Las Positas Road Multiuse Path
Greenway in California
Runs through Santa Barbara · Santa Barbara County
Conditions now
Loading the weather near Santa Barbara…
Forecast by the National Weather Service for Santa Barbara · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Las Positas Road Multiuse Path is a separated path for bicycles and pedestrians in Santa Barbara, California. The City of Santa Barbara lists the Las Positas/Modoc Multiuse Path at 2.6 miles. It runs along Modoc Road from Calle de Los Amigos to Las Positas Road, then along Las Positas Road from Modoc Road to Cliff Drive. Our record covers about 1.5 miles, the Las Positas Road part.
The city announced completion on February 23, 2022, and held a ribbon-cutting on March 3 at Arroyo Burro Open Space. The Santa Barbara Independent reported that construction broke ground in August 2020 and took 18 months, and that the path had been open for weeks before the ceremony. The city lists the cost as $15.5 million, funded by the California Active Transportation Program and Measure C.
The path is part of the Coast Bike Route between Goleta and Ventura and gives access to nearby neighborhoods, parks and the beach. A footbridge over Arroyo Burro connects it to the park. The Independent describes freshly paved paths, a new signal at the Elings Park intersection, more than 100 new trees, at least 500 new shrubs and railings separating the path from traffic.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: all year. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Santa Barbara, 5.2 km from the trail's middle, 15 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 67 67 68 71 72 73 76 78 78 76 71 66 Low °F 46 47 49 51 54 57 60 60 60 56 50 46 Precipitation, in 4.4 4.4 3.2 1 0.4 0.1 0 0 0.1 0.8 1.4 3.1 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1944 Santa Barbara sheet (1:31,680); the 1952 Santa Barbara sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Modoc Road Multiuse Path within 0.2 mi · 2.0 mi, paved
- Obern Trail 1.9 mi away · 3.8 mi, paved
- California Mission Trail 2.8 mi away · 2.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Las Positas/Modoc Multiuse Path - City of Santa Barbara · government source · checked Oct 18, 2026 Supports: 2.6 miles, route, funding, $15.5 million, completion announcement, ribbon-cutting, Coast Bike Route, footbridge
- Santa Barbara Celebrates Completion of Las Positas and Modoc Multi-Use Path - Santa Barbara Independent · press · checked Oct 18, 2026 Supports: groundbreaking August 2020, 18 months, open before ceremony, paving, signal, trees, shrubs, railings
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.