States › Minnesota

Minnesota Valley State Trail

Greenway in Minnesota · OpenStreetMap relation

Runs through Jackson Township, Shakopee and Bloomington · Scott and Hennepin counties

Conditions now

Loading the weather near Shakopee…

Forecast by the National Weather Service for Shakopee · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Minnesota Valley State Trail is a 27-mile (43 km), multi-use trail in the Minneapolis-Saint Paul metropolitan area that runs parallel to the Minnesota River from the cities of Belle Plaine to Shakopee. A 10-mile (16 km) segment of the trail from Chaska to Shakopee is paved. Allowable trail uses include hiking, biking, horseback riding, cross-country skiing, and snowmobiling. First established in 1969, and never fully completed, the trail is undergoing a 13.5 mile (22 km) extension in 2019 and 2020.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
14.1 mi 22.6 km1
On former railbed
4.8 mi 34%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East 1st Street mile 0 directions to trailhead 1
  2. Parking at Trail Access mile 0.6 directions to trailhead 2
  3. Parking at 1st Avenue East mile 4.1 directions to trailhead 3
  4. Parking at 1st Avenue East mile 4.2 directions to trailhead 4
  5. Parking at Levee Drive mile 4.3 directions to trailhead 5
  6. Parking at 1st Avenue East mile 4.3 directions to trailhead 6
  7. Parking at Fillmore North Street mile 4.5 · restrooms · water directions to trailhead 7
  8. Parking at Fillmore North Street mile 4.5 · restrooms · water directions to trailhead 8
  9. Parking at Bluff Avenue East mile 4.8 directions to trailhead 9
  10. Parking at County Road 101 mile 5.4 directions to trailhead 10
  11. Parking at Viking Steel Road mile 5.5 directions to trailhead 11
  12. Parking at Viking Steel Road mile 5.6 directions to trailhead 12
  13. Parking at County Road 101 mile 5.9 directions to trailhead 13
  14. Parking at County Road 101 mile 5.9 · restrooms directions to trailhead 14
  15. Parking at Shenandoah Drive mile 6.1 directions to trailhead 15
  16. Parking at Shenandoah Drive mile 6.1 directions to trailhead 16
  17. Parking at County Road 101 mile 6.9 · restrooms directions to trailhead 17
  18. Parking at County Road 101 mile 8.7 directions to trailhead 18
sshhh (opens in a new tab)
sshhh · Photo: nullrend · CC BY-SA · Flickr

About this trail

The Minnesota Valley State Trail is a Minnesota Department of Natural Resources state trail along the Minnesota River in the southwestern Twin Cities metro area, built in two separate segments that both pass through the Minnesota Valley State Recreation Area. The longer segment runs from Belle Plaine to Shakopee: 19.5 miles of unpaved trail from Belle Plaine to the Gifford Lake Unit near Chaska, then 9.8 paved miles from Chaska to Fisher Lake in Shakopee. The second segment begins at Minnesota Bottoms Landing near Interstate 35W in Bloomington and runs east along the river toward Blackdog Lake. The line mapped here covers the paved Chaska–Shakopee section and the Bloomington segment.

The Minnesota Legislature established the trail in 1969, planning a route along the valley from Le Sueur to Fort Snelling State Park. By 2019 only the stretch from Belle Plaine to Shakopee had been developed. That year the DNR began building a segment through Bloomington, part of a planned extension from the Bloomington Ferry Bridge to the Minnesota Valley National Wildlife Refuge visitor center, where it would connect with the Big Rivers Regional Trail; plans to pave parts of it drew objections from mountain bikers.

Permitted uses include hiking, biking, mountain biking, in-line skating, horseback riding and snowmobiling. The DNR does not recommend road bikes on the natural-surface portion, where floods leave silt and several stretches are often wet. Horse riders need a horse pass and snowmobiles need registration or a trail sticker; no other pass is required. As of May 2026 the DNR reported the unpaved trail open from Highway 25 in Belle Plaine to Highway 9 near Jordan, with erosion narrowing it south of Highway 9, and closed from Highway 9 to 145th Street after a section fell into the river. Parking for the paved section includes Gifford Lake near Chaska and Huber Park in Shakopee.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

49% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Mpls Flying Cloud Airport, 4.3 km from the trail's middle, 53 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F242942577079848174594229
Low °F81224374959646253402714
Precipitation, in0.70.61.52.73.94.74.34.732.31.40.9
Wildlife refuges

Passes through Minnesota Valley National Wildlife Refuge.

On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1896 Minneapolis sheet (1:62,500); the 1954 Eden Prairie sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in June 2025 reported an unsigned closure between Shakopee and Chaska where the trail gave way to dirt; one later found it paved and rideable though still shown closed. r/CyclingMSP, Jun 2025
  • Riders in 2024 and 2025 called the river-bottoms singletrack near Bloomington Ferry muddy or sandy in places; one rode 38 mm gravel tires in fall but advised mountain bike tires right after floods. r/CyclingMSP, Sep 2024 · r/CyclingMSP, Feb 2025
  • Riders in 2024 and 2025 named Henry Sibley House in Mendota Heights, the lot under Highway 77, and the Old Cedar Avenue Bridge trailhead as places to join the river-bottoms trail. r/CyclingMSP, Sep 2024 · r/CyclingMSP, Feb 2025 · r/Minneapolis, Oct 2025
  • Riders in August 2025 pointed to camping along the unpaved trail south of Chaska, including free first-come sites at Louisville Swamp by Carver Rapids; one said high water limited access. r/CyclingMSP, Aug 2025
7 Reddit threads about this trail, Jul 2024 to Oct 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9759653, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Minnesota Valley State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q85846654, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Minnesota Valley State Trail — Minnesota DNR · government source · checked Oct 14, 2026
    Supports: two segments through the Minnesota Valley State Recreation Area; 19.5 unpaved miles Belle Plaine to the Gifford Lake Unit near Chaska; 9.8 paved miles Chaska to Fisher Lake in Shakopee; Bloomington segment from Minnesota Bottoms Landing near 35W east to Blackdog Lake; trail uses; road bikes not recommended on natural surface because of flood silt; wet sections; horse pass and snowmobile registration; May 11, 2026 alert: open Highway 25 to Highway 9 with erosion south of Highway 9, closed Highway 9 to 145th Street where the trail fell into the river; parking at Gifford Lake, Huber Park and Memorial Park
  5. Minnesota Valley State Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: established by the Minnesota Legislature in 1969 from Le Sueur to Fort Snelling State Park; by 2019 only Belle Plaine to Shakopee developed; DNR began building the Bloomington segment in 2019 as an extension from the Bloomington Ferry Bridge to the Minnesota Valley National Wildlife Refuge visitor center, connecting to the Big Rivers Regional Trail; paving controversy among mountain bikers

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.