States › Kansas

Kill Creek Streamway Trail

Greenway in Kansas

Runs through De Soto · Johnson County

Partly closed: A section of the Kill Creek Streamway Park trail near De Soto is closed while the surface is replaced with concrete and a sinkhole at the south end of that section is repaired. The page shows the section on a map. The notice has no date, so it is treated as current. From jcprd.com, checked Nov 25.

Conditions now

Loading the weather near De Soto…

Forecast by the National Weather Service for De Soto · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.4 mi 7.0 km1
Surface
Paved1
Status
Partly closed
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Lexington Avenue mile 0.4 directions to trailhead 1
  2. Parking at West 84th Street mile 0.6 directions to trailhead 2
  3. Parking at West 95th Street mile 2.7 · water directions to trailhead 3
De Soto, along the trail (opens in a new tab)
De Soto, along the trail · Photo: CommunicationsDeSoto · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Kill Creek Streamway Trail is a paved, shared-use trail in Johnson County, Kansas, managed by Johnson County Park and Recreation District (JCPRD). The district describes Kill Creek Streamway Park as two separate paved segments totaling about 8.9 miles, part of its effort to build linear parks along major streams in the county. The park is open dawn to dusk year-round.

This page covers the northern segment, about 4.4 miles near De Soto, which starts at the park's 95th Street access at 33460 W. 95th Street. A 16-acre off-leash dog area and a drinking fountain are at that access. The southern segment, which runs through Kill Creek Park in Olathe and is mapped separately, has access near Shelter 1 at 11670 S. Homestead Lane and at the Bloch Barn at 31430 W. 143rd Street. A county page also lists the park with 6.8 miles of trail.

A connection project is building about 2.4 miles of paved path through part of the former Sunflower Ammunition Plant to join the two segments, which would make a trail of about 11 miles from the Kansas River to 143rd Street; the district's page expected substantial completion in October, without a year. In 2023 a 1.25-mile section south of 95th Street was planned to close for Panasonic battery plant sewer work. JCPRD's current page reports a section near De Soto closed while the asphalt is replaced with concrete, with a sinkhole repair at its south end. The district lists a phone line for closures.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bonner Springs, 12.7 km from the trail's middle, 19 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384355647383878678675442
Low °F182231425364676557443222
Precipitation, in1.21.62.545.25.54.54.54.33.42.21.6
Snow, in55.11.50.1000000.31.14.3
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Olathe sheet (1:125,000); the 1951 De Soto sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Kill Creek Streamway Park - Johnson County, Kansas · organization · checked Oct 18, 2026
    Supports: 6.8 miles of trail, Homestead Lane address, dawn to dusk
  3. Part of Kill Creek Trail will close for Panasonic plant site work - Johnson County Post · press · checked Oct 18, 2026
    Supports: 1.25-mile closure south of 95th Street for sewer work
  4. Kill Creek Streamway Park - Johnson County Park and Recreation District · web · checked Oct 18, 2026
    Supports: two paved segments about 8.9 miles, hours, access points, dog area, closure, linear parks, plan to extend to Gardner
  5. Project: Kill Creek Streamway Trail Connection - Johnson County Park and Recreation District · web · checked Oct 18, 2026
    Supports: 2.4-mile connection, Sunflower plant, 11 miles Kansas River to 143rd Street, October completion

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.