Maple City Greenway
Rail-trail in Indiana · OpenStreetMap relation
Runs through Elkhart, Dunlap and Goshen · Elkhart County
Conditions now
Loading the weather near Goshen…
Forecast by the National Weather Service for Goshen · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Logan Street mile 0 directions to trailhead 1
- Parking at North Cottage Avenue mile 0.2 directions to trailhead 2
- Parking at Middlebury Street mile 0.5 directions to trailhead 3
- Parking at West Oakridge Avenue mile 1 · restrooms directions to trailhead 4
- Parking at Beaver Lane mile 2 directions to trailhead 5
- Parking at Chicago Avenue mile 2.1 directions to trailhead 6
- Parking at County Home Road mile 5.2 directions to trailhead 7
- Parking at County Road 45 mile 5.5 directions to trailhead 8
- Parking at County Road 45 mile 7.4 directions to trailhead 9
(opens in a new tab) About this trail
Maple City Greenway is the City of Goshen, Indiana's name for its 27-mile network of bicycle and pedestrian trails linking homes, parks, schools, the library and downtown. Goshen Parks & Recreation describes seventeen trails in the network, among them the Millrace Trail beside the hydraulic canal, the Pumpkinvine Nature Trail toward Middlebury and Shipshewana, and the Wilden Avenue Trail. This record is not the whole network but a single mapped route of about 8.4 miles that OpenStreetMap carries under the network's name.
The mapped route starts in Goshen, crosses several bridges and runs northwest along Wilden Avenue, then continues as the MapleHeart Trail toward Elkhart. The city lists the Wilden Avenue Trail as a paved path 8 feet wide and 2.7 miles long that connects the MapleHeart Trail, Ox Bow County Park and the City of Elkhart. Elkhart County's biking and walking guide describes the MapleHeart as a direct route between Elkhart and Goshen that follows US 33 and the historic Lincoln Highway and parallels a busy railroad, with Ox Bow County Park as a halfway stop and a full one-way route of 11.6 miles from a Franklin Street parking lot in Elkhart to Abshire Park in Goshen.
The route is mostly asphalt, with concrete and crushed-stone stretches in Goshen.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Goshen 3sw, 6.7 km from the trail's middle, 28 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 36 47 60 72 80 83 81 75 63 48 36 Low °F 18 20 29 39 50 60 63 61 54 43 33 24 Precipitation, in 2.8 2.3 2.4 3.8 4.3 4.1 4 4 3.3 3.3 3 2.5 Snow, in 13.8 11.4 5.4 1.2 0 0 0 0 0 0.1 3.4 9.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1953 Fort Wayne sheet (1:250,000); the 1960 Foraker sheet (1:24,000) shows the area at mid-century. Browse all 4 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesGoshen Parks & Recreation: Trails
- RedditSearch Reddit: r/Indiana
Nearby trails
- Elkhart River Greenway 0.2 mi away · 1.8 mi, paved
- Pumpkinvine Nature Trail 0.3 mi away · 4.9 mi, paved
- Millrace Trail 0.9 mi away · 1.3 mi, gravel
- Winona Interurban Trail 1.5 mi away · 1.4 mi, paved
- Riverwalk 1.9 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9714333, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Trails — City of Goshen, Indiana · government source · checked Oct 15, 2026 Supports: Maple City Greenway is a 27-mile network linking homes, parks, schools, library and downtown; seventeen trails described; Millrace Trail along the hydraulic canal; Pumpkinvine Nature Trail toward Middlebury and Shipshewana; Wilden Avenue Trail paved, 8 feet wide, 2.7 miles, connecting MapleHart Trail, Ox Bow County Park and City of Elkhart
- MapleHeart Trail — Elkhart County Biking & Walking Guide (2017) · web · checked Oct 15, 2026 Supports: MapleHeart follows US 33 and the historic Lincoln Highway as a direct route between Elkhart and Goshen; parallels one of the busiest railroads in the region; access points Franklin St parking lot in Elkhart, Sterling Ave and Lusher Ave, Ox Bow County Park, Abshire Park in Goshen; 11.6 miles one-way
- Maple City Greenway, relation 9714333 — OpenStreetMap · web · checked Oct 15, 2026 Supports: the mapped route: name, extent from Goshen northwest along Wilden Avenue and the MapleHeart Trail toward Elkhart, bridges, asphalt, concrete and fine-gravel surfaces
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.