States › Texas

Mesquite Heritage Trail

Greenway in Texas · OpenStreetMap relation

Runs through Mesquite (Dallas County) · Dallas County

Conditions now

Loading the weather near Mesquite…

Forecast by the National Weather Service for Mesquite · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.5 mi 8.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Americana Lane mile 1.6 · water directions to trailhead 1
  2. Parking at Town East Mall mile 1.7 directions to trailhead 2
  3. Parking at Greenbelt Parkway mile 4.7 directions to trailhead 3
Mesquite Heritage Trail July 2019 1.jpg (opens in a new tab)
Mesquite Heritage Trail July 2019 1.jpg · Photo: Michael Barera · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Mesquite Heritage Trail is a paved hike-and-bike trail owned by the City of Mesquite in Dallas County, Texas, billed as the city's largest recreation facility. It links neighborhoods with schools, shopping and parks. TrailLink gives its length as 4.26 miles, from Towne Centre Drive and Franklin Drive northeast to the westbound frontage road of Interstate 30 next to Northwest Drive; this record maps about 5.5 miles.

The trail is mostly concrete and has several at-grade road crossings. A pedestrian bridge carries it over North Mesquite Creek in Kimbrough Park, and an exercise station stands at Palos Verde Lake Park. Parking is available mid-trail beside the Kimbrough Athletic Complex off Green Canyon Drive and near the southern end off Americana Lane.

The trail has been extended at both ends. In 2021 Mesquite announced a half-mile extension from Northwest Drive to an existing Garland trail, part of the Mesquite-Garland-Richardson Bikeway Connectors, meant to let Mesquite residents reach the Lake Ray Hubbard park-and-ride in Garland; state records show the city building a trail in utility easements at 501 Northwest Drive between July 2021 and January 2022 for about $642,000. Dallas County lists Garland's connections from the Heritage Trail to the Duck Creek Trail at the DART Lake Ray Hubbard Transit Center, and to Rosehill Road and Ablon Park over a 100-foot bridge, as complete. At the south end, Phase 2, a 1.3-mile segment at Towne Centre Drive with a bridge and retaining wall, was built from June 2024 to September 2025 at an estimated $6.8 million; its state accessibility inspection is complete. Dallas County says Phase 2 makes a continuous trail of more than 10 miles with Garland's trails, and that a final segment is to be built by the Texas Department of Transportation when it rebuilds US 80.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dallas Love Field, 23 km from the trail's middle, 26 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F586270778593979790806859
Low °F384249576674787770594840
Precipitation, in2.62.83.53.14.63.81.72.23.14.82.93.2
Snow, in0.10.90.300000000.10.3
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1959 Mesquite sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, Apr 2024

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18476065, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Project TABS2026000610, Mesquite Heritage Trail Phase 2 — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: City of Mesquite as owner; 2150 Towne Centre Dr; start June 3, 2024, completion September 30, 2025; estimated cost $6,845,385; paving, drainage, bridge and retaining wall; status Inspection Complete
  3. Project TABS2021014797, Mesquite Garland Trail — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026
    Supports: City of Mesquite; 501 Northwest Drive; hike and bike trail in utility easements; July 5, 2021 to January 31, 2022; estimated cost $642,130; project closed
  4. Hike and bike trails to connect Mesquite, Garland and Richardson by next year — City of Mesquite News Flash (May 7, 2021) · government source · checked Oct 15, 2026
    Supports: Heritage Trail runs from I-30 to Northwest Drive; half-mile extension to an existing Garland trail as part of the Mesquite-Garland-Richardson Bikeway Connectors; access to the Lake Ray Hubbard Park and Ride
  5. Status of Trail Projects in Commissioner District 1 with Dallas County Participation, July 2025 — Dallas County · organization · checked Oct 15, 2026
    Supports: Heritage Trail Phase 2, 1.3-mile segment, construction began June 2024, estimated completion fall 2025, continuous trail beyond 10 miles with 3.5 miles in Mesquite and 5.7 in Garland, final segment by TxDOT during US 80 reconstruction; Duck Creek Greenbelt Southern Extension from the Heritage Trail to Rosehill Road / Ablon Park with 100-foot bridge, complete; Duck Creek Trail Connections from the DART Lake Ray Hubbard Transit Center to the Heritage Trail, complete
  6. Mesquite Heritage Trail — TrailLink · web · checked Oct 15, 2026
    Supports: billed as the city's largest recreation facility; connects neighborhoods to schools, shopping and parks; 4.26 miles; Towne Centre Dr & Franklin Dr to westbound I-30 frontage road next to Northwest Dr; concrete pathway (asphalt and concrete listed); at-grade crossings; pedestrian bridge over North Mesquite Creek in Kimbrough Park; exercise station at Palos Verde Lake Park; parking off Green Canyon Drive and Americana Lane
  7. Mesquite Heritage Trail, relation 18476065 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped extent of about 5.5 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.