Junction Trail
Rail-trail in Wisconsin · OpenStreetMap relation
Runs through Menomonie · Dunn County
Conditions now
Loading the weather near Menomonie…
Forecast by the National Weather Service for Menomonie · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Meadow Hill Drive mile 0.1 directions to trailhead 1
- Parking at Wolske Bay Road mile 0.2 directions to trailhead 2
- Parking at Wolske Bay Road mile 0.2 directions to trailhead 3
- Parking at Wolske Bay Road mile 0.3 directions to trailhead 4
- Parking at Education Drive mile 0.3 directions to trailhead 5
- Parking at Education Drive mile 0.3 directions to trailhead 6
- Parking at Wolske Bay Road mile 0.5 · restrooms · water directions to trailhead 7
- Parking at Oak Avenue mile 1.3 directions to trailhead 8
(opens in a new tab) About this trail
The Junction Trail is a paved bike trail that runs through north Menomonie in Dunn County, Wisconsin, and joins the Red Cedar State Trail. Local accounts place its start just north of Highway 29 beside the Red Cedar Trail visitor center parking lot, from where it heads north, passing a riverside bench about a quarter mile in. OpenStreetMap maps it as an asphalt path on an abandoned railroad bed, designated for bicycles and pedestrians and closed to ATVs.
This record covers about 1.1 miles of the trail, from Wolske Bay Road and Meadow Hill Drive north past Education Drive to Oak Avenue. The stretch nearest the Highway 29 trailhead is mapped under the name Stokke Trail and appears as a separate record.
North of Oak Avenue the path continues on the railbed to a bicycle and pedestrian bridge over Interstate 94. In August 2018 Volume One reported that the City of Menomonie had just finished paving a 0.6-mile trail segment across the interstate, linking the north and south sides of town. Its new bridge, the first Menomonie overpass devoted solely to cyclists and walkers, replaced an aging railroad bridge removed the previous fall.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 93% of this route as a trail on former railroad right-of-way.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Menomonie, 2.4 km from the trail's middle, 25 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 29 42 56 68 78 82 80 72 59 43 29 Low °F 4 7 19 32 44 55 59 57 48 36 24 12 Precipitation, in 0.9 1.1 2 3 4.5 5.1 4 4 3.6 2.7 1.8 1.3 Snow, in 9.7 11 7.3 2.4 0.5 0 0 0 0 0.2 3.5 6.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1940 Menomonie sheet (1:62,500); the 1942 Menomonie sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Stokke Trail within 0.2 mi · 1.0 mi, paved
- Red Cedar State Trail 0.8 mi away · 14.8 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5537451, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Junction Trail — Menomonie LocalWiki · organization · checked Oct 15, 2026 Supports: bike trail through north Menomonie that joins the Red Cedar State Trail
- Walks — Menomonie LocalWiki · organization · checked Oct 15, 2026 Supports: starts just north of Highway 29 by the Red Cedar Trail visitor center parking lot; runs north along the river
- New Bike Trail Spans I-94 in Menomonie — Volume One · organization · checked Oct 15, 2026 Supports: city paved 0.6-mile segment across I-94 (2018); first overpass solely for bikers and walkers; replaced aging railroad bridge removed the previous fall; links north and south sides of town
- Relation 5537451: Junction Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: route from the Red Cedar trailhead; member ways asphalt cycleway on abandoned railway, bicycle and foot designated, atv=no; record endpoints; path continues north to an I-94 bicycle bridge; adjacent Stokke Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.