States › California

Juan Bautista de Anza Trail

Greenway in California

Runs through Moreno Valley · Riverside County

Conditions now

Loading the weather near Moreno Valley…

Forecast by the National Weather Service for Moreno Valley · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
6.2 mi 10.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Staff Parking mile 0.1 directions to Staff Parking
  2. Parking at Lasselle Street mile 0.2 directions to trailhead 2
  3. Parking at Lasselle Street mile 1.5 · restrooms directions to trailhead 3
  4. Parking at Elsworth Street mile 7.1 directions to trailhead 4
Moreno Valley, along the trail (opens in a new tab)
Moreno Valley, along the trail · Photo: Steve Jacobs · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Juan Bautista de Anza Trail, recorded here as the Juan Bautista Trail, is a paved multi-use path of roughly 8 miles in Moreno Valley, California, built by the City of Moreno Valley. It runs from Towngate Boulevard in the north to Lake Perris in the south and is one of the city's 25 multi-use trails. The path sits on a 100-foot-wide Department of Water Resources pipeline easement that crosses the city diagonally. It is named for Juan Bautista de Anza, the Spanish military leader whose route gave its name to a 1,200-mile historic trail, and the National Park Service lists the Moreno Valley path as a certified section of the Anza Trail, between historic expedition campsites 58 and 59.

The city built the trail in segments with state Active Transportation Program grants. A two-mile segment from El Potrero Park to Lake Perris was dedicated on May 18, 2022, and the final segment, about 4 miles from the Moreno Valley Mall to Iris Avenue, was substantially completed in late August 2023. American City & County put the total cost at $14,837,629, of which $12,208,213 came from three grant cycles, and the Southern California chapter of the American Public Works Association named the final segment its 2023 project of the year. The route links four schools and nine parks. This record maps about 6.2 miles in many short pieces between the Towngate area and the trail's south end near Lake Perris.

The surface is asphalt and concrete, with decomposed granite in places, and some sections have LED lighting. Motor vehicles are not allowed. The trail has no fee, though Lake Perris State Recreation Area charges for entry, and Towngate Memorial Park has accessible parking and restrooms. Near 15795 Perris Boulevard the trail is not built across an unimproved parcel; the National Park Service route follows sidewalks on Santiago Drive and Perris Boulevard there.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Redlands, 16.1 km from the trail's middle, 35 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F676771768088959692837566
Low °F414245485256626360534540
Precipitation, in2.8320.90.30.10.10.10.10.50.92
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Elsinore sheet (1:125,000); the 1953 Sunnymead sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Mayor Gutierrez and City Council to Dedicate New Segment of Juan Bautista de Anza Trail — City of Moreno Valley (May 13, 2022) · government source · checked Oct 15, 2026
    Supports: trail name, roughly eight miles from Towngate Boulevard to Lake Perris, one of 25 multi-use trails, two-mile El Potrero Park–Lake Perris segment dedicated May 18, 2022, walking, running and biking
  3. City Wins Prestigious Public Works Award for Juan Bautista de Anza Trail Project — City of Moreno Valley (November 3, 2023) · government source · checked Oct 15, 2026
    Supports: APWA Southern California chapter 2023 B.E.S.T. Project of the Year for the third and final segment, Moreno Valley Mall to Iris Avenue, namesake as Spanish military leader, 1,200-mile historic trail
  4. Hike the Anza Trail through Moreno Valley — National Park Service · government source · checked Oct 15, 2026
    Supports: 8-mile certified trail from Towngate Memorial Park to Lake Perris State Recreation Area, paved with concrete, pavement and decomposed granite in places, biking, some lighting, no fee, Lake Perris entrance fee, Towngate Memorial Park parking and restrooms, undeveloped parcel at 15795 Perris Blvd with sidewalk route on Santiago Drive and Perris Blvd, between Anza expedition campsites 58 and 59
  5. 2023 Crown Communities Award winner: The Juan Bautista multi-use trail project in Moreno Valley, Calif. — American City & County, via Smart Cities Dive (March 11, 2024) · web · checked Oct 15, 2026
    Supports: 100-foot DWR pipeline easement running diagonally through the city, final segment about four miles substantially completed late August 2023, total cost $14,837,629, ATP Cycles 2–4 funding of $12,208,213, asphalt and Portland cement concrete, LED lighting, no motorized vehicles, four schools and nine parks

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.