Morgana Run Trail
Rail-trail in Ohio · OpenStreetMap relation
Runs through Cleveland · Cuyahoga County
Conditions now
Loading the weather near Cleveland…
Forecast by the National Weather Service for Cleveland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Hinde Court mile 0.6 directions to trailhead 1
- Parking at Hinde Avenue mile 0.6 directions to trailhead 2
- Parking at Broadway Avenue mile 0.8 directions to trailhead 3
- Parking at Krueger Avenue mile 1.8 directions to trailhead 4
(opens in a new tab) About this trail
The Morgana Run Trail is a rail-trail in the Slavic Village neighborhood of Cleveland, Ohio. Cleveland Metroparks describes it as 2.1 miles long, and this record maps about 2.4 miles. The Slavic Village neighborhood website describes it as running on a decommissioned freight rail corridor and says it was completed in 2007.
The trail begins on East 49th Street just north of Fleet Avenue and runs southeast through the neighborhood to end near Cleveland Metroparks' Garfield Park Reservation, close to the waterfall on Mill Creek that the neighborhood website calls the tallest in Cuyahoga County. From there a trail leads on to Garfield Reservation.
In June 2024 Cleveland Metroparks received a $19.5 million federal RAISE grant that fully funds construction of two trail projects, including the nearly 1-mile Morgana Run Extension, which is to complete the Morgana Run Trail by linking it to Mill Creek Falls and the Mill Creek Connector Trail in Garfield Park Reservation at Warner and Turney roads, with the route continuing to the Towpath Trail. Ideastream Public Media reported that $8 million of the grant is for the extension. Metroparks said construction on both projects was planned to begin in 2026; the other is the Slavic Village Downtown Connector, a 1.7-mile trail along Broadway Avenue toward downtown Cleveland.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 95% of this route as a trail on former railroad right-of-way.
- Shade
19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cleveland Burke Airport, 7.1 km from the trail's middle, 37 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 37 45 57 68 77 81 80 74 62 50 40 Low °F 24 24 31 41 53 63 68 67 60 49 38 30 Precipitation, in 1.8 1.5 2.4 3.1 3.5 2.8 3.7 3.5 2.9 3.2 2.9 2 - On the National Register
- Cleveland Worsted Mills Company, Cleveland · building, listed 1985 · nomination file for Cleveland Worsted Mills Company
- Old maps
USGS topographic maps of the trail's middle go back to the 1903 Cleveland sheet (1:62,500); the 1953 Cleveland South sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Garfield Park Reservation All Purpose Trail within 0.2 mi · 1.6 mi, paved
- Opportunity Corridor Trail 1.0 mi away · 1.4 mi, paved
- Ohio & Erie Canal Reservation All Purpose Trail 1.1 mi away · 2.7 mi, paved
- Garfield Park Reservation All Purpose Trail Loop 1.2 mi away · 2.0 mi, paved
- Ohio & Erie Canal Towpath Trail 1.4 mi away · 85.4 mi, paved
- Cleveland Foundation Centennial Trail 2.5 mi away · 0.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15521543, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Play — Slavic Village · organization · checked Oct 14, 2026 Supports: completed in 2007; former decommissioned freight train line through Slavic Village; begins on E. 49th Street just north of Fleet Ave; ends near the Garfield MetroParks Reservation at the tallest waterfall in Cuyahoga County on Mill Creek, where it meets the trail to Garfield Reservation
- Cleveland Metroparks makes investment in equity with new connections to east side trails — Ideastream Public Media (June 27, 2024) · organization · checked Oct 14, 2026 Supports: $8 million of the grant for the nearly one-mile Morgana Run Extension; 1.7-mile Slavic Village Downtown Connector North along Broadway Avenue toward downtown; construction expected to begin in early 2026
- Cleveland Metroparks Awarded $19.5 Million Federal Grant for East Side Connections — Cleveland Metroparks (June 25, 2024) · web · checked Oct 14, 2026 Supports: existing 2.1-mile Morgana Run Trail in Slavic Village; $19.5 million RAISE grant fully funds two trail projects; nearly 1-mile Morgana Run Extension completes the trail, to Mill Creek Falls and the Mill Creek Connector Trail in Garfield Park Reservation at Warner and Turney roads, continuing to the Towpath Trail; construction planned to begin in 2026
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.