States › South Carolina

Lyman Rail Trail

Rail-trail in South Carolina · OpenStreetMap relation

Runs through Lyman · Spartanburg County

Conditions now

Loading the weather near Lyman…

Forecast by the National Weather Service for Lyman · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.7 mi 1.1 km1
On former railbed
0.4 mi 50%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Upland Street mile 0.2 directions to trailhead 1
Lyman Rail Trail drawn on the 1957 USGS topographic map of Greer, South Carolina
Then: the 1957 USGS Greer sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Lyman Rail Trail is a paved rail-trail in the town of Lyman, South Carolina, built on the right-of-way of the old Springs/Pacific mill railroad tracks that once ran through Lyman's former mill village. Its first phase opened in April 2017, a stretch of about half a mile between Lawrence Street and Old Spartanburg Highway, and the town says the trail will be extended. SC Trails gives the first phase as 0.4 mile and reports that the town hopes to complete two more phases, for about 1.23 miles in all.

Parking is in the former mill lot at Pacific and Community Streets, behind Town Hall at 81 Groce Road; from there the trail is reached by crossing Spartanburg Road at the crosswalk. The Lyman Amphitheater stands beside the lot. SC Trails describes the trail running parallel to Groce Road, open from dawn to dusk, with pets allowed and a pet waste station.

This record maps about 0.7 mile in OpenStreetMap, in two pieces running north from a trailhead on Upland Street toward Lawrence Street, longer than the published length of the first phase; no source found dates an extension.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Greer, 11.3 km from the trail's middle, 23 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F535764738087908883736355
Low °F323541495866696862504035
Precipitation, in4.13.84.544.13.94.84.73.73.63.84.6
Snow, in1.610.600000000.10.6
Old maps

USGS topographic maps of the trail's middle go back to the 1935 Greer sheet (1:48,000); the 1957 Greer sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 15607331, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rail Trail — Town of Lyman, SC · government source · checked Oct 16, 2026
    Supports: old Springs/Pacific mill railroad right-of-way through the former mill village; phase one opened April 2017, about half a mile between Lawrence Street and Old Spartanburg Highway; to be extended; parking at Pacific and Community Streets behind Town Hall (81 Groce Road); Spartanburg Road crosswalk; Lyman Amphitheater
  3. Lyman Rail Trail — SC Trails · web · checked Oct 16, 2026
    Supports: 0.4 mile first phase; two more phases planned for about 1.23 miles; paved; parallel to Groce Road; dawn to dusk; pets allowed, pet waste station
  4. Lyman Rail Trail — OpenStreetMap relation 15607331 · web · checked Oct 16, 2026
    Supports: mapped length of about 0.7 mile in two pieces; Upland Street trailhead

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.