Minnetonka Blvd Trail
Greenway in Minnesota · OpenStreetMap relation
Runs through Minnetonka, Hopkins and St. Louis Park · Hennepin County
Conditions now
Loading the weather near Hopkins…
Forecast by the National Weather Service for Hopkins · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Minnetonka Boulevard mile 0.2 directions to trailhead 1
- Big Willow Park South Lot mile 0.6 directions to Big Willow Park South Lot
- Parking at Minnetonka Boulevard mile 1 directions to trailhead 3
- Parking at Minnetonka Boulevard mile 1 · restrooms · water directions to trailhead 4
- Parking at Minnetonka Boulevard mile 1 · restrooms · water directions to trailhead 5
- Parking at Minnetonka Boulevard mile 1 · restrooms · water directions to trailhead 6
- Parking at Minnetonka Boulevard mile 1 · restrooms · water directions to trailhead 7
- Parking at Independence Avenue South mile 2.4 directions to trailhead 8
- Parking at Independence Avenue South mile 2.5 directions to trailhead 9
- Parking at Minnetonka Boulevard mile 3.1 directions to trailhead 10
- Parking at Wyoming Avenue South mile 3.1 directions to trailhead 11
- Parking at Minnetonka Boulevard mile 3.1 directions to trailhead 12
- Parking at Xylon Avenue South mile 3.1 directions to trailhead 13
- Parking at Minnetonka Boulevard mile 3.1 directions to trailhead 14
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Minnetonka Blvd Trail is a paved path of about 2.9 miles along Minnetonka Boulevard in Minnetonka, Minnesota. OpenStreetMap maps it as a regional bicycle route under that name. It is a sidepath along the road rather than a rail-trail, and it is part of the city's trail network, which in 2020 the city put at around 90 miles of trails and sidewalks, 81 miles of them maintained year-round by its Public Works Department.
In 2020 the city's park and trail planner listed a trail along Minnetonka Boulevard to Hopkins Crossroad among the trail projects the city was working on, together with a feasibility report for a new trail on the north side of the boulevard from The Marsh to Fairchild Avenue. The mapped route has parking at the south lot of Big Willow Park.
Elsewhere on the boulevard the city has been filling gaps on the north side of the road. It completed a section from Woodlawn to Tonkawood Road in 2023 and proposed an 8-foot-wide paved multi-use trail from Tonkawood Road to The Marsh, with private utilities expected to begin burying power and communication lines in 2025 and trail construction tentatively set for 2026. The city's project updates for that section report retaining walls complete, curb and gutter work and trail grading under way.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
New Hope, 7.8 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 29 42 57 69 78 82 80 72 57 41 28 Low °F 7 11 23 35 48 58 63 61 52 39 26 14 Precipitation, in 0.9 1 1.9 3.3 4.5 4.6 4.5 4.2 3.5 3 1.9 1.4 Snow, in 10.1 10.1 9 5.1 0 0 0 0 0 0.8 6.9 12.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1896 Minneapolis sheet (1:62,500); the 1954 Hopkins sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Plymouth Rd Trail within 0.2 mi · 1.8 mi, paved
- Minnetonka Loop Trail within 0.2 mi · 2.9 mi, paved
- Lake Minnetonka LRT Regional Trail within 0.2 mi · 16.2 mi, paved
- North Cedar Lake Regional Trail within 0.2 mi · 5.8 mi, paved
- Cedar Lake LRT Regional Trail 1.3 mi away · 4.2 mi, paved
- Minnesota River Bluffs LRT Regional Trail 1.4 mi away · 17.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10625740, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Minnetonka works to improve trail system, approves Phase 1 of Excelsior Boulevard Trail — Lakeshore Weekly News (February 20, 2020) · press · checked Oct 15, 2026 Supports: around 90 miles of city trails and sidewalks, 81 maintained year-round by Public Works; trail along Minnetonka Boulevard to Hopkins Crossroad among projects; feasibility report for a north-side trail from The Marsh to Fairchild Avenue
- Minnetonka Boulevard Trail — Minnetonka Matters (City of Minnetonka) · web · checked Oct 15, 2026 Supports: Woodlawn to Tonkawood Road section completed 2023; proposed 8-foot paved multi-use trail on the north side from Tonkawood Road to The Marsh; utility burial 2025; construction tentatively 2026; project updates on walls, curb and gutter and trail grading
- Minnetonka Blvd Trail, relation 10625740 — OpenStreetMap · web · checked Oct 15, 2026 Supports: name, regional bicycle route, paved surface, length, parking at Big Willow Park South Lot
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.