States › Ohio

Kokosing Gap Trail

Rail-trail in Ohio · OpenStreetMap relation

Runs through Mount Vernon, Gambier and Howard · Knox County

Conditions now

Loading the weather near Apple Valley…

Forecast by the National Weather Service for Apple Valley · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Kokosing Gap Trail is a 14-mile (23-kilometer) recreational trail built on a former Pennsylvania Railroad right-of-way alongside the Kokosing River in east central Ohio. The trail connects Mount Vernon to Danville via Gambier and Howard.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
13.5 mi 21.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at South Street mile 0 directions to trailhead 1
  2. Kokosing Gap Trailhead mile 0.2 · water directions to Kokosing Gap Trailhead
  3. The Brown Family Enviromental Center Trail Access mile 3.9 directions to The Brown Family Enviromental Center Trail Access
  4. Parking at College Park Street mile 4.8 · restrooms · water directions to trailhead 4
  5. Parking at College Park Street mile 4.8 · restrooms · water directions to trailhead 5
  6. Parking at Meadow Lane mile 4.8 · restrooms · water directions to trailhead 6
  7. Parking mile 4.9 directions to trailhead 7
  8. Kokosing Gap Trailhead (at Killduff Road) mile 7.2 directions to Kokosing Gap Trailhead (at Killduff Road)
  9. Kokosing Gap Trailhead (at Stull Road) mile 7.8 directions to Kokosing Gap Trailhead (at Stull Road)
  10. Howard Rotary Park (OTE Trailhead) mile 9.2 · restrooms · water directions to Howard Rotary Park (OTE Trailhead)
Kokosing Gap Trail (opens in a new tab)
Photo: godber · CC BY · Flickr

About this trail

The Kokosing Gap Trail is a paved, 14-mile rail-trail in Knox County, Ohio, built on a former Pennsylvania Railroad line along the Kokosing River between Mount Vernon and Danville, by way of Gambier and Howard. A nonprofit board formed in 1988 developed and maintains it. The Knox County Commissioners own the land beneath the trail, and the Knox County Park District, a partner, holds a long-term lease to maintain the trailhead parking areas; the Village of Danville maintains a picnic shelter and drinking fountain at the Trail Drive lot at the eastern end.

The last passenger train ran from Mount Vernon to Gambier in December 1950, and freight trains carrying sand ran from Millwood to Mount Vernon until 1982. The first four miles, from Mount Vernon to Gambier, opened on October 5, 1991, and the section on to Danville opened in 1994. The trail begins at Phillips Park in Mount Vernon and passes the Kenyon College campus at Gambier, where a 1940 Alco 0-6-0 steam locomotive, moved there by the trail board in April 2000, and a 1924 Chesapeake and Ohio caboose stand beside the trail. It crosses the Kokosing River twice on railroad bridges more than 250 feet long and passes a historic mill and a railroad tunnel at Howard, where a Rotary Club playground sits near the tunnel. East of Danville, the Mohican Valley Trail continues the route.

The trail is open 24 hours a day, year-round. Water fountains, bicycle repair stations and restrooms are at Mount Vernon, Gambier, Howard and Danville; water is shut off and restrooms close from mid-November to mid-April, except the Howard restroom, which is open all year. Benches stand about every half mile. Electric bicycles are allowed; horses and motor vehicles are not. Parking areas include 500 Mount Vernon Avenue in Mount Vernon, three Gambier locations and 23340 Coshocton Road in Howard.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 98% of this route as a trail on former railroad right-of-way.

Shade

52% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Danville 2 W, 7.5 km from the trail's middle, 13 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343848617079828175635039
Low °F171826364656595749382923
Precipitation, in3.12.53.344.74.94.23.43.22.933.2
Snow, in12.910.66.51.20000002.38.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1912 Gambier sheet (1:62,500); the 1961 Danville sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • One rider in 2025 called the out-and-back mostly flat, as expected of a rail-trail; another in 2026 said wind on the return from Danville made it feel like a long climb. r/bikepacking, Oct 2025 · r/Columbus, May 2026
  • Commenters in 2024 and 2026 pointed to Gambier for Kenyon College, its shops, a bookstore and a deli; one recalled little else to do there. r/Columbus, Apr 2024 · r/Columbus, May 2026
  • Two commenters in 2024 said they had seen bald eagles flying along the Kokosing River near Mount Vernon, one while hiking the trail. r/Ohio, Nov 2024
7 Reddit threads about this trail, Apr 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9719186, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Kokosing Gap Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q6426818, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Kokosing Gap Trail | Home — Kokosing Gap Trail · organization · checked Oct 14, 2026
    Supports: paved 14-mile trail on a former Pennsylvania Railroad line, Mount Vernon to Danville via Gambier and Howard; two Kokosing River crossings on railroad bridges over 250 feet; 1940 Alco 0-6-0 locomotive moved to Gambier in April 2000 by the trustees; 1924 C&O caboose; Rotary Park playground near the Howard Tunnel; open 24 hours, 365 days; fountains, Fixit stations and restrooms in four towns and seasonal closure; benches every half mile; e-bikes allowed; no horses or motor vehicles
  5. Kokosing Gap Multi-Use Trail – official copy — Knox County Park District · organization · checked Oct 14, 2026
    Supports: first four miles opened October 5, 1991; Park District partnership and lease with the Knox County Commissioners, who own the land; parking areas at 500 Mount Vernon Ave., three Gambier sites and 23340 Coshocton Rd. in Howard; historic mill and railroad tunnel at Howard; Village of Danville shelter and fountain at Trail Drive lot at the eastern terminus; Mohican Valley Trail east of Danville
  6. Kokosing Gap Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: western start at Phillips Park in Mount Vernon; trail passes the Kenyon College campus at Gambier
  7. Public invited to Kokosing Gap Trail 25th Anniversary Celebration — Knox Pages (September 30, 2016) · web · checked Oct 14, 2026
    Supports: nonprofit board formed in 1988; last passenger train Mount Vernon–Gambier December 1950; sand freight Millwood–Mount Vernon until 1982; Mount Vernon–Gambier opened October 5, 1991; Danville section 1994

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.