States › Colorado

Lake Minnequa Trail

Greenway in Colorado

Runs through Pueblo · Pueblo County

Conditions now

Loading the weather near Pueblo…

Forecast by the National Weather Service for Pueblo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.9 mi 4.7 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Lakeview Avenue mile 1.1 directions to trailhead 1
  2. Lake Minnequa Rear Parking Lot mile 2.2 directions to Lake Minnequa Rear Parking Lot
  3. Parking at Lakeshore Dr mile 2.2 directions to trailhead 3
  4. Lake Minnequa Front Parking Lot mile 2.3 directions to Lake Minnequa Front Parking Lot
Lake Minnequa Park in Pueblo, Colorado (opens in a new tab)
Lake Minnequa Park in Pueblo, Colorado · Photo: PEO ACWA · CC BY 2.0 · Wikimedia Commons

About this trail

The Lake Minnequa Trail is a gravel loop of about 2.75 miles around Lake Minnequa, southwest of downtown Pueblo. It is not a rail-trail. The City of Pueblo's Public Works Department and Pueblo Parks and Recreation have worked on trail improvements at the lake, which a city engineering manager described in 2022 as having a well-established trail system.

The flat path rings the lake, with views of ponds and wetlands that provide habitat for birds and other wildlife; TrailLink gives its endpoints as W. Pueblo Boulevard and Lakeview Avenue. Parking is inside Lake Minnequa Park and Open Space (1601-1999 Streator Avenue) at the trail's southern end, where there are also basketball courts and covered picnic tables.

In July 2022 the city announced the Lake Minnequa Connector Trail Project, a concrete multi-use trail from the lake trail to Pueblo Boulevard, following a drainage ditch west to Alma Avenue and then running south. A $1.4 million Colorado Department of Transportation grant covered the design of phases 1 and 2 and construction of phase 1, which was expected to run from fall 2022 to spring 2023, as part of the city's pedestrian and bike master plan.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pueblo Rsvr, 8.6 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F474959667687929082695647
Low °F182028364656626051382719
Precipitation, in0.30.30.91.71.71.21.92.10.80.80.50.3
Snow, in2.42.51.90.6000001.433
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Pueblo sheet (1:125,000); the 1961 Southwest Pueblo sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Lake Minnequa Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 17, 2026
    Supports: 2.75 miles, gravel, flat pathway ringing the lake southwest of downtown Pueblo, ponds and wetlands, bird habitat, endpoints W. Pueblo Blvd. and Lakeview Ave., basketball courts and covered picnic tables at south end, parking in Lake Minnequa Park and Open Space (1601-1999 Streator Ave.)
  3. City of Pueblo takes step toward improving biking and hiking trails at Lake Minnequa — KRDO (July 6, 2022) · web · checked Oct 17, 2026
    Supports: Public Works and Pueblo Parks and Recreation working on the project; 'well-established trail system' (engineering manager Charles Roy); Lake Minnequa Connector Trail Project, concrete multi-use trail to Pueblo Boulevard via drainage ditch west to Alma Avenue then south; $1.4 million CDOT grant for design of phases 1-2 and construction of phase 1; construction fall 2022 to spring 2023; pedestrian and bike master plan

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.