States › New York

Laurelton Greenway

Greenway in New York · OpenStreetMap relation

Runs through Queens and New York · Queens County

Conditions now

Loading the weather near New York…

Forecast by the National Weather Service for New York · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 147th Avenue mile 0.1 directions to trailhead 1
  2. Parking at North Conduit Avenue mile 0.9 directions to trailhead 2
  3. Parking at Brookville Boulevard mile 1.5 directions to trailhead 3
Laurelton Greenway (opens in a new tab)
Photo: daalso · CC BY-SA 4.0 · Mapillary

About this trail

The Laurelton Greenway is a paved path of about 1.5 miles in Queens, New York City, beside the Laurelton Parkway. It is mapped in OpenStreetMap as a bicycle route that also takes in the Brookville Boulevard Path, a concrete path, and the Brookville Park Greenway. The Greenway Master Plan for the Conduit, Southern Queens, Laurelton and Cross Island corridors, prepared by the Department of City Planning and the Parks Department, describes the Laurelton Greenway as new asphalt paths along the alignment of the original 1940 paths.

In the plan, the route starts at the connection with the Southern Queens Greenway at Brookville Boulevard and North Conduit Avenue and travels north on the east side of Laurelton Parkway. It replaces existing 6-foot paths with 8-foot asphalt paths and rejoins the street at Francis Lewis Boulevard and Brookville Boulevard. The plan notes the Twin Ponds beside the paths, the reconstructed Laurelton Park and Playground between Francis Lewis Boulevard and 136th Street, and links to the Nassau County beaches, JFK Airport and Alley Pond Park.

The plan dates from about 2000. Wikipedia reports that the full greenway had not been built as of 2017 because of disagreements in the Howard Beach community, so the plan describes a proposal and the paved path mapped today is only part of it.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

26% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
New York Jfk International Airport, 3.5 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F404249596878848276655444
Low °F262734435262696861504032
Precipitation, in3.22.83.93.53.73.93.94.13.63.73.14
Snow, in7.58.64.30.60000000.44.5
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Hempstead sheet (1:62,500); the 1954 Lynbrook sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3010613, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenway Master Plan: Conduit, Southern Queens, Laurelton, Cross Island — NYC Department of City Planning and Parks · government source · checked Oct 18, 2026
    Supports: Laurelton Greenway route description, new asphalt paths on the 1940 alignment, Twin Ponds, start at Brookville Boulevard and North Conduit, 8-foot asphalt replacing 6-foot paths, Laurelton Park and Playground, connections
  3. Conduit Avenue — Wikipedia · organization · checked Oct 18, 2026
    Supports: 2000 proposal, greenway not fully built as of 2017, Howard Beach disagreements
  4. OpenStreetMap — OpenStreetMap contributors · web · checked Oct 18, 2026
    Supports: mapped route, length and surface, trailhead streets, path names where stated

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.