States › Minnesota

Mark Sather Trail

Greenway in Minnesota

Runs through White Bear Lake · Ramsey County

Conditions now

Loading the weather near White Bear Lake…

Forecast by the National Weather Service for White Bear Lake · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.4 mi 3.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at White Bear Avenue mile 0.3 · restrooms · water directions to trailhead 1
  2. Parking at North Highway 61 mile 0.5 directions to trailhead 2
  3. Parking at Lake Avenue South mile 0.5 · restrooms · water directions to trailhead 3
  4. Parking at Lake Avenue South mile 0.6 · water directions to trailhead 4
  5. Parking at Lake Avenue mile 2.2 · restrooms · water directions to trailhead 5
  6. Parking at Pacific Avenue mile 2.4 · restrooms · water directions to trailhead 6
Mark Sather Trail (opens in a new tab)
Photo: louckssurveying · CC BY-SA 4.0 · Mapillary

About this trail

The Mark Sather Trail is a 2.5-mile paved, off-street path on the west side of White Bear Lake in the city of White Bear Lake, Minnesota, in Ramsey County. It is one segment of the Lake Links Trail, a planned 10-mile walking and biking loop around the lake that combines separated paths with low-traffic streets.

A shared-use path around the lake was first proposed in the 2001 Lake Links Trail Network Master Plan. In the 1990s the City of White Bear Lake had converted Lake Avenue between Highway 61 and 11th Street from a two-way road to a one-way road with a separated 10-foot path. After local residents formed the Lake Links Association in 2017, the Minnesota Legislature allocated $130,000 that year to the city to complete the Mark Sather Trail from Lions Park to South Shore Boulevard. The association now describes the Lake Avenue trail as complete; the adjoining South Shore segment was funded in 2018 and finished in 2023.

The trail runs from South Shore Boulevard north along Lake Avenue to Highway 96, linking the docks, Matoska Park, Memorial Beach Park and White Bear Lake County Park. Beyond its ends the loop continues on the South Shore Boulevard path and on quiet streets through Mahtomedi and Birchwood; the Highway 96 and Highway 244 (Dellwood) segments were still in planning, and riders there use the roadway. The surface is asphalt, and parking is available at Matoska Park, 2345 5th Street, and White Bear Lake County Park, 5050 Lake Avenue.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Vadnais Lake, 7.9 km from the trail's middle, 15 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F253042566979838173594330
Low °F81124375060646254422816
Precipitation, in0.80.81.53.14.34.54.54.53.13.11.81.1
Old maps

USGS topographic maps of the trail's middle go back to the 1902 White Bear sheet (1:62,500); the 1952 White Bear Lake West sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Mark Sather Trail (opens in a new tab)
  1. 360° view 1 of 3, photo by louckssurveying
  2. 360° view 2 of 3, photo by louckssurveying
  3. 360° view 3 of 3, photo by Sambatek
360° panorama · Photo: louckssurveying · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. About Us — Lake Links Association · web · checked Oct 15, 2026
    Supports: 2001 master plan, 1990s Lake Avenue conversion and 10-foot path, 2017 formation of the association, 2017 $130,000 allocation to complete the Mark Sather Trail from Lions Park to South Shore, South Shore segment funded 2018 and completed 2023
  3. Frequently Asked Questions — Lake Links Association · web · checked Oct 15, 2026
    Supports: 10-mile loop goal, Mark Sather Trail (Lake Avenue) completed, quiet streets in Mahtomedi and Birchwood, Highway 96 and Highway 244 segments in planning
  4. Mark Sather Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 15, 2026
    Supports: 2.5-mile length, Ramsey County, west side of the lake, South Shore Boulevard to Lake Avenue and Highway 96, parks linked, asphalt surface, parking addresses

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.