States › West Virginia

Mon River Trail South

Rail-trail in West Virginia · OpenStreetMap relation

In Marion and Monongalia counties

Conditions now

Loading the weather near Booth…

Forecast by the National Weather Service for Booth · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
17.8 mi 28.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0.1 directions to trailhead 1
Mon River Trail South (opens in a new tab)
Photo: roadgeek_md99 · CC BY-SA 4.0 · Mapillary

About this trail

The Mon River Trail South is a 17.7-mile crushed limestone rail-trail along the Monongahela River in north-central West Virginia, running from the southern edge of Morgantown to Prickett's Fort State Park just outside Fairmont. With the paved Caperton Trail and the Mon River Trail North it makes up the Mon River Rail-Trail, a National Recreation Trail managed by the Mon River Trails Conservancy. The trail follows the former Fairmont, Morgantown and Pittsburgh Branch of the Baltimore and Ohio Railroad, which mainly carried coal, coke, sand and limestone between mines around Fairmont and Pittsburgh.

Outside Morgantown the trail winds through a wooded river valley with river views, occasional waterfalls and spring and autumn wildflowers. Parking is available at the Uffington boat dock off County Route 73, where Interstate 79 crosses the river, and at Prickett's Fort State Park. At the park the Marion County Trail (MCTrail) continues to Fairmont. At the northern end the Caperton Trail runs about six paved miles through Morgantown and Star City to the Mon River Trail North, and the Deckers Creek Trail climbs 19 miles southeast from Morgantown to Reedsville.

A long-term goal is to close about 20 miles of gaps between the Mon River trails and the North Bend Rail Trail, which runs 72 miles west to Parkersburg, forming a 150-mile trail. The Mon River system is part of the planned Industrial Heartland Trails Coalition corridor between Parkersburg and Pittsburgh.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

73% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Morgantown L&D, 7.7 km from the trail's middle, 9 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394351647280838277655343
Low °F212228384958626155433226
Precipitation, in3.53.144.14.24.54.73.63.32.933.5
Old maps

USGS topographic maps of the trail's middle go back to the 1904 Blacksville sheet (1:62,500); the 1960 Rivesville sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5598515, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. West Virginia's Mon River Trails — Rails-to-Trails Conservancy TrailBlog (2015-02-11) · organization · checked Oct 14, 2026
    Supports: 17.7 miles, crushed limestone, southern edge of Morgantown to Prickett's Fort State Park outside Fairmont, Caperton Trail about six miles, Fairmont, Morgantown and Pittsburgh Branch of the B&O and its freight, Uffington boat dock parking where I-79 crosses, goal of closing about 20 miles of gaps to the 72-mile North Bend Rail Trail for a 150-mile trail
  3. Mon River Rail-Trail — West Virginia Rails To Trails · organization · checked Oct 14, 2026
    Supports: packed stone surface, route to Prickett's Fort State Park,wooded river valley, river views, waterfalls and wildflowers, MCTrail to Fairmont, Deckers Creek Trail 19 miles southeast to Reedsville, Mon River Trails Conservancy as manager, National Recreation Trail, Industrial Heartland corridor, parking at the Uffington boat dock off County Route 73 and at Prickett's Fort State Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.