Mallard Creek Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Charlotte · Mecklenburg County
Conditions now
Loading the weather near Charlotte…
Forecast by the National Weather Service for Charlotte · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
Mallard Creek Greenway is a paved greenway along Mallard Creek in north Mecklenburg County, North Carolina, managed by Mecklenburg County Park and Recreation. The county describes its greenways as linear parks that connect people and places and also act as vegetated buffers that protect water quality, reduce flooding and provide wildlife habitat. Mallard Creek Greenway and Toby Creek Greenway are both portions of the Cross Charlotte Trail, which also includes Little Sugar Creek Greenway.
The county lists Mallard Creek Greenway together with the Barton Creek and Clarks Creek greenways as one 7.6-mile network running from Fairlea Drive and Amaranthus Court to Mallard Creek Church Road. All three connect to Toby Creek Greenway, which runs 2.9 miles from Mallard Creek Greenway near Kirk Farm Fields to Rocky River Road through the UNC Charlotte campus. A 2019 county guide gave the combined Clarks, Mallard, Toby and Barton Creek network as 10.74 miles, with parking at 9801 Mallard Creek Road, 201 East Mallard Creek Church Road and 8416 University City Boulevard.
Our map record covers about 5.7 miles in four pieces, which OpenStreetMap tags as a Mecklenburg County bicycle route on paved path and wooden boardwalk; two short pieces were mapped as under construction.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
65% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Concord, 18.6 km from the trail's middle, 29 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 64 74 81 88 92 90 84 74 64 56 Low °F 29 31 38 47 56 65 69 67 60 48 37 32 Precipitation, in 3.7 3.1 4.1 4 3.7 4.7 5.3 4.5 4.2 3.5 3.5 3.5 Snow, in 1.1 1.3 0.4 0 0 0 0 0 0 0 0 0.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1941 Charlotte sheet (1:125,000); the 1948 Derita sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2025 and 2026 named Kirk Farm Fields as the trailhead; one rider in 2025 parked at the Harris Teeter near UNC Charlotte and noted water fountains at a pavilion and at Kirk Farm. r/Charlotte, Mar 2025 · r/Charlotte, Apr 2025 · r/Charlotte, Nov 2025 · r/Charlotte, Apr 2026
- Riders in 2025 said the route is paved apart from a gravel stretch of roughly three-quarters of a mile to a mile, from David Taylor Drive to Mallard Creek Road. r/Charlotte, Mar 2025 · r/Charlotte, Mar 2025 · r/Charlotte, Jul 2025
- Riders in 2025 described flooding along the golf course after very heavy rain, one saying the creek reached a nearby parking lot, and another described slippery mud near underpasses after storms. r/Charlotte, Mar 2025 · r/Charlotte, Mar 2025
- Riders in 2025 reported a Clarks Creek bridge out after a storm, cutting the full route short; one cyclist called the woods bypass hike-a-bike and would not take a child on it. r/Charlotte, Mar 2025 · r/Charlotte, Jul 2025 · r/CLT_Cyclists, Jul 2025
14 Reddit threads about this trail, Apr 2024 to May 2026
- Running in Charlotte r/Charlotte · Mar 2025 · 12 comments
- Recommended areas for jogging in University City? r/Charlotte · Mar 2025 · 10 comments
- clarks creek greenway bridge is being rebuilt! r/CLT_Cyclists · Jul 2025 · 6 comments
- Running Routes in Northern Charlotte r/Charlotte · Jul 2025 · 10 comments
- Good place for a long run? r/Charlotte · Apr 2025 · 53 comments
- Good areas to take long walks in? r/Charlotte · Nov 2025 · 6 comments
- Recommendation for Open-Field Parks in Charlotte r/Charlotte · Apr 2026 · 125 comments
- Clarks Creek Greenway Access r/Charlotte · Apr 2024 · 9 comments
- how university city massing SHOULD look r/Charlotte · May 2026 · 55 comments
- Ladies, be extremely careful walking or running on the Mallard Creek Greenway r/Charlotte · Jul 2025 · 121 comments
- Shout out to the Greenway maintenance team r/Charlotte · Sep 2024 · 9 comments
- Stories from Before Lake Norman? r/Charlotte · Jun 2024 · 19 comments
- Best hikes near Charlotte. Shade needed r/Charlotte · Jun 2024 · 32 comments
- Quiet & Isolated Places to Workout? r/Charlotte · May 2024 · 15 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesMecklenburg County Park and Recreation — Greenways
- RedditSearch Reddit: r/NorthCarolina
Nearby trails
- Clarks Creek Greenway within 0.2 mi · 2.8 mi, paved
- Cross Charlotte Trail within 0.2 mi · 22.3 mi, paved
- Hector H. Henry, II Greenway 2.4 mi away · 2.5 mi, paved
- Long Creek Greenway 3.3 mi away · 6.2 mi, paved
- Reedy Creek Greenway 3.5 mi away · 2.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 11777577, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Greenways — Mecklenburg County Park and Recreation · government source · checked Oct 16, 2026 Supports: county management, greenways as linear parks and buffers, Mallard, Barton and Clarks Creek Greenways 7.6 miles from Fairlea Drive and Amaranthus Court to Mallard Creek Church Road, connection to Toby Creek Greenway, Mallard and Toby Creek as portions of the Cross Charlotte Trail, Toby Creek 2.9 miles from near Kirk Farm Fields to Rocky River Road through UNC Charlotte, Little Sugar Creek as part of the Cross Charlotte Trail
- Where We're Going We Don't Need Roads, Just Greenways — Mecklenburg County Blog (July 9, 2019) · government source · checked Oct 16, 2026 Supports: north Mecklenburg grouping, Clarks, Mallard, Toby and Barton Creek 10.74 miles, parking addresses
- Mallard Creek Greenway — OpenStreetMap relation 11777577 · web · checked Oct 16, 2026 Supports: mapped length, four pieces, bicycle route in the Mecklenburg network, paved and wood surfaces, pieces tagged as under construction
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.