Matt Glover Bike Path
Greenway in Alaska
Runs through Fairbanks · Fairbanks North Star Borough
Conditions now
Loading the weather near Fairbanks…
Forecast by the National Weather Service for Fairbanks · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Matt Glover Bike Path is a paved bicycle and pedestrian path of about 5 miles along the Richardson Highway in the Fairbanks area of Alaska, between Airport Way and Badger Road. It connects the Badger Road bike path toward North Pole with the Fairbanks path system, a link that Alaska's News Source reported had not existed before.
The path is named for Matt Glover, a Fairbanks-area cyclist who was killed in 2022 during his regular bicycle commute between North Pole and Fairbanks. Senate Bill 129, naming the path, passed the Alaska Legislature unanimously in 2024. The Alaska Department of Transportation and Public Facilities announced a dedication ceremony for Saturday, May 24, 2025, followed by a community ride hosted by the Fairbanks Cycle Club. The department said it could add the signs to an ongoing construction project rather than seek donations.
News reports described the path as complete in fall 2024. The department's dedication notice warned that construction might limit access near Fort Wainwright, and it listed parking at the U.S. Federal Building and Courthouse and at the Morris Thompson Cultural Center.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- When to ride
Best months: May to August. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Aurora, 5.6 km from the trail's middle, 3 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 0 13 27 47 63 72 73 66 55 34 12 3 Low °F -15 -9 0 21 37 48 52 46 35 18 -3 -11 Precipitation, in 0.6 0.4 0.3 0.3 0.6 2 2.6 2.4 1.6 0.8 0.7 0.5 Snow, in 8.7 9.6 6.1 2.8 0.2 0 0 0 1.3 5.4 13.2 10.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1949 Fairbanks D-2 sheet (1:62,500); the 1966 Fairbanks D-2 SE sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesAlaska DOT&PF press release on the dedication
Nearby trails
- Johansen Expressway Trail 1.7 mi away · 2.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Matt Glover Bike Path dedication — Alaska DOT&PF press release · government source · checked Oct 17, 2026 Supports: route between Airport Way and Badger Road, name from Senate Bill 129, May 24 dedication, Fairbanks Cycle Club ride, parking, construction near Fort Wainwright
- New bicycle path connecting North Pole and Fairbanks honors beloved bike enthusiast — Alaska's News Source · press · checked Oct 17, 2026 Supports: namesake, 2022 crash, link of Badger Road path to Fairbanks system, completed fall 2024, bill passed unanimously, signage
- OpenStreetMap ways for this trail · web · checked Oct 17, 2026 Supports: paved surface and approximate length of about 5 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.