Lake Silveira Wetlands Trail
Greenway in California
Runs through Morgan Hill · Santa Clara County
Conditions now
Loading the weather near Morgan Hill…
Forecast by the National Weather Service for Morgan Hill · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Lake Silveira Wetlands Trail is a paved path of about 1.4 miles beside Llagas Creek in southern Morgan Hill, California, leading to Lake Silveira. The lake is a former quarry in unincorporated Morgan Hill near the San Martin border. In 2020 Valley Water built a new wetland there and restored about 2,000 feet of Llagas Creek as part of the Upper Llagas Creek Flood Protection Project, and said the lake would stay closed to the public while the habitat established.
The Morgan Hill Times described the trail in 2022 as a paved pedestrian and cycling path running from Watsonville Road to Lake Silveira, funded by the City of Morgan Hill, Valley Water and grants. Its first phase would open only after pedestrian crossings at West Middle Avenue, La Crosse Drive and Watsonville Road were finished. Valley Water's project page lists the paved trail in Reach 7A as completed on behalf of the city.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: September to June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Gilroy, 12 km from the trail's middle, 36 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 61 64 68 72 77 83 87 87 85 79 68 60 Low °F 38 40 43 44 49 52 54 54 52 48 42 37 Precipitation, in 4.5 4.3 2.6 1.3 0.6 0.1 0 0 0 0.8 1.7 3.7 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1917 Morgan Hill sheet (1:62,500); the 1955 Gilroy sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- West Little Llagas Creek Trail 0.6 mi away · 1.6 mi, paved
- Butterfield Linear Park Path 0.9 mi away · 1.3 mi, paved
- Edmundson Creek Trail 0.9 mi away · 1.4 mi, paved
- Coyote Creek Trail 4.6 mi away · 27.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Valley Water builds new wetland and restores Llagas Creek — Valley Water · organization · checked Oct 18, 2026 Supports: former quarry location, 2020 wetland and 2,000 feet of creek restoration, lake temporarily closed to the public
- E6: Upper Llagas Creek Flood Protection — Valley Water · organization · checked Oct 18, 2026 Supports: paved trail in Reach 7A completed on behalf of the City of Morgan Hill
- New trail will include flashing crosswalk lights — Morgan Hill Times · press · checked Oct 18, 2026 Supports: paved pedestrian and cycling path from Watsonville Road to Lake Silveira, crossings, funding, opening tied to crossings (August 2022)
- OpenStreetMap — OpenStreetMap contributors · web · checked Oct 18, 2026 Supports: mapped route, length and surface, trailhead streets, path names where stated
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.