States › California

Mill Valley - Sausalito Path

Rail-trail in California

Runs through Mill Valley, Tamalpais-Homestead Valley and Sausalito · Marin County

Conditions now

Loading the weather near Tamalpais-Homestead Valley…

Forecast by the National Weather Service for Tamalpais-Homestead Valley · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Northwestern Pacific Railroad is a 271-mile (436 km) mainline railroad from the former ferry connections in Sausalito, California north to Eureka, with a connection to the national railroad system at Schellville. The railroad has gone through a complex history of different ownership and operators but has maintained a generic name of reference as the Northwestern Pacific Railroad, despite no longer being officially named that.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
3.6 mi 5.8 km1
Opened
19073
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bridgeway mile 0.4 directions to trailhead 1
  2. Parking at Gate 6 1/2 Road mile 0.5 · water directions to trailhead 2
  3. Parking at Gate 6 1/2 Road mile 0.6 directions to trailhead 3
  4. Parking at Gate 6 1/2 Road mile 0.7 directions to trailhead 4
  5. Parking at Bolinas Street mile 1.1 directions to trailhead 5
  6. Parking at Bolinas Street mile 1.1 directions to trailhead 6
  7. Manzanita Park And Ride mile 1.3 · water directions to Manzanita Park And Ride
  8. Muir Woods Shuttle mile 1.3 · water directions to Muir Woods Shuttle
  9. Parking at Shoreline Highway mile 1.3 · water directions to trailhead 9
  10. Parking at Sycamore Avenue mile 2.6 · restrooms · water directions to trailhead 10
  11. Parking at Sycamore Avenue mile 2.6 · restrooms · water directions to trailhead 11
  12. Parking at East Blithedale Avenue mile 2.8 directions to trailhead 12
  13. Parking at East Blithedale Avenue mile 2.8 directions to trailhead 13
  14. Parking at Camino Alto mile 2.9 directions to trailhead 14
  15. Parking at East Blithedale Avenue mile 2.9 directions to trailhead 15
Bayfront Park (opens in a new tab)
Bayfront Park · Photo: Joe Passe · CC BY-SA · Flickr

About this trail

The Mill Valley-Sausalito Path, also called the Mill Valley-Sausalito Multiuse Pathway, is a paved rail-trail along Richardson Bay in southern Marin County, California. Marin County Parks manages it, and it is part of the San Francisco Bay Trail. It follows the Northwestern Pacific Railroad's electrified line between Sausalito and Mill Valley, where revenue service began on August 21, 1903; the railroad's interurban service ended on February 28, 1941, and much of the line between Waldo and Escalle became the path in the 1970s. Through Bothin Marsh the trail runs on the old rail alignment: a wooden trestle carried track there from the 1880s, an earthen embankment replaced it in 1924, and the line was decommissioned by 1970.

Rails to Trails Conservancy gives the path as 3.7 miles, from Mill Valley about 0.2 mile north of Vasco Court and Underhill Road south to Harbor Drive and Bridgeway in Sausalito; this record maps about 3.6 miles in several pieces. At the south end of Bothin Marsh it meets the Charles F. McGlashan Pathway, which crosses Highway 1 toward trails in the Marin Headlands. The San Francisco Bay Conservation and Development Commission describes the path as a key link in Marin County's main north-south bicycle route and a designated Safe Route to School in Mill Valley; 2019 counts averaged 763 cyclists and 263 pedestrians a day.

The surface is asphalt, typically 10 feet wide through the marsh, with a gravel shoulder used by horses and several wooden bridges. The trail floods more than 30 days a year at high tides, and it was fully submerged during floods in January 2026. Under the Evolving Shorelines Project, Marin County Parks chose a "Ring the Marsh" alignment that would move the trail between the Miller Avenue trailhead and Coyote Creek off the old rail berm onto higher ground to the west; the commission's Design Review Board reviewed it in February 2026.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kentfield, 8.3 km from the trail's middle, 42 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F576165697480828382766456
Low °F424344465052535453504542
Precipitation, in8.88.762.61.40.400.10.124.69.8
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Tamalpais sheet (1:62,500); the 1954 San Rafael sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Northwestern Pacific Railroad”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q3344252, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Evolving Shorelines Project at Bothin Marsh Open Space Preserve, Design Review Board Staff Report (February 25, 2026) — San Francisco Bay Conservation and Development Commission · government source · checked Oct 16, 2026
    Supports: Mill Valley-Sausalito Multiuse Pathway managed by Marin County Parks and part of the Bay Trail; 1880s wooden trestle, 1924 embankment, line decommissioned by 1970; connection to the Charles F. McGlashan Pathway across Highway 1 toward Marin Headlands trails; key north-south bicycle route and Safe Route to School; 10-foot asphalt width; floods more than 30 days a year; Ring the Marsh alignment from the Miller Ave. trailhead to Coyote Creek off the historic rail berm; February 2026 Design Review Board review
  5. Northwestern Pacific Railroad interurban lines — Wikipedia · organization · checked Oct 16, 2026
    Supports: revenue service between Sausalito and Mill Valley began August 21, 1903; electrified line; interurban service ended February 28, 1941; line between Waldo and Escalle converted to the Mill Valley–Sausalito Path in the 1970s
  6. California's Mill Valley/Sausalito Multiuse Pathway (June 2023 Trail of the Month) — Rails to Trails Conservancy · organization · checked Oct 16, 2026
    Supports: 3.7-mile length and endpoints (0.2 mile north of Vasco Court and Underhill Road; Harbor Drive and Bridgeway), asphalt with a gravel shoulder for horses, wooden bridges, 2019 counts of 763 cyclists and 263 pedestrians a day
  7. Sea levels are rising. This marsh could save Marin from drowning — The San Francisco Standard (September 9, 2026) · web · checked Oct 16, 2026
    Supports: path across Bothin Marsh completely submerged during the January floods; planned reroute of the multiuse path

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.