McAlpine Creek Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Charlotte · Mecklenburg County
Conditions now
Loading the weather near Charlotte…
Forecast by the National Weather Service for Charlotte · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Monroe Road mile 2.7 directions to trailhead 1
- Parking at Monroe Road mile 2.7 directions to trailhead 2
(opens in a new tab) About this trail
The McAlpine Creek Greenway follows McAlpine Creek through southeast Charlotte, North Carolina, and is run by Mecklenburg County Park and Recreation. Built in 1978, it is described by the Carolina Thread Trail as the first public greenway constructed in North Carolina's western Piedmont. The ruins of the Lucas family grist mill, built in the early 1900s, stand beside the trail. At McAlpine Creek Park it meets the paved Campbell Creek Greenway; the county's 2019 greenway guide gives 4.77 miles for the combined Campbell and McAlpine Creek segment from Lockmont Drive to Sardis Road, and the Thread Trail lists the two greenways together as 6.2 miles one way.
Our map record follows the greenway for about 3.8 miles in OpenStreetMap, from near Providence Road (NC 16) northeast past a parking area on Old Bell Road and parking on Monroe Road to McAlpine Creek Park, ending in the park where the Campbell Creek Greenway begins. The county lists parking at McAlpine Creek Park (8711 Monroe Road), James Boyce Park (300 Boyce Road), 110 Old Bell Road and 2116 Margaret Wallace Road. A separate, downstream stretch of McAlpine Creek Greenway, between Johnston Road and Carmel Road, belongs to the county's Lower McAlpine, McMullen and Four Mile Creek greenway system and is not part of this record; the county began design for its repaving and repair in fall 2025.
The Carolina Thread Trail describes the McAlpine section as mostly crushed gravel, with boardwalk, sidewalk and paved pieces. OpenStreetMap currently maps most of the record's route as concrete or asphalt, with about 0.7 miles of fine gravel north of Monroe Road and several short bridges. The greenway is open dawn to dusk with no fee; leashed pets are allowed, motor vehicles are not, and the Thread Trail page lists no restrooms.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Monroe Airport, 19 km from the trail's middle, 34 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 64 73 80 87 90 88 83 73 63 55 Low °F 32 35 41 49 57 65 69 68 62 50 40 34 Precipitation, in 3 2.8 3.2 2.9 2.9 3.7 3.6 3.8 3.2 3 2.9 3 - Old maps
USGS topographic maps of the trail's middle go back to the 1905 Charlotte sheet (1:48,000); the 1949 Charlotte East sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationMcAlpine Creek and Campbell Creek Greenway — Carolina Thread Trail
Nearby trails
- Campbell Creek Greenway within 0.2 mi · 2.2 mi, paved
- Four Mile Creek Greenway 2.7 mi away · 5.4 mi, paved
- Lower McAlpine Creek Greenway 4.1 mi away · 3.1 mi, paved
- Cross Charlotte Trail 4.4 mi away · 22.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10384554, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Where We're Going We Don't Need Roads, Just Greenways — Mecklenburg County Blog (July 9, 2019) · government source · checked Oct 16, 2026 Supports: Campbell & McAlpine Creek segment 4.77 miles, Lockmont Drive to Sardis Road; parking at 8711 Monroe Road, 300 Boyce Road, 110 Old Bell Road, 2116 Margaret Wallace Road; Lower McAlpine, McMullen & Four Mile Creek as a separate segment
- McAlpine and McMullen Creek Greenway Reinvestment Project — Mecklenburg County · government source · checked Oct 16, 2026 Supports: separate McAlpine Creek Greenway section from Johnston Road to Carmel Road; design began fall 2025
- McAlpine Creek and Campbell Creek Greenway — Carolina Thread Trail · organization · checked Oct 16, 2026 Supports: managed by Mecklenburg County Park and Recreation; built 1978, first public greenway in the western Piedmont; Lucas family grist mill ruins; 6.2 miles one way combined; McAlpine mostly crushed gravel, Campbell Creek paved; connection at McAlpine Creek Park; dawn to dusk, no fees, leashed pets, no motor vehicles, no restrooms listed
- McAlpine Creek Greenway — OpenStreetMap relation 10384554 · web · checked Oct 16, 2026 Supports: mapped length about 3.8 miles, route from near Providence Road to McAlpine Creek Park and the Campbell Creek Greenway, Old Bell Road and Monroe Road parking, concrete/asphalt with about 0.7 miles of fine gravel, short bridges
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.