States › New York

Maple City Trail

Rail-trail in New York

Runs through Ogdensburg and Oswegatchie · St. Lawrence County

Conditions now

Loading the weather near Ogdensburg…

Forecast by the National Weather Service for Ogdensburg · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.1 mi 1.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

City of Ogdensburg, along the trail (opens in a new tab)
City of Ogdensburg, along the trail · Photo: P199 · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Maple City Trail is a city trail in Ogdensburg, New York, that follows the Oswegatchie River. This record maps about 1.1 miles of it, the paved section on a former railroad bed along the river that leads south to the Black Bridge, an abandoned railroad bridge over the Oswegatchie.

Another section of the trail runs low along the river below Crescent Street between the Lake Street Pedestrian Bridge and the Pump House; the city closed it for flooding in April 2014 and later kept it closed because of erosion, while reopening the railbed section to the Black Bridge.

The county gave the Black Bridge to the city for $1, and in September 2017 the city council committed to pay 20 percent of a $2,056,000 Maple City Rail Trail project, with a federal transportation grant covering the other 80 percent. The project would rehabilitate the bridge as a walking bridge and add about 2,400 feet of trail. Plans presented in 2018 called for a shared-use path 10 feet wide with 2-foot shoulders and an asphalt surface, running from the trail's end at the north end of the bridge across the river, then south and east to State Route 812, with a sidewalk link to Route 812; construction was then slated for 2019.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

NYC Dekalb Branch and Dekalb Branch (Penn Central Transportation Co.). From New York Abandoned Rail Lines (NYS OPRHP, 2020).

Shade

34% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Canton 4 SE, 32.3 km from the trail's middle, 56 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F273039536775807871584534
Low °F7819324555595749382816
Precipitation, in2.222.333.13.83.93.43.94.82.92.6
Snow, in18.917.512.53.5000000.25.119.6
Old maps

USGS topographic maps of the trail's middle go back to the 1904 Ogdensburg sheet (1:62,500); the 1963 Ogdensburg East sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Public meeting planned in Ogdensburg to discuss Black Bridge project — North Country Now (September 5, 2018) · web · checked Oct 14, 2026
    Supports: Maple City Rail Trail project to convert the abandoned railroad corridor and the Black Bridge over the Oswegatchie River into a bicycle and pedestrian trail with TAP funding; existing Maple City Trail ending at the north end of the bridge; route south then east to State Route 812; sidewalk to Route 812; 10 feet wide, 2-foot shoulders, asphalt; slated for construction in 2019
  3. Ogdensburg commits to $400,000 share of Maple City Rail Trail project, planner says grants should cover costs — North Country Now (September 16, 2017) · web · checked Oct 14, 2026
    Supports: city share 20 percent ($400,000) of the $2,056,000 project; 80 percent federal DOT grant; rehabilitate the abandoned railroad bridge (Black Bridge) as a walking bridge; about 2,400 feet of added trail; bridge given to the city by the county for $1
  4. Part of Maple City Trail in Ogdensburg closed due to flooding — North Country Now (April 10, 2014) · web · checked Oct 14, 2026
    Supports: section from the Lake Street Pedestrian Bridge to the Pump House closed for flooding; lies low along the Oswegatchie River below Crescent Street
  5. Section of Ogdensburg's Maple City Trail to remain closed — NNY360 (April 22, 2014) · web · checked Oct 14, 2026
    Supports: Lake Street Pedestrian Bridge to Pump House section to remain closed for erosion; section following the former railroad bed along the Oswegatchie River to the Black Bridge reopened

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.