Mamakating O&W Rail Trail
Rail-trail in New York
Runs through Wurtsboro and Mamakating · Sullivan County
Conditions now
Loading the weather near Wurtsboro…
Forecast by the National Weather Service for Wurtsboro · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sullivan Street mile 3.1 directions to trailhead 1
- Parking at Mamakating O&W Rail Trail mile 3.1 directions to trailhead 2
- Big Oak Parking mile 5.3 directions to Big Oak Parking
- Parking at Mamakating O&W Rail Trail mile 6.2 directions to trailhead 4
- Parking at South Road mile 8.2 · restrooms directions to trailhead 5
- Parking at South Road mile 8.8 directions to trailhead 6
- Parking at South Road mile 9.3 directions to trailhead 7
- Parking at Butler Court mile 9.4 directions to trailhead 8
- Parking at Butler Court mile 9.4 directions to trailhead 9
(opens in a new tab) About this trail
This stretch is the part of the Mamakating Rail Trail between the Sullivan Street trailhead outside the Village of Wurtsboro and McDonald Road, about 1.4 miles one way on flat ground, on the former New York, Ontario & Western Railway in the Town of Mamakating, Sullivan County, New York. The Sullivan O&W Rail Trail Alliance calls the trailhead at 2 Sullivan Street, which has limited parking, the trail's most widely used. The stretch belongs to the 2.4-mile unpaved Summitville section, which continues to 377 Ferguson Road in Summitville, part of 14.1 miles of rail and towpath trails in Mamakating. The Alliance's notice says the stretch is closed from June 15 until October 30, 2026, for pedestrian bridge and culvert construction.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
NYOW Port Jervis Branch (New York Ontario & Western). From New York Abandoned Rail Lines (NYS OPRHP, 2020).
- Shade
70% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Middletown 2 NW, 10.4 km from the trail's middle, 59 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 37 47 60 70 78 82 81 73 62 50 39 Low °F 18 18 26 38 48 57 62 60 53 43 33 24 Precipitation, in 2.6 2.1 3 4 3.8 4.6 4.2 4.5 4.3 4.5 3.2 3.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1904 Ellenville sheet (1:62,500); the 1943 Wurtsboro sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationSullivan O&W Rail Trail Alliance
- FacebookSullivan O&W Rail Trail (Facebook)
- RedditSearch Reddit: r/newyork
Nearby trails
- Wurtsboro Ridge State Forest Lower O&W Rail Trail within 0.2 mi · 1.0 mi, dirt
- Wurtsboro Ridge State Forest Upper O&W Rail Trail within 0.2 mi · 4.2 mi, dirt
- D&H Canal Linear Park Towpath Trail 0.7 mi away · 1.3 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Mamakating Rail Trail — Sullivan O&W Rail Trail · web · checked Oct 14, 2026 Supports: Sullivan Street to McDonald Road about 1.4 miles of flat surface, 2 Sullivan Street most widely used trailhead with limited parking, Summitville section 2.4 miles unpaved with trailheads at 377 Ferguson Road, 136 McDonald Road and 2 Sullivan Street, 14.1 miles of trails along former rail lines and canal towpaths in Mamakating, closure June 15 to October 30, 2026 for pedestrian bridge and culvert construction
- History — Sullivan O&W Rail Trail · web · checked Oct 14, 2026 Supports: New York, Ontario & Western Railway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.