Midland Bike Path
Greenway in Colorado · OpenStreetMap relation
Runs through Glenwood Springs · Garfield County
Conditions now
Loading the weather near Glenwood Springs…
Forecast by the National Weather Service for Glenwood Springs · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Wulfsohn Road mile 0 directions to trailhead 1
- Parking at East Meadows mile 0.2 directions to trailhead 2
- Parking at Midland Avenue mile 0.5 directions to trailhead 3
- Parking at West Meadows mile 0.5 directions to trailhead 4
- Glenwood Park and Ride mile 1 directions to Glenwood Park and Ride
- Parking at Devereux Road mile 1 directions to trailhead 6
- Parking at Wulfsohn Road mile 1.1 directions to trailhead 7
Plan your visit
- By trainAmtrak: Glenwood Springs, CO (GSC) 0.9 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Midland Avenue Bike Path is a paved shared-use path along Midland Avenue in Glenwood Springs, Colorado, in the West Glenwood area. This record, named for OpenStreetMap's local bicycle route, covers about 1.7 miles; TrailLink describes the Midland Avenue Trail as 2.6 miles of asphalt between the Rio Grande Trail and Linden Street.
The City of Glenwood Springs opened the West Midland Trail and its pedestrian bridge on June 15, 2017. The bridge crosses Midland Avenue between Wulfsohn and Devereux roads near I-70 exit 114, and the three-quarter-mile trail segment, part of it built by the Roaring Fork Transportation Authority, was meant to give walkers and cyclists a route from Glenwood Springs Middle School to downtown during the 2017 Grand Avenue Bridge detour. A $375,000 Garfield County Federal Mineral Lease District grant paid for part of it.
From its east end near Wulfsohn Road, where it meets the path toward Glenwood Canyon, the route runs northwest past Glenwood Meadows, passes through an underpass and crosses the Union Pacific line on a bridge before ending near Linden Street and Sister Lucy Downey Park. OpenStreetMap shows concrete and asphalt surfaces.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Glenwood Spgs #2, 5.3 km from the trail's middle, 39 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 42 53 60 71 82 89 86 78 65 49 36 Low °F 12 19 26 32 40 46 53 52 44 33 24 15 Precipitation, in 1.1 1.2 1.2 1.6 1.7 1 1.1 1.3 1.6 1.6 1.1 1.2 Snow, in 13.7 6.3 2.4 0.6 0 0 0 0 0 0.7 4.4 10.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1927 Glenwood Springs sheet (1:125,000); the 1961 Glenwood Springs sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Rio Grande Trail 0.3 mi away · 43.3 mi, paved
- Glenwood Canyon Trail 1.0 mi away · 14.2 mi, paved
- Atkinson Canal Trail 2.0 mi away · 1.4 mi, paved
- Midland Trail 2.9 mi away · 5.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18133307, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Grand Opening of the West Midland Trail and Pedestrian Bridge (press release, June 15, 2017) — City of Glenwood Springs · government source · checked Oct 17, 2026 Supports: opening June 15, 2017; bridge over Midland Avenue between Wulfsohn and Devereux near I-70 exit 114; three-quarter-mile segment, part built by RFTA; route from middle school to downtown for Grand Avenue Bridge detour; $375,000 Garfield County FML District grant
- Midland Avenue Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 17, 2026 Supports: 2.6 miles, asphalt, endpoints Rio Grande Trail and Linden Street, Garfield County
- Relation: Midland Bike Path (local bicycle route) — OpenStreetMap · web · checked Oct 17, 2026 Supports: route relation; ways named Midland Avenue Bike Path; concrete and asphalt surfaces
- Way: Midland Avenue Bike Path (bridge) — OpenStreetMap · web · checked Oct 17, 2026 Supports: bridge near the Union Pacific Glenwood Springs Subdivision
- Way: cycleway underpass — OpenStreetMap · web · checked Oct 17, 2026 Supports: underpass at the east end near Wulfsohn Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.