States › Florida

The Underline

Greenway in Florida

Runs through Kendall, Glenvar Heights, South Miami, Coral Gables and Miami · Miami-Dade County

Conditions now

Loading the weather near Coral Gables…

Forecast by the National Weather Service for Coral Gables · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Underline is a 10-mile-long (16 km) linear park under development in Miami-Dade County, Florida. When completed, it will run beneath the county's elevated Metrorail system between the Brickell neighborhood of Downtown Miami and Dadeland South station in Kendall. The project converts a pre-existing bicycle and pedestrian path known as the MetroPath or M-Path. At Dadeland South, the Underline connects with the South Dade Trail forming a continuous corridor extending south to Florida City.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
11.8 mi 19.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Dadeland Mall Circle East mile 0.4 directions to trailhead 1
  2. Parking at Southwest 88th Street mile 0.5 directions to trailhead 2
  3. Parking at Ludlam Road mile 0.9 directions to trailhead 3
  4. Parking at Southwest 80th Street mile 1.1 directions to trailhead 4
  5. Parking at Southwest 74th Street mile 1.6 directions to trailhead 5
  6. Parking at Southwest 74th Street mile 1.8 directions to trailhead 6
  7. Parking at Southwest 61st Court mile 1.8 directions to trailhead 7
  8. Parking at Southwest 74th Street mile 1.9 directions to trailhead 8
  9. Parking at Southwest 61st Ctcr mile 1.9 directions to trailhead 9
  10. Parking at Southwest 73rd Street mile 2 directions to trailhead 10
  11. Parking at Southwest 59th Avenue mile 2 directions to trailhead 11
  12. Parking at Yumuri Street mile 2.5 directions to trailhead 12
  13. Shake Shack Parking mile 2.6 directions to Shake Shack Parking
  14. Parking at South Alhambra Circle mile 2.8 directions to trailhead 14
  15. Lot 425-N (Yellow) mile 3.1 directions to Lot 425-N (Yellow)
  16. Parking at Mariposa Court mile 3.1 directions to trailhead 16
  17. Lot 307 (Pink) mile 3.3 directions to Lot 307 (Pink)
  18. Parking at Menendez Avenue mile 4.3 directions to trailhead 18
  19. Parking at Rosaro Avenue mile 4.3 directions to trailhead 19
  20. Parking at Rosaro Avenue mile 4.3 directions to trailhead 20
  21. Parking at Greco Avenue mile 4.7 directions to trailhead 21
  22. Parking at New York Street mile 5.5 directions to trailhead 22
  23. Parking at Southwest 32 Avenue mile 5.8 directions to trailhead 23
  24. Parking at Southwest 28th Terrace mile 6.2 directions to trailhead 24
  25. Parking at Southwest 16th Court mile 7.5 directions to trailhead 25
  26. Parking at Southwest 1st Avenue mile 8.1 · water directions to trailhead 26
  27. Parking at Southwest 1st Avenue mile 9.1 directions to trailhead 27
  28. Parking at Southwest 15th Road mile 9.3 directions to trailhead 28
  29. Parking at Southwest 1st Avenue mile 9.4 directions to trailhead 29
  30. Parking at Southwest 14th Street mile 9.4 directions to trailhead 30
  31. Parking at Southwest 1st Court mile 10.1 directions to trailhead 31
  32. Parking at Southwest 1st Court mile 10.1 directions to trailhead 32
Miami Underline walking path phase 2.jpg (opens in a new tab)
Miami Underline walking path phase 2.jpg · Photo: Dtobias · CC BY 4.0 · Wikimedia Commons

About this trail

The M-Path, or MetroPath, is the bicycle and pedestrian path beneath and beside Miami-Dade County's elevated Metrorail line, which the county is rebuilding as The Underline. The corridor runs about 10 miles from the Miami River in Brickell south through the City of Miami, Coral Gables and Kendall to Dadeland South station. The path was built largely alongside the opening of Metrorail in 1984, originally as a service road, on the former right-of-way of the Florida East Coast Railway's main line between Miami and Kendall, which was abandoned in 1972 and bought by the county in 1979. In late 2011 a 200-foot bridge over the entrance to the Snapper Creek Expressway near Dadeland North station completed a continuous route, apart from interruptions at major road crossings such as those near Coral Way and Douglas Road.

The Underline is a public-private partnership of the county's Department of Transportation and Public Works and its Parks, Recreation and Open Spaces Department, Friends of the Underline, and the cities of Miami and Coral Gables. Its first phase, the Brickell Backyard between the Miami River and SW 13th Street, opened on February 26, 2021. The 2.14-mile second phase, from SW 13th Street to SW 19th Avenue, opened on April 24, 2024. The county awarded the contract for the third phase, 7.36 miles from SW 19th Avenue near Vizcaya station to Dadeland South, on October 18, 2022, and expects the project to be completed in 2026.

When finished, the corridor, 70 to 170 feet wide, is to carry pedestrian and bicycle paths with improvements at more than 30 intersections and access to eight Metrorail stations. At Dadeland South it meets the South Dade Trail, which follows the former Florida East Coast Railway right-of-way to Florida City; together they form a corridor of about 32 miles within the East Coast Greenway. The record's map line measures about 11.8 miles.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Miami Wso City, 3.6 km from the trail's middle, 2 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F747678818487898988848077
Low °F646668727577807978767166
Precipitation, in2.32.322.64.68.74.25.87.362.62.5
Snow, in000000000000
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1950 South Miami sheet (1:24,000); the 1956 South Miami sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “The Underline”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q113859852, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. The Underline — Miami-Dade County Transportation and Public Works · government source · checked Oct 16, 2026
    Supports: public-private partnership (DTPW, PROS, Friends of the Underline, City of Miami, City of Coral Gables); Miami River to Dadeland South; Phase 1 Brickell Backyard opened Feb. 26, 2021, Miami River to SW 13th Street; Phase 2 opened April 24, 2024, 2.14 miles SW 13 Street to SW 19 Avenue; Phase 3 7.36 miles to Dadeland South, contract awarded Oct. 18, 2022; completion expected 2026; 10-mile corridor 70 to 170 feet wide; pedestrian and bicycle paths, over 30 intersections, eight Metrorail stations
  5. The Underline — Wikipedia · organization · checked Oct 16, 2026
    Supports: MetroPath or M-Path; route through Brickell, Coral Gables and Kendall; built largely alongside Metrorail's 1984 opening, originally a service road; former FEC main line right-of-way abandoned 1972, bought by the county 1979; 2011 Snapper Creek Expressway bridge and interruptions near Coral Way and Douglas Road; South Dade Trail connection and 32-mile corridor; East Coast Greenway
  6. OpenStreetMap ways for this trail · web · checked Oct 16, 2026
    Supports: mapped length of about 11.8 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.