States › Georgia

MLK Jr. Trail

Greenway in Georgia

Runs through Columbus · Muscogee County

Conditions now

Loading the weather near Columbus…

Forecast by the National Weather Service for Columbus · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.4 mi 5.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 3rd Avenue mile 0.4 directions to trailhead 1
Columbus, along the trail (opens in a new tab)
Columbus, along the trail · Photo: vwcampin · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The MLK Jr. Trail is a concrete multi-use trail beside Martin Luther King Jr. Boulevard in Columbus, Georgia, part of the city's Dragonfly Trails network, which also includes the Chattahoochee Riverwalk and the Fall Line Trace rail-trail. The PATH Foundation, which helped the city connect nearby neighborhoods to the Riverwalk and the Fall Line Trace, lists the trail alongside MLK Boulevard as a 1.9-mile segment of the Columbus Dragonfly Trail system, with access at the MLK Jr. Trailhead. In January 2017 the Columbus Council heard the proposal to name the network the Dragonfly Trails, with design and engineering of an MLK phase to follow, and discussed a project to restripe the boulevard and add a multi-use trail on its north side near Annette Avenue.

TrailLink describes the trail as paralleling the boulevard for more than a mile and a half through a mix of suburban and industrial land, connecting adjacent neighborhoods to Theo McGee Park and the YMCA, with ends at 10th Avenue and Roosevelt Avenue and at MLK Boulevard, and a trailhead at 2951 Martin Luther King Boulevard. This record maps about 3.4 miles of path under the name in OpenStreetMap, from near downtown Columbus east to Martin Luther King Jr. Boulevard near Havenbrook Court, longer than the 1.9 miles the PATH Foundation lists.

The trail is concrete and two lanes wide, open to bicycles and walkers, and OpenStreetMap tags it as a designated bike and foot path with leashed dogs allowed. The trailhead on Bay Avenue has parking and restrooms.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Columbus Metro Airport, 6.8 km from the trail's middle, 42 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F596370788590939287786861
Low °F384247546370747368574641
Precipitation, in4.24.54.943.244.34.73.32.844.8
Snow, in000.2000000000.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Columbus sheet (1:62,500); the 1955 Columbus sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Minutes, Council of Columbus, Georgia, regular meeting January 10, 2017 — Columbus Consolidated Government e-CAP · government source · checked Oct 16, 2026
    Supports: proposal to name the trail system the Dragonfly Trails, next step design and engineering for the MLK phase, MLK Jr. Boulevard project with a multi-use trail on the north side near Annette Avenue
  3. Columbus Dragonfly Trail — PATH Foundation · organization · checked Oct 16, 2026
    Supports: PATH helped the city connect neighborhoods to the Riverwalk, Fall Line Trace and the trail alongside MLK Boulevard, 1.9-mile segment C, MLK Jr. Trailhead access
  4. MLK Trail | Georgia Trails | TrailLink · web · checked Oct 16, 2026
    Supports: parallels the boulevard for more than a mile and a half, suburban and industrial character, two-lane trail, Theo McGee Park and YMCA, Dragonfly Trails network with the Chattahoochee Riverwalk and Fall Line Trace, endpoints, concrete surface, trailhead at 2951 Martin Luther King Boulevard
  5. OpenStreetMap ways named MLK Jr. Trail (e.g. way 1250630240) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: mapped length of about 3.4 miles, east end near Havenbrook Court, concrete surface, designated bicycle and foot use, leashed dogs, Bay Avenue trailhead with parking and restrooms

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.