States › North Carolina

McMullen Creek Greenway

Greenway in North Carolina · OpenStreetMap relation

Runs through Charlotte · Mecklenburg County

Conditions now

Loading the weather near Charlotte…

Forecast by the National Weather Service for Charlotte · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.3 km1
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Pineville-Matthews Road mile 2 · water directions to trailhead 1
McMullen Creek Greenway May 2022 (opens in a new tab)
McMullen Creek Greenway May 2022 · Photo: City Dweller 2 · CC BY-SA · Wikimedia Commons

About this trail

McMullen Creek Greenway is a greenway of about 2 miles along McMullen Creek in south Charlotte, Mecklenburg County, North Carolina, and part of the county's greenway system, managed by Mecklenburg County Park and Recreation. The creek lies within the Catawba River Basin, and the greenway corridor protects woodland, floodplain and wetland habitat, including the first documented great blue heron rookery in the county.

The greenway runs from Highway 51 (Pineville-Matthews Road) to McAlpine Creek Greenway at Carmel Road. With the Lower McAlpine Creek and Four Mile Creek greenways it forms one connected route, which Wikipedia gives as about 5.8 miles; the county says the McAlpine Creek Greenway segment from NC 51 to Johnston Road, opened in December 2025, extended the McAlpine, McMullen and Four Mile system to 7.5 miles. A planned Little Sugar-McMullen Connection would join Little Sugar Creek Greenway at Highway 51 to these greenways.

Surfaces include pavement, crushed gravel and wooden boardwalks over swampy floodplain; OpenStreetMap shows gravel stretches and boardwalk bridges among the asphalt, and parking with water near Pineville-Matthews Road. The county's McAlpine and McMullen Creek Greenway Reinvestment Project, in design since fall 2025, covers repairs to paving, bridges, boardwalks, wayfinding, parking areas and restrooms along McMullen Creek Greenway and along McAlpine Creek Greenway from Johnston Road to Carmel Road; the county describes that combined stretch as about 4 miles with 11 access trails and two trailheads.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

71% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rock Hill York County Airport, 20.2 km from the trail's middle, 44 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525664748087908983736355
Low °F313440485766696862493933
Precipitation, in3.53.13.83.53.24443.433.23.6
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Charlotte sheet (1:48,000); the 1968 Weddington sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12607894, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. McAlpine and McMullen Creek Greenway Reinvestment Project — Mecklenburg County (PublicInput) · government source · checked Oct 16, 2026
    Supports: route from Highway 51/Pineville-Matthews Road to McAlpine Creek Greenway at Carmel Road; about 4 miles with 11 access trails and two trailheads; repair scope; design began fall 2025
  3. Greenway Trail Projects — Mecklenburg County (PublicInput) · government source · checked Oct 16, 2026
    Supports: McAlpine Creek Greenway NC-51 to Johnston Road opened December 2025, system to 7.5 miles; planned Little Sugar-McMullen Connection
  4. McMullen Creek — Wikipedia · organization · checked Oct 16, 2026
    Supports: south Charlotte location; Catawba River Basin; part of the Mecklenburg County Greenway System; connected route of about 5.8 miles; pavement, crushed gravel and boardwalk surfaces; woodland, floodplain and wetland habitat; first documented great blue heron rookery in the county
  5. Relation: McMullen Creek Greenway — OpenStreetMap · web · checked Oct 16, 2026
    Supports: asphalt, gravel and wooden bridge segments; parking with water near Pineville-Matthews Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.