a 14.4-mile (23.2 km) rail trail located in northwest Vermont. It starts near Oakledge Park (Burlington) and comprises the Burlington Bike Path (Burlington), Airport Park and Causeway Park (Colchester), and the Allen Point Access Area. The causeway portion of the trail extends out into Lake Champlain. The trail is relatively flat, and its surfaces include a mix of paved/cement, gravel, and gravel/crushed stone. The trail follows the route of the Island Line railroad, built by the Rutland Railroad in 1901.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Managed by Local Motion.4
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Mills Point Road mile 4.4 directions to trailhead 1
- Parking at Colchester Point Road mile 5.4 · restrooms · water directions to trailhead 2
- Parking at Windemere Way mile 6 directions to trailhead 3
- Parking at Horizon View Drive mile 6 directions to trailhead 4
- Parking at Northshore Drive mile 7.2 directions to trailhead 5
- Parking at Starr Farm Beach mile 7.7 directions to trailhead 6
- Parking at Starr Farm Road mile 7.7 directions to trailhead 7
- Parking at Starr Farm Beach mile 7.7 directions to trailhead 8
- Parking at Leddy Park Road mile 8.7 directions to trailhead 9
- Rock Point Trails mile 9.2 directions to Rock Point Trails
- Parking at Seahorse Street mile 9.6 · restrooms directions to trailhead 11
- Parking at Seahorse Street mile 9.6 · restrooms directions to trailhead 12
- Lake Street Parking mile 10.7 · water directions to Lake Street Parking
- Waterfront Park Boat Launch mile 10.8 directions to Waterfront Park Boat Launch
- Parking at Penny Lane mile 10.8 · water directions to trailhead 15
- Parking at Penny Lane mile 10.8 directions to trailhead 16
- Parking at Lake Street mile 11 directions to trailhead 17
- Pease Lot mile 11.1 · restrooms directions to Pease Lot
- ECHO Lot mile 11.2 · restrooms directions to ECHO Lot
- Main Street Landing Lot mile 11.2 · restrooms directions to Main Street Landing Lot
- 4 King Street Lot mile 11.3 directions to 4 King Street Lot
- Parking at King Street mile 11.3 · restrooms directions to trailhead 22
- Perkins Pier Boat Launch Parking mile 11.4 · restrooms directions to Perkins Pier Boat Launch Parking
- Parking at Maple Street mile 11.4 · restrooms directions to trailhead 24
- Parking at Railway Lane mile 11.5 · restrooms directions to trailhead 25
- Parking at Railway Lane mile 11.6 directions to trailhead 26
- Parking mile 12.2 directions to trailhead 27
- Parking at Lakeside Avenue mile 12.2 directions to trailhead 28
- Parking at Lakeside Avenue mile 12.3 directions to trailhead 29
- Parking at Lakeside Avenue mile 12.3 directions to trailhead 30
- Parking at Southwind Drive mile 13 · restrooms directions to trailhead 31
Plan your visit
- National Recreation TrailDesignated in 2005 National Recreation Trails database
- By trainAmtrak: Burlington, VT (BTN) under 0.1 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Island Line Trail, also called the Island Line Rail Trail or the Colchester Causeway, is a rail trail of about 14 miles in northwestern Vermont that runs from Oakledge Park in Burlington north through Colchester and out across Lake Champlain on a causeway toward South Hero. It is made up of the Burlington Bike Path, Airport Park and Causeway Park in Colchester, and the Allen Point Access Area. The trail follows the Island Line, built by the Rutland Railroad in 1901. Passenger service ended after a strike in June 1953, and further strikes in 1960 and 1961 shut down the Rutland, whose last trains ran on September 25, 1961. When Vermont bought other abandoned Rutland lines in 1963 it chose not to acquire the Island Line; its swing bridges were removed, but the causeway roadbed survived. In January 1987 the Island Line Trail became the second railbanking agreement in the United States.
In Burlington the trail follows the Lake Champlain waterfront as the Burlington Bike Path, the route north from Burlington Union Station, and crosses the mouth of the Winooski River into Colchester. From Airport Park on Colchester Point Road a connector path leads to the marble causeway, which the Town of Colchester describes as state-owned. After 2.7 miles the causeway ends at the Cut, a 200-foot gap left for boat traffic, where Local Motion runs a seasonal, donation-based bike ferry on weekends and holidays in spring and fall and daily in summer; the trail continues about a mile on South Hero. Parking is at Airport Park and at a small lot on Mills Point Road.
