States › Washington

Liberty Lake Trail

Greenway in Washington · OpenStreetMap relation

Runs through Liberty Lake · Spokane County

Conditions now

Loading the weather near Liberty Lake…

Forecast by the National Weather Service for Liberty Lake · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North Harvard Road mile 0.1 · restrooms directions to trailhead 1
  2. Parking at East Wellington Parkway mile 0.1 · restrooms directions to trailhead 2
  3. Parking at North Harvard Road mile 0.3 directions to trailhead 3
  4. Parking at North Liberty Lake Road mile 0.5 directions to trailhead 4
  5. Parking at West Kenney Road mile 0.5 directions to trailhead 5
  6. Parking at West Kenney Road mile 0.5 directions to trailhead 6
  7. Parking at North Pepper Lane mile 0.5 directions to trailhead 7
  8. Parking at East Mission Avenue mile 0.5 directions to trailhead 8
Liberty Lake Trail drawn on the 1951 USGS topographic map of Greenacres, Washington
Then: the 1951 USGS Greenacres sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Liberty Lake Trail is a paved path of about 1.4 miles in Liberty Lake, Washington, east of Spokane. In OpenStreetMap it runs south from North Harvard Road, is mapped as asphalt, and is marked designated for bicycles and pedestrians; the name and surface come from OpenStreetMap.

The city sits on the route of the Spokane River Centennial Trail, a roughly 37 to 39 mile paved trail that Washington State Parks manages as Centennial Trail State Park and that passes through Liberty Lake. A 1999 Spokesman-Review report described a proposed Liberty Lake trail system of asphalt, gravel and street trails, with a link to the Centennial Trail probably near Harvard Road that would have to cross Interstate 90, by an old railroad bridge or a path built into the planned Harvard interchange project.

A 2000 Spokesman-Review article on the dedication of the first phase of the city trail system described a U-shaped trail from Valleyway to Molter Road to Sprague Avenue, and a separate footbridge over Interstate 90 estimated at $750,000. The sources fetched do not say how this record relates to those phases or whether the bridge was built.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Spokane Felts Field, 15.8 km from the trail's middle, 27 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384251607076878676604537
Low °F262732374450565447383126
Precipitation, in21.31.81.51.71.50.70.50.71.522.2
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Spokane sheet (1:125,000); the 1951 Greenacres sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 6752571, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Spokane River Centennial Trail - Wikipedia · organization · checked Oct 17, 2026
    Supports: 37-39 miles, paved, passes through Liberty Lake, Washington State Parks manages it
  3. OpenStreetMap relation 6752571 - Liberty Lake Trail · web · checked Oct 17, 2026
    Supports: name, asphalt surface, bicycle and foot designation, Harvard Road start
  4. Liberty Lake Trail System Advances - The Spokesman-Review · web · checked Oct 17, 2026
    Supports: 1999 proposal, surfaces, Centennial Trail link near Harvard Road
  5. Phase One Of Liberty Lake Trail To Be Dedicated This Morning - The Spokesman-Review · web · checked Oct 17, 2026
    Supports: 2000 phase-one dedication, Valleyway-Molter-Sprague route, footbridge estimate

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.