States › North Carolina

Middle Fork Greenway

Greenway in North Carolina · OpenStreetMap relation

Runs through Blowing Rock · Watauga County

Conditions now

Loading the weather near Blowing Rock…

Forecast by the National Weather Service for Blowing Rock · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Payne Branch Road mile 0 directions to trailhead 1
  2. Parking at Niley Cook Road mile 0.5 directions to trailhead 2
  3. Parking at Flame Azalea Drive mile 0.8 directions to trailhead 3
  4. Parking at Tweetsie Railroad Lane mile 1.4 directions to trailhead 4
  5. Parking at Tweetsie Railroad Lane mile 1.5 directions to trailhead 5
  6. Parking at Tweetsie Railroad Lane mile 1.5 directions to trailhead 6
  7. Parking at Mystery Hill Lane mile 2 directions to trailhead 7
  8. Parking at Shoppes on the Parkway Road mile 4.3 directions to trailhead 8
Watauga County, along the trail (opens in a new tab)
Watauga County, along the trail · Photo: G Keith Hall · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Middle Fork Greenway is a pedestrian and cycling greenway under construction along the Middle Fork of the New River and the US 321 corridor between Boone and Blowing Rock, North Carolina. It is a Blue Ridge Conservancy project, led with High Country Pathways in partnership with the Town of Blowing Rock, the Town of Boone and Watauga County. When finished it is planned to run 6.5 miles and connect with the Boone Greenway, the Blue Ridge Parkway, the Mountains-to-Sea Trail, Tweetsie Railroad and Mystery Hill. It is being built segment by segment as land, engineering and funding come together, mostly as 10-foot asphalt with some natural-surface stretches at first.

The 321 Trailhead, with 27 parking spaces, bike racks and two bridges, was about to open in December 2021; from there the trail runs north to a small access on Niley Cook Road. A bridge at Tweetsie Railroad was installed in July 2024, and in August 2025 a ribbon-cutting opened the underpass at Tweetsie, linking two continuous miles of trail. Our map record covers about 2.2 miles in OpenStreetMap, mostly this central section from the Tweetsie area north to Niley Cook Road, with gravel stretches, tunnels and bridges, plus a separate short piece near Blowing Rock.

In November 2025 the conservancy reported that a 1.2-mile Blowing Rock segment, starting at the Welcome to Blowing Rock sign trailhead, was taking shape on easements donated to the town, funded by a federal lands access grant and state money. Construction of Angler Park, with trail, bridges and trailhead parking, was scheduled to begin in spring 2026. Walking, jogging, cycling, rollerblading and skateboarding are allowed; motor vehicles other than wheelchairs are not.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

40% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boone 1 SE, 5.3 km from the trail's middle, 67 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414552626976797872635345
Low °F222429374654585650393025
Precipitation, in4.43.64.85.55.55.65.15.65.74.74.44.2
Snow, in6.66.74.81000000.315.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Cranberry sheet (1:125,000); the 1959 Boone sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 20021607, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Middle Fork Greenway — Blue Ridge Conservancy · organization · checked Oct 16, 2026
    Supports: Blue Ridge Conservancy project with the towns of Blowing Rock and Boone and Watauga County; 6.5 miles planned; connections to the Boone Greenway, Blue Ridge Parkway, Mountains-to-Sea Trail, Tweetsie and Mystery Hill; built segment by segment; 10-foot asphalt with some natural surface; allowed activities; no motorized vehicles other than wheelchairs
  3. Middle Fork Greenway (MFG page) — Blue Ridge Conservancy · organization · checked Oct 16, 2026
    Supports: pedestrian and cycling greenway along the Middle Fork River and US 321 corridor; led by Blue Ridge Conservancy and High Country Pathways
  4. The Trail of Two Bridges - Progress on the Middle Fork Greenway — Blue Ridge Conservancy (December 7, 2021) · organization · checked Oct 16, 2026
    Supports: 321 Trailhead opening soon; 27 parking spaces, bike racks, two bridges; trail north to a parking access on Niley Cook Road
  5. Middle Fork Greenway Hosts a Ribbon-Cutting for the Tweetsie Railroad Bridge and Tunnel Murals — Blue Ridge Conservancy (August 26, 2025) · organization · checked Oct 16, 2026
    Supports: bridge installed late July 2024; underpass at Tweetsie opened, connecting two continuous miles; Angler Park with trail, bridges and trailhead parking, phase one construction scheduled for spring 2026
  6. Blowing Rock Segment of Middle Fork Greenway Beginning to Take Shape — Blue Ridge Conservancy (November 19, 2025) · organization · checked Oct 16, 2026
    Supports: 1.2-mile Blowing Rock segment from the Welcome to Blowing Rock sign trailhead; easements donated to the Town of Blowing Rock; Eastern Federal Lands Access Program grant and state funding
  7. Middle Fork Greenway — OpenStreetMap relation 20021607 · web · checked Oct 16, 2026
    Supports: mapped length about 2.2 miles; central section from the Tweetsie area north to Niley Cook Road; gravel stretches, tunnels and bridges; separate short piece near Blowing Rock

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.