The trail is relatively flat. It is paved through Oakledge Park and the Burlington Bike Path, gravel by the Colchester parks, and gravel and crushed stone on the causeway. Storm damage closed the trail from September 2019 to May 2020 for nearly $2 million in repairs and upgrades.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
36% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
S Hero, 11.4 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 28 31 40 54 68 77 82 80 72 58 46 34 Low °F 11 12 22 34 46 56 62 61 53 42 31 20 Precipitation, in 1.9 1.6 2 2.7 3.4 4.1 3.9 3.6 3.3 3.7 2.7 2.2 Snow, in 11.4 11.6 10.6 2.2 0 0 0 0 0 0.1 3.3 10.9 - On the National Register
- Moran Municipal Generation Station, Burlington · building, listed 2010 · nomination file for Moran Municipal Generation Station
- Lakeside Development, Burlington · historic district, listed 1982 · nomination file for Lakeside Development
- Battery Street Historic District (Boundary Increase), Burlington · historic district, listed 1984 · nomination file for Battery Street Historic District (Boundary Increase)
- Battery Street Historic District, Burlington · historic district, listed 1977 · nomination file for Battery Street Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1894 Plattsburg sheet (1:62,500); the 1966 Colchester Point sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 3
Community
What riders say on Reddit
- Riders in May 2024 said wind was the main challenge on the exposed causeway: a headwind made the ride hard, and one advised choosing a dry day to avoid rain out there. r/burlington, May 2024
- Riders in 2024 said the path carried many pedestrians, dog walkers and anglers, advised riding slowly, and one suggested going at low-use times. r/burlington, Jan 2024 · r/burlington, May 2024
- Riders in May 2024 called the route mostly flat, noting a short hill near North Beach, though one found it demanding; they named Local Motion, Skirack and Northstar Sports for e-bike rentals. r/burlington, May 2024
- Riders in 2024 suggested starting nearer the causeway for a shorter ride: one named Airport Park or Starr Farm, another a small lot near the causeway. r/burlington, May 2024
3 Reddit threads about this trail, Jan 2024 to Oct 2025
- Island Line Trail - Newbie r/burlington · May 2024 · 12 comments
- Dumb Bike Paths Question r/burlington · Jan 2024 · 42 comments
- Creepy Man at Island Line Rail Trail r/vermont · Oct 2025 · 11 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationLocal Motion: Island Line Trail
- RedditSearch Reddit: r/vermont
- ForumTrail Finder: Island Line Trail/Burlington Greenway
Nearby trails
- Cross Vermont Trail within 0.2 mi · 18.9 mi, paved
- Route 127 Bike Path 0.4 mi away · 3.1 mi, paved
- Colchester Bikepath 2.9 mi away · 2.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 72012, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Island Line Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q16980693, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Local Motion · Official site · checked Oct 31, 2026
- Top 10 Places to Walk in Colchester — Town of Colchester, Vermont · government source · checked Oct 13, 2026 Supports: Colchester Causeway as a State of Vermont owned trail; route through Airport Park and the Causeway connector path to the marble causeway; causeway ends at the Cut at 2.7 miles; ferry on weekends and holidays in spring and fall and all week in summer; trail continues another mile on South Hero; parking at Airport Park and a small lot on Mills Point Road
- Island Line Trail — Wikipedia · organization · checked Oct 13, 2026 Supports: alternate names; 14.4 miles; Oakledge Park start; components (Burlington Bike Path, Airport Park, Causeway Park, Allen Point Access Area); Rutland Railroad Island Line built 1901; 1953 strike; 1960–61 strikes and last trains September 25, 1961; 1963 state purchase excluding the Island Line; swing bridges removed, causeway roadbed survived; Burlington Bike Path from Union Station; second railbanking agreement January 1987; 200-foot gap and Local Motion's donation-based seasonal bike ferry; surfaces by section; relatively flat; closure September 2019–May 2020 for nearly $2 million in repairs and upgrades
- Island Line Trail/Burlington Greenway — Trail Finder · web · checked Oct 13, 2026 Supports: waterfront route from Burlington to Colchester with a trail bridge over the mouth of the Winooski River; Airport Park
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.


