Mattabesset Trolley Trail
Trolley trail in Connecticut · OpenStreetMap relation
Runs through Town of Middletown and Middletown
Conditions now
Loading the weather near Middletown…
Forecast by the National Weather Service for Middletown · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
About this trail
The Mattabesset Trolley Trail, also spelled Mattabassett or Mattabesett and called the Mattabesset Bike Path, is a paved multi-use trail in the Westlake area of northern Middletown, Connecticut, on the south bank of the Mattabesset River. Much of it follows an old trolley line behind homes off Tuttle Road and West Lake Drive. The New York, New Haven and Hartford Railroad's lines from Middletown to Berlin, Cromwell and Meriden were electrified for trolley service in 1906, and streetcars served Middletown until 1929. A 1.75-mile section called the Tuttle Loop was opened with a ribbon cutting on July 29, 2014, bringing the combined trail system from Middle Street to Tuttle Place to 5.0 miles.
The western end is on Westlake Drive just north of Russet Lane, where a crosswalk joins the trail to the Westlake Area Bikeway. The path runs north past West Lake, reaches the old trolley bed, crosses a bridge over Minor Brook and passes beneath East Street (Route 217) beside the river before continuing east. A spur leads south to Moss Glen and Tuttle Road, and the eastern end is at the Tuttle Place industrial park, where a bike lane and the paved Tuttle Road Trail form a loop back to Moss Glen. West of the trail, an old trestle over the Mattabesset River survives without decking. The Central Connecticut Loop Trail study, completed for RiverCOG in April 2025, placed the trail on its preferred route between the Air Line Trail in Portland and the Farmington Canal Heritage Trail.
The surface is asphalt with a yellow center stripe, and grades are gentle. The trail is open dawn to dusk and has no designated parking. Sources give lengths from about 1.8 to 2.9 miles. A three-quarter-mile shared-use path, funded for design, would extend the trail south from Tuttle Road past Lawrence School as the northern part of the planned Newfield Corridor Trail.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Meriden Markham Municipal Airport, 15.1 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 39 48 60 70 79 84 82 75 64 52 42 Low °F 19 20 28 38 48 57 62 61 54 42 32 24 Precipitation, in 3 2.9 4 4.1 3.5 4 3.4 3.5 4.3 4.5 3.4 4.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1893 Middletown sheet (1:62,500); the 1952 Middletown sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationThe Jonah Center for Earth & Art: Bicycling, Walking & Multi-Use Trails
- Agency noticesCity of Middletown: Mattabesett Trolley Bikeway plan
Nearby trails
- Westlake Area Bikeway within 0.2 mi · 2.2 mi, paved
- Air Line Trail 4.8 mi away · 55.4 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13298592, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Central Connecticut Loop Trail Study, Appendices (April 2025) — RiverCOG · organization · checked Oct 13, 2026 Supports: Mattabesset Multi-Use Trail runs about two miles near the Mattabesset River in north Middletown, much of it on an old trolley line behind properties off Tuttle Road and W. Lake Drive; Westlake bikeway starts at its west terminus; 3/4-mile shared-use path funded for design past the east side of Lawrence School to Tuttle Road
- Central CT Loop Trail Study — RiverCOG · organization · checked Oct 13, 2026 Supports: study linking the Air Line Trail and the Farmington Canal Heritage Trail through the Mattabesset Trolley Trail system; final report April 2025
- Central CT Loop Trail Study Results (Dec. 9, 2024) — The Jonah Center for Earth & Art · organization · checked Oct 13, 2026 Supports: preferred route follows the Mattabesset Bike Path to Tuttle Road; planned extension south past Lawrence School, the northern part of the Newfield Corridor Trail
- The Connecticut Trolley System – Middlesex County — Shore Line Trolley Museum · organization · checked Oct 13, 2026 Supports: NYNH&H lines from Middletown to Berlin, Cromwell and Meriden electrified in 1906; streetcars served Middletown until 1929
- Ribbon Cutting For Newly Completed "Tuttle Loop" of Bike and Walking Path (July 2014) — The Jonah Center for Earth & Art · organization · checked Oct 13, 2026 Supports: 1.75-mile Tuttle Loop ribbon cutting July 29 [2014] at Tuttle Place, trail system from Middle Street to Tuttle Place now 5.0 miles
- Mattabesett Trolley Trail — Bike It or Hike It · web · checked Oct 13, 2026 Supports: 1.8-mile paved trail, route past West Lake to the old rail bed, Minor Brook bridge, Route 217 underpass, Moss Glen spur, Tuttle Place and Tuttle Road Trail loop, undecked trestle over the Mattabesett River west of the trail
- Mattabassett Trolley Trail — TrailLink · web · checked Oct 13, 2026 Supports: 2.9 mi, south bank of the river, blacktop with yellow center striping, start on Westlake Drive north of Russet Lane, East Street/SR 217 underpass, Moss Glen spur, Tuttle Place end and loop, Westlake Area Bikeway connection, dawn to dusk, no designated parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.