Lake Highlands Trail
Greenway in Texas · OpenStreetMap relation
Runs through Dallas · Dallas County
Conditions now
Loading the weather near Dallas…
Forecast by the National Weather Service for Dallas · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Blessington Drive mile 1 directions to trailhead 1
- Parking at White Rock Trail mile 1.6 directions to trailhead 2
- Parking at White Rock Trail mile 1.8 · restrooms · water directions to trailhead 3
- Parking at Whistle Stop Place mile 2.1 directions to trailhead 4
- Parking at Whistle Stop Place mile 2.4 directions to trailhead 5
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Lake Highlands Trail is a paved hike-and-bike trail in the Lake Highlands neighborhood of northeast Dallas, Texas, built by the City of Dallas Park and Recreation Department. Its first phase, more than 2 miles of paved trail, opened with a ribbon cutting in October 2014 after 11 years of planning. The department's assistant director said then that building in the power line corridor the trail follows had added time to the project. The trail does not follow a railroad.
Phase one begins at Ferndale Road between Faircrest and Vistadale and runs east along the power lines to Lake Highlands North Park. In 2020 the Dallas City Council approved a 2.5-mile extension of 12-foot-wide concrete trail, estimated at $8.3 million with $5.7 million in federal funds, to link the trail with Lake Highlands Town Center and the White Rock Creek Trail. As planned, Phase 2A leaves the existing trail near the Fair Oaks Transfer Station, runs east through the White Rock Greenbelt, crosses Abrams Road near Scofield Church and follows Oncor power lines to Arbor Park. Phase 2B continues along Skillman Street to Church Road, then splits north and south along White Rock Trail (the street), reaching existing trail at the Lake Highlands DART station and just north of Lake Highlands High School.
The extension plans called for a concrete boardwalk under the Walnut Hill Lane bridge, raised boardwalks over low spots where the older trail turns boggy after heavy rain, curb extensions separating trail users from traffic on Arborside Drive and White Rock Trail, and barriers on the stretch beside Skillman. The city first expected the extension to be complete by March 2023; in October 2023 the council raised the project's budget from $4.4 million to $4.8 million, with RoeschCo Construction building phases 2A and 2B. This record maps about 5.4 miles, including segments along White Rock Trail.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Dallas Love Field, 12.2 km from the trail's middle, 18 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 58 62 70 77 85 93 97 97 90 80 68 59 Low °F 38 42 49 57 66 74 78 77 70 59 48 40 Precipitation, in 2.6 2.8 3.5 3.1 4.6 3.8 1.7 2.2 3.1 4.8 2.9 3.2 Snow, in 0.1 0.9 0.3 0 0 0 0 0 0 0 0.1 0.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1959 Garland sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Mar 2025 to May 2025
- Really thought I posted this year yesterday, but would love to have y’all‘s input. r/dfwbike · Mar 2025 · 9 comments
- Big bobcat at White Rock Creek r/Dallas · May 2025 · 105 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/texas
Nearby trails
- White Rock Creek Trail within 0.2 mi · 9.5 mi, paved
- SoPac Trail 0.3 mi away · 6.5 mi, paved
- Flagpole Hill Trail 0.9 mi away · 1.5 mi, paved
- Ridgewood Trail 1.3 mi away · 1.4 mi, paved
- White Rock Lake Trail 1.3 mi away · 9.7 mi, paved
- Northaven Trail 1.6 mi away · 8.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17727387, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Grand opening: Lake Highlands Trail — Lake Highlands Advocate (October 30, 2014) · web · checked Oct 15, 2026 Supports: Dallas Park Board and Park and Recreation opening, phase one of more than 2 miles of paved trail from Ferndale between Faircrest and Vistadale east along the power lines to Lake Highlands North Park, 11 years in the making, power line corridor added time, phase two to extend to LH Town Center
- Lake Highlands Trail extension approved — Lake Highlands Advocate (May 20, 2020) · web · checked Oct 15, 2026 Supports: council approval of 2.5-mile extension to Lake Highlands Town Center and White Rock Creek Trail, $8.3 million with $5.7 million federal, March 2023 completion target, 12-foot concrete, boardwalk under Walnut Hill Lane bridge, curb extensions on Arborside and White Rock Trail, Abrams crossing near Scofield Church
- Eight takeaways from the city's trail meeting — Lake Highlands Advocate (May 9, 2019) · web · checked Oct 15, 2026 Supports: Phase 2A route from Fair Oaks Transfer Station through White Rock Greenbelt across Abrams under Oncor lines to Arbor Park, Phase 2B along Skillman to Church Road and north-south along White Rock Trail to the Lake Highlands DART station and north of Lake Highlands High, boardwalks for boggy spots, barriers along Skillman
- Dallas City Council increases Lake Highlands Trail renovation budget by $400,000 — Lake Highlands Advocate (October 16, 2023) · web · checked Oct 15, 2026 Supports: October 2023 budget increase from $4.4 million to $4.8 million, RoeschCo construction contract for phases 2A/2B
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.