States › Washington

Keene Road Trail

Greenway in Washington

Runs through West Richland and Richland · Benton County

Conditions now

Loading the weather near West Richland…

Forecast by the National Weather Service for West Richland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
8.0 mi 12.9 km1
On former railbed
4.0 mi 50%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Keene Road mile 0.8 directions to trailhead 1
  2. Parking at Keene Road mile 0.8 directions to trailhead 2
  3. Parking at Keene Road mile 1.8 directions to trailhead 3
  4. Parking at Keene Road mile 2.2 directions to trailhead 4
  5. Parking at Keene Road mile 2.4 directions to trailhead 5
  6. Parking at Keene Road mile 2.4 directions to trailhead 6
  7. Parking at Holly Way mile 2.5 directions to trailhead 7
  8. Parking at Keene Road mile 3.1 directions to trailhead 8
  9. Parking at Keene Road mile 3.9 directions to trailhead 9
  10. Parking at Keene Road mile 3.9 directions to trailhead 10
  11. Parking at Keene Road mile 3.9 directions to trailhead 11
  12. Parking at Keene Road mile 4.5 directions to trailhead 12
  13. Parking at Keene Road mile 4.5 directions to trailhead 13
  14. Parking at Duportail Street mile 5 directions to trailhead 14
  15. Parking at Duportail Street mile 5 directions to trailhead 15
  16. Parking at Duportail Street mile 5 directions to trailhead 16
  17. Parking at Queensgate Drive mile 5.9 directions to trailhead 17
  18. Parking at Queensgate Drive mile 5.9 directions to trailhead 18
  19. Parking at Keene Road mile 5.9 directions to trailhead 19
  20. Parking at Keene Road mile 6 directions to trailhead 20
  21. Parking at Queensgate Drive mile 6 directions to trailhead 21
  22. Parking at Keene Road mile 6.1 directions to trailhead 22
  23. Parking at Keene Road mile 6.1 directions to trailhead 23
  24. Parking at Keene Road mile 6.3 · water directions to trailhead 24
  25. Parking at Keene Road mile 6.4 directions to trailhead 25
  26. Parking at Keene Road mile 7.1 directions to trailhead 26
  27. Parking at Keene Road mile 7.2 directions to trailhead 27
  28. Parking at Englewood Drive mile 7.2 directions to trailhead 28
  29. Parking at Englewood Drive mile 7.2 directions to trailhead 29
  30. Parking at Keene Road mile 7.3 directions to trailhead 30
  31. Parking at Keene Road mile 7.4 · restrooms directions to trailhead 31
  32. Parking at Keene Road mile 8 directions to trailhead 32
  33. Parking at Keene Road mile 8.1 directions to trailhead 33
  34. Parking at Keene Road mile 8.1 directions to trailhead 34
  35. Parking at Keene Road mile 8.1 directions to trailhead 35
Keene Road bridges in Richland, Washington 5 (opens in a new tab)
Keene Road bridges in Richland, Washington 5 · Photo: Allen4names · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Keene Road Trail is a paved shared-use path along Keene Road in Benton County, Washington, running through West Richland and Richland in the Tri-Cities area. The Benton-Franklin Council of Governments, the regional planning agency, lists it as the Keene Road Pathway among the major paved trails of the region: 8.3 miles long, open to walkers, runners, bicyclists, skateboarders and in-line skaters, with dogs allowed on leash.

OpenStreetMap maps the path from Keene Road near Remmel Street in West Richland east into Richland. TrailLink gives its endpoints as S. Highlands Boulevard and Bellerive Drive and describes the path as 12 feet wide. Badger Mountain Community Park, at 350 Keene Road, sits on the trail; the council lists access to the park, with its restrooms, water, playground and parking, among the trail's amenities.

The surface is asphalt. More pathway work is planned. The council's 2020 Regional Active Transportation Plan noted that the City of Kennewick was filling a missing segment of the Keene Trail, which then ended at Steptoe Street, and the council's 2024 Regional Bicycle Plan lists a Kennewick pathway project extending the Keene Trail from Steptoe Street to Center Parkway and a West Richland project, Keene Road Pathway Phase 4, from Belmont Boulevard to SR 224.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Former Union Pacific Railroad line. From Rail Lines of Washington State (WSDOT).

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Richland, 8 km from the trail's middle, 60 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414857657480898879644940
Low °F293035414854605951423428
Precipitation, in10.70.60.60.60.60.20.10.30.50.91.1
Old maps

USGS topographic maps of the trail's middle go back to the 1917 Pasco sheet (1:125,000); the 1951 Richland sheet (1:62,500) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Regional Pedestrian Trails Plan (2026), Table 5: Major Paved Trails — Benton-Franklin Council of Governments · government source · checked Oct 17, 2026
    Supports: Keene Road Pathway: 8.3 miles; hikers/runners, bikes, skateboards, rollerblades; leashed dogs; access to Badger Mountain Community Park with restrooms, water, playground and parking
  3. Regional Active Transportation Plan (adopted September 18, 2020) — Benton-Franklin Council of Governments · government source · checked Oct 17, 2026
    Supports: Kennewick filling a missing segment of the Keene Trail that ended at Steptoe
  4. Regional Bicycle Plan (2024) — Benton-Franklin Council of Governments · government source · checked Oct 17, 2026
    Supports: Keene Trail Extension (Steptoe to Center Parkway) pathway project in Kennewick; West Richland Keene Road Pathway Phase 4, Belmont Blvd to SR 224
  5. Keene Road Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 17, 2026
    Supports: 12-foot-wide asphalt path adjacent to Keene Road; endpoints S. Highlands Boulevard and Bellerive Drive; Badger Mountain Community Park on the trail at 350 Keene Rd.
  6. Keene Road Trail ways — OpenStreetMap · web · checked Oct 17, 2026
    Supports: route from Keene Road near Remmel Street in West Richland east into Richland; town boundaries

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.