States › Colorado

Monument Corridor Trail

Greenway in Colorado

Runs through Redlands and Grand Junction · Mesa County

Conditions now

Loading the weather near Grand Junction…

Forecast by the National Weather Service for Grand Junction · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.2 mi 5.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Tabaguache Trailhead mile 1.7 · restrooms directions to Tabaguache Trailhead
  2. Tabeguache / Lunch Loops Trailhead mile 1.7 · restrooms directions to Tabeguache / Lunch Loops Trailhead

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Monument Corridor Trail (opens in a new tab)
Photo: vorpalblade · CC BY-SA 4.0 · Mapillary

About this trail

The Monument Corridor Trail is a paved path along Monument Road in Grand Junction, Colorado, linking the Redlands side of the city with the Lunch Loops trailhead. The path is the paved connector only; the Lunch Loops mountain-bike singletrack it leads to is a separate trail system.

Spoke and Blossom reported in 2019 that the City of Grand Junction, Colorado West Land Trust, the Bureau of Land Management and Mesa County had planned the connector since 2017 as a 1.5-mile off-street path along Monument Road from Highway 340 to the Lunch Loop and Three Sisters trailhead, linking it toward the Colorado Riverfront Trail and Las Colonias Park. More than $2.6 million had been raised, with construction planned to start in May 2019. In October 2024 the city and the land trust broke ground on a second phase, funded by a $500,000 Great Outdoors Colorado grant and scheduled for completion by spring 2025, to complete a 10-mile paved Redlands loop with the South Camp, Connected Lakes and Audubon trails.

The trail record on this site covers about 3.2 miles, from near Highway 340 past the Tabeguache and Lunch Loops trailhead, which has parking and restrooms, and on west. OpenStreetMap maps the path as concrete and designated for bicycles and walkers.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Grand Junction 6ese, 12 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394658657688939081675240
Low °F192534405059656354413020
Precipitation, in0.50.50.810.90.50.70.81.20.90.70.5
Snow, in3.42.11.10.6000000.21.73.5
Old maps

USGS topographic maps of the trail's middle go back to the 1956 Grand Junction sheet (1:250,000); the 1962 Grand Junction sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Grand Junction begins second phase on Monument Trail Connection — KKCO 11 News (Oct 2024) · press · checked Oct 17, 2026
    Supports: second phase groundbreaking, city and Colorado West Land Trust, $500,000 GOCO grant, spring 2025 target, 10-mile paved loop with South Camp, Connected Lakes and Audubon trails
  3. Lunch Loop Connector Trail — Spoke and Blossom (Apr 16, 2019) · web · checked Oct 17, 2026
    Supports: partners, 2017 start, 1.5-mile paved off-street path from Highway 340 to the Lunch Loop/Three Sisters trailhead, links to Riverfront Trail and Las Colonias, $2.6 million raised, May 2019 groundbreaking plan
  4. OpenStreetMap ways named Monument Corridor Trail · web · checked Oct 17, 2026
    Supports: concrete surface, bicycle and foot designation, trailhead parking and restrooms, mapped extent

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.