States › Ohio

MetroParks Bikeway

Rail-trail in Ohio · OpenStreetMap relation

Runs through Niles, Mineral Ridge and Canfield · Trumbull and Mahoning counties

Conditions now

Loading the weather near Austintown…

Forecast by the National Weather Service for Austintown · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Mill Creek MetroParks.

Length
14.7 mi 23.7 km1
On former railbed
14.0 mi 95%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Harold Street mile 6.5 directions to trailhead 1
  2. Parking at Kirk Road mile 8.7 · restrooms · water directions to trailhead 2
  3. Parking at Kirk Road mile 8.7 · restrooms · water directions to trailhead 3
  4. Parking at North Briarcliff Drive mile 11.3 directions to trailhead 4
  5. Parking at West Main Street mile 11.9 directions to trailhead 5
MetroParks Bikeway (opens in a new tab)
Photo: gtaylor · CC BY-SA 4.0 · Mapillary

About this trail

The MetroParks Bikeway is an 11-mile paved rail-trail in Mahoning County, Ohio, running from Western Reserve Road in Canfield Township to the Mahoning–Trumbull county line in Austintown Township. Mill Creek MetroParks operates it; MetroParks Police and bikeway volunteers patrol it, and it is open daily from 5 a.m. to 10 p.m. It is part of the Great Ohio Lake-to-River Greenway, a 100-mile trail on former railroad lines and adjacent corridors, partly built, that is to link Lake Erie at Ashtabula Harbor with the Ohio River near East Liverpool through Ashtabula, Trumbull, Mahoning and Columbiana counties.

The corridor was built in the 1860s as the Niles and Lisbon Branch of the Erie Railroad, a link between Cleveland and Pittsburgh that carried passengers and freight including coal, steel, iron ore and produce, and brought visitors to the Canfield Fair. Passenger service ended by the late 1930s, and after later bankruptcies the line closed; its tracks and ties were removed in 1989. Mill Creek MetroParks' 1990 General Plan recommended turning the line into a trail, and the park district, working with the Eastgate Regional Council of Governments, used Federal Highway Administration and Ohio Department of Transportation funds to acquire and build it. The bikeway opened in 2000.

The grade is gentle: the lowest point is at County Line Road and the highest at Lisbon Street in Canfield, 180 feet higher. Parking is at the MetroParks Farm in Canfield Township, a 402-acre working farm whose trailhead has water fountains and restrooms, and at the Kirk Road and Mahoning Avenue trailheads in Austintown Township. The depot-themed Kirk Road Trailhead has a 50-car lot, restrooms, water fountains and a picnic pavilion. An overpass built in 2005 carries the trail over Mahoning Avenue and was designed to resemble a railroad trestle. The trail also passes the 154-acre Sawmill Creek Preserve. North of the county line the mapped route continues as the Niles Greenway in Trumbull County.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Warren 3 S, 13.2 km from the trail's middle, 35 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353847607179838275635039
Low °F171725354554585750403123
Precipitation, in3.12.33.13.83.84.14.63.53.73.32.62.9
Snow, in9.66.44.40.20000000.86.5
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Warren sheet (1:62,500); the 1952 Canfield sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2178658, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. MetroParks Bikeway — Mill Creek MetroParks · organization · checked Oct 14, 2026
    Supports: 11 miles, paved, Western Reserve Road in Canfield Township to the Mahoning/Trumbull county line in Austintown Township; patrol by MetroParks Police and volunteers; hours 5 am–10 pm; Great Ohio Lake-to-River Greenway, 100 miles from Ashtabula Harbor to near East Liverpool through four counties; Niles and Lisbon Branch of the Erie Railroad built in the 1860s, Cleveland–Pittsburgh link, freight and Canfield Fair traffic, passenger service ended late 1930s, bankruptcies, tracks and ties removed 1989; 1990 General Plan, Eastgate, FHWA and ODOT funding, opened 2000; grade, lowest at County Line Rd, highest at Lisbon St., 180 feet; parking at MetroParks Farm, Kirk Road and Mahoning Avenue trailheads; Kirk Road depot-themed trailhead with 50-car lot, restrooms, fountains, pavilion; 2005 Mahoning Ave. overpass resembling a trestle; 154-acre Sawmill Creek Preserve; 402-acre MetroParks Farm trailhead facilities
  3. MetroParks Bikeway (relation 2178658) — OpenStreetMap · web · checked Oct 14, 2026
    Supports: northern ways of the mapped route named Niles Greenway

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.