Mattapoisett Rail Trail
Rail-trail in Massachusetts
Runs through Mattapoisett and Mattapoisett Center · Plymouth County
Conditions now
Loading the weather near Mattapoisett Center…
Forecast by the National Weather Service for Mattapoisett Center · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Reservation Road mile 0.3 directions to trailhead 1
(opens in a new tab) About this trail
The Mattapoisett Rail Trail is a multi-use path in Mattapoisett, Massachusetts, on the bed of the former Fairhaven Branch Railroad. Its friends group describes a partially completed path of 4.5 miles along the shore of Buzzards Bay, through the village and into wooded areas; this record maps about 1.7 miles of the completed western part, which continues at the Fairhaven town line as the Phoenix Rail Trail. The Friends of the Mattapoisett Bicycle and Recreational Path raises money for items the town government cannot fund.
The Fairhaven Branch Railroad, chartered in 1851 and built from 1852 to 1854, ran about 15 miles from Fairhaven through Mattapoisett and Marion to the Cape Cod main line at West Wareham; it was formally abandoned between Fairhaven and Marion on April 2, 1953. In 1996 a resident built a footbridge across the outlet of Eel Pond, opening a 0.5-mile stretch of the right-of-way to recreation. The first mile of trail, from the Fairhaven line to Mattapoisett Neck Road, opened in 2009, according to the friends group. A $9 million federal grant in 2019 funded the next 1.28 miles, made costly by construction through sensitive wetlands; it opened from Mattapoisett Neck Road to Reservation Road in July 2022 and to the end of Goodspeed Island Road in April 2023.
At the eastern end of the planned route, a half-mile connector toward Marion opened in 2021; the Town of Marion plans to begin building its path in late 2026 or early 2027. Phase 2A, from Route 6 at Railroad Avenue to the park-and-ride on North Street, is in design, and the Industrial Drive section from North Street to the connector is largely designed and funded. Parking is at Depot Street and Railroad Avenue, with a few spaces at Brandt Island Road and Old Town Landing; parking on Reservation Road is not allowed.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
49% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
New Bedford Coop, 8.7 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 40 47 56 68 78 84 82 75 64 53 43 Low °F 22 23 29 40 50 60 67 66 59 48 37 28 Precipitation, in 3.8 4.1 5.3 4.6 3.7 4.2 3.6 4.1 4.2 4.9 4.6 5.2 Snow, in 10.9 8.5 6.6 1.7 0 0 0 0 0 0 0.4 4.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1885 New Bedford sheet (1:62,500); the 1962 Marion sheet (1:24,000) shows the area at mid-century. Browse all 18 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Mattapoisett Rail Trail
- FacebookFriends of the Mattapoisett Rail Trail (Facebook)
Nearby trails
- Phoenix Rail Trail within 0.2 mi · 3.2 mi, paved
- Saulnier Memorial Bike Trail 4.4 mi away · 2.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Fairhaven Branch Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: charter 1851, construction 1852-1854, route Fairhaven to West Wareham through Mattapoisett and Marion, about 15 miles, abandonment Fairhaven-Marion April 2, 1953, 1996 Eel Pond footbridge and 0.5-mile section, Phoenix Rail Trail to the Mattapoisett line, $9 million CMAQ grant 2019 for 1.28 miles, wetlands cost, opening April 2023
- Friends of the Mattapoisett Rail Trail — Friends of the Mattapoisett Bicycle & Recreational Path · web · checked Oct 13, 2026 Supports: 4.5-mile partially completed path along Buzzards Bay, through the town and woods; fundraising for items the town cannot fund; first mile opened 2009 to Mattapoisett Neck Road; Mattapoisett Neck Road to Reservation Road July 2022; to Goodspeed Island Road April 2023; Phase 2A in design; Industrial Drive section designed and funded; half-mile connector opened 2021; Marion construction late 2026 to early 2027; parking locations and Reservation Road restriction
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
