Litchfield Community Greenway
Rail-trail in Connecticut · OpenStreetMap relation
Runs through Bantam, Town of Litchfield and Borough of Litchfield
Conditions now
Loading the weather near Bantam…
Forecast by the National Weather Service for Bantam · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Litchfield Community Greenway.2
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 1.7 directions to trailhead 1
- Parking mile 1.8 directions to trailhead 2
- Parking at North Shore Road mile 1.9 directions to trailhead 3
- Parking at Bissell Road mile 2.8 directions to trailhead 4
- Parking at Bissell Road mile 2.9 directions to trailhead 5
- Parking at Whites Wood Road mile 3.5 directions to trailhead 6
- Parking at Whites Wood Road mile 3.7 directions to trailhead 7
- Parking at Russell Street mile 4.6 directions to trailhead 8
- Parking at Russell Street mile 4.6 directions to trailhead 9
- Parking at Russell Street mile 4.6 directions to trailhead 10
- Parking at South Lake Street mile 4.6 directions to trailhead 11
About this trail
The Litchfield Community Greenway is a walking and cycling trail in Litchfield, Connecticut, built and maintained by the Friends of the Litchfield Community Greenway, an all-volunteer nonprofit that has worked on the project since 2004. It follows the railbed of the Shepaug Railway, which ran between Litchfield and Danbury from 1878 to 1948. After the railroad's bankruptcy the corridor was acquired by Connecticut Light and Power, now Eversource Energy, and the trail uses it under an agreement with the utility. The first phase opened in 2010.
Phase I runs from the junction of South Lake Street, Russell Street and Gallows Lane to Whites Woods Road. Phase II follows existing trails through the White Memorial Conservation Center to Bissell Road, and Phase III continues from Bissell Road to the current terminus at North Shore Road; the group describes the open trail as more than two miles long. Phase 4, the "Trail to Bantam," is a planned extension of about 1.9 miles along the railbed from North Shore Road across the Bantam River and over High Bridge Road and Bantam Lake Road to Stoddard Road. Phase 5 would extend the trail along Russell Street to the former Shepaug Railroad station, which the Litchfield Land Trust has renovated.
Structures include the "Bridge to Everywhere," a pedestrian bridge over Butternut Brook along Route 202 assembled by volunteers in 2019, and a boardwalk of more than 400 feet over the Bissell Road wetlands, completed in autumn 2021 with a solar-powered, push-button flashing crosswalk. In June 2024 the project received a $320,000 grant from the state Department of Energy and Environmental Protection for the rest of Phase 4, bringing state funding for that phase to $561,500. The group's December 2024 update expected both extensions to be built in 2025.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bakersville, 21.4 km from the trail's middle, 67 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 33 36 45 58 69 77 82 80 72 60 49 38 Low °F 15 16 23 33 44 53 58 56 49 38 29 21 Precipitation, in 3.9 3.5 4.6 4.3 4.1 4.9 4.3 4.8 5 5.4 4.2 5 Snow, in 13.1 15.8 12.7 2.6 0 0 0 0 0 0.3 2.6 12 - On the National Register
- Litchfield Historic District, Litchfield · historic district, listed 1978 · nomination file for Litchfield Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1893 Waterbury sheet (1:62,500); the 1956 Litchfield sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Litchfield Community Greenway
- FacebookLitchfield Community Greenway (Facebook)
- ElsewhereLitchfield Community Greenway (Instagram)
Nearby trails
- Naugatuck River Greenway 4.9 mi away · 8.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14100107, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Litchfield Community Greenway · Official site · checked Oct 31, 2026
- Our History — Litchfield Community Greenway · organization · checked Oct 13, 2026 Supports: all-volunteer Friends group, Shepaug Railway Litchfield–Danbury 1878–1948, CL&P/Eversource acquisition and agreement, Phase I opened 2010 and its endpoints, Phase II through White Memorial to Bissell Road, Phase III to North Shore Road, more than two miles, Phase 5 to the station, Litchfield Land Trust renovation, Bridge to Everywhere, 400-foot boardwalk and crosswalk completed fall 2021
- Litchfield Community Greenway · organization · checked Oct 13, 2026 Supports: volunteers working since 2004
- Trail Map — Litchfield Community Greenway · organization · checked Oct 13, 2026 Supports: Butternut Brook bridge along Route 202 assembled by volunteers in 2019, boardwalk and solar push-button crosswalk completing Phase III in autumn 2021
- Big News!! $330,000 Of Grants Awarded! Bantam, Here We COME! — Litchfield Community Greenway (May 22, 2023) · organization · checked Oct 13, 2026 Supports: extension of 10,000 feet (about 1.9 miles) from North Shore Road across the Bantam River, over High Bridge Road and Bantam Lake Road to Stoddard Road on the Shepaug right of way
- Funding Secured for the Trail to Bantam! — Litchfield Community Greenway (June 13, 2024) · organization · checked Oct 13, 2026 Supports: Trail to Bantam name, $320,000 DEEP grant for the rest of Phase 4, $561,500 total state funding for Phase 4
- Another Fabulous Year! — Litchfield Community Greenway (December 20, 2024) · organization · checked Oct 13, 2026 Supports: Russell Street and Bantam extensions expected to be completed in 2025
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
