States › North Carolina

Mallard Creek Greenway

Greenway in North Carolina · OpenStreetMap relation

Runs through Charlotte · Mecklenburg County

Conditions now

Loading the weather near Charlotte…

Forecast by the National Weather Service for Charlotte · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.7 mi 9.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Mallard Creek Greenway—David Taylor Drive intersection.jpg (opens in a new tab)
Mallard Creek Greenway—David Taylor Drive intersection.jpg · Photo: Firtreefields · CC0 · Wikimedia Commons

About this trail

Mallard Creek Greenway is a paved greenway along Mallard Creek in north Mecklenburg County, North Carolina, managed by Mecklenburg County Park and Recreation. The county describes its greenways as linear parks that connect people and places and also act as vegetated buffers that protect water quality, reduce flooding and provide wildlife habitat. Mallard Creek Greenway and Toby Creek Greenway are both portions of the Cross Charlotte Trail, which also includes Little Sugar Creek Greenway.

The county lists Mallard Creek Greenway together with the Barton Creek and Clarks Creek greenways as one 7.6-mile network running from Fairlea Drive and Amaranthus Court to Mallard Creek Church Road. All three connect to Toby Creek Greenway, which runs 2.9 miles from Mallard Creek Greenway near Kirk Farm Fields to Rocky River Road through the UNC Charlotte campus. A 2019 county guide gave the combined Clarks, Mallard, Toby and Barton Creek network as 10.74 miles, with parking at 9801 Mallard Creek Road, 201 East Mallard Creek Church Road and 8416 University City Boulevard.

Our map record covers about 5.7 miles in four pieces, which OpenStreetMap tags as a Mecklenburg County bicycle route on paved path and wooden boardwalk; two short pieces were mapped as under construction.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

65% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Concord, 18.6 km from the trail's middle, 29 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F535764748188929084746456
Low °F293138475665696760483732
Precipitation, in3.73.14.143.74.75.34.54.23.53.53.5
Snow, in1.11.30.4000000000.5
Old maps

USGS topographic maps of the trail's middle go back to the 1941 Charlotte sheet (1:125,000); the 1948 Derita sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

14 Reddit threads about this trail, Apr 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11777577, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Greenways — Mecklenburg County Park and Recreation · government source · checked Oct 16, 2026
    Supports: county management, greenways as linear parks and buffers, Mallard, Barton and Clarks Creek Greenways 7.6 miles from Fairlea Drive and Amaranthus Court to Mallard Creek Church Road, connection to Toby Creek Greenway, Mallard and Toby Creek as portions of the Cross Charlotte Trail, Toby Creek 2.9 miles from near Kirk Farm Fields to Rocky River Road through UNC Charlotte, Little Sugar Creek as part of the Cross Charlotte Trail
  3. Where We're Going We Don't Need Roads, Just Greenways — Mecklenburg County Blog (July 9, 2019) · government source · checked Oct 16, 2026
    Supports: north Mecklenburg grouping, Clarks, Mallard, Toby and Barton Creek 10.74 miles, parking addresses
  4. Mallard Creek Greenway — OpenStreetMap relation 11777577 · web · checked Oct 16, 2026
    Supports: mapped length, four pieces, bicycle route in the Mecklenburg network, paved and wood surfaces, pieces tagged as under construction

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.