Boca-Loyalton Trail
Rail-trail in California
In Sierra County
Conditions now
Loading the weather near Sierra Brooks…
Forecast by the National Weather Service for Sierra Brooks · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Loyalton/Boca Railroad Trail, which the Tahoe National Forest lists as Forest Trail 16E87, commonly known as the Boca-Loyalton Trail, is a dirt trail on the grade of the Boca & Loyalton Railroad in the forest's Sierraville Ranger District, in Sierra County, California. The railroad was built in 1901 and ran until 1916, carrying lumber from the mill at Loyalton to the main line near Boca, close to today's Hirschdale exit on Interstate 80. The 1994 Cottonwood Fire destroyed much of the old line, although much of the route survives. The Sierra Buttes Trail Stewardship has done restoration work on the grade and describes a goal of reopening it as a dirt connection between Truckee and Loyalton.
The built trail follows the grade through Smithneck Canyon south of Loyalton. A trail listing that quotes the Forest Service describes about 2 miles of trail from a footbridge near a county park to Alder Creek Road and Smithneck Road, open to hikers, mountain bikers and horse riders, with two cattle gates that users close behind them; the first mile or so crosses the Cottonwood Fire burn scar and has little shade. The same listing gives about 26 miles as the length of the full planned route. At the first Sagan Dirt Fondo, a ride starting in Truckee, nearly 400 cyclists used a 2.5-mile section of the grade on the way to Loyalton. This record maps about 3.3 miles of the trail.
A Tahoe National Forest order of September 5, 2025, issued after a trail washout, closed the trail from 1.2 miles south of its trailhead at the Alvin A. Powers Memorial Grove picnic area south to Forest Road 860-40, the Lewis Mill Road. The order ran until September 5, 2026, and the forest's alerts page still listed the closure in October 2026.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Boca, 26.2 km from the trail's middle, 17 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 44 46 52 58 66 76 86 85 79 67 54 43 Low °F 13 15 21 25 31 35 39 37 31 25 20 15 Precipitation, in 3.9 3.6 2.9 1.5 1.4 0.6 0.5 0.4 0.5 1.3 2 4.1 Snow, in 21.3 20.1 18.1 6.3 1.2 0.1 0 0 0.1 0.7 8 22.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 Sierraville sheet (1:125,000); the 1955 Loyalton sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationSierra Buttes Trail Stewardship
- Agency noticesTahoe National Forest alerts
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sierraville Ranger District Trail Closure — Tahoe National Forest, USDA Forest Service · government source · checked Oct 16, 2026 Supports: Forest Trail 16E87 commonly known as the Boca-Loyalton Trail, Sierraville Ranger District, Forest Order 17-25-13 of September 5, 2025 (trail washout closure order) running to September 5, 2026, closure from 1.2 miles south of the trailhead at the Alvin A. Powers Memorial Grove picnic area to Forest Road 860-40 (Lewis Mill Road)
- Alerts — Tahoe National Forest, USDA Forest Service · government source · checked Oct 16, 2026 Supports: closure of Forest Trail 16E87 still listed among current alerts in October 2026
- Peter Sagan rides the Historic Boca & Loyalton Trail — Sierra Buttes Trail Stewardship · organization · checked Oct 16, 2026 Supports: railroad built 1901 and run until 1916 carrying lumber from the Loyalton mill to the main line near Boca (near the Hirschdale exit on I-80), 1994 Cottonwood Fire damage, Stewardship restoration work and goal of a dirt connection between Truckee and Loyalton, Smithneck Canyon, nearly 400 riders on a 2.5-mile section during the inaugural Sagan Dirt Fondo from Truckee to Loyalton
- Loyalton/Boca Railroad Trail — Singletracks · web · checked Oct 16, 2026 Supports: about 2 miles built from a footbridge near the county park to Alder Creek Road and Smithneck Road, open to hikers, mountain bikers and equestrians, two cattle gates, first mile in the Cottonwood Fire burn scar with little shade, planned route of about 26 miles (text credited to fs.usda.gov)
- OpenStreetMap ways named Loyalton/Boca Railroad Trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: dirt surface, mapped extent of about 3.3 miles south of Loyalton
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.