Mountain Division Rail Trail
Rail-trail in Maine · OpenStreetMap relation
Runs through Fryeburg, Standish, Gorham, Windham and South Windham · Oxford and Cumberland counties
Conditions now
Loading the weather near Standish…
Forecast by the National Weather Service for Standish · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Chadbourne Road mile 0 directions to trailhead 1
- Parking at Soccer Drive mile 4.3 directions to trailhead 2
- Parking at Soccer Drive mile 4.6 directions to trailhead 3
- Parking at Oxen Pull Road directions to trailhead 4
- Parking at Fair Street directions to trailhead 5
(opens in a new tab) About this trail
The Mountain Division Trail is a paved rail trail in southwestern Maine on the former Mountain Division of the Maine Central Railroad, built as the Portland and Ogdensburg Railroad. This entry covers its two built sections, which measure 9.6 miles on the map; the Friends of the Mountain Division Trail count 10 miles in use, 4 in Fryeburg and 6 across Standish, Gorham and Windham. The line opened in the 1870s, and its Maine portion ran 61 miles from Portland to the New Hampshire line. Passenger service ended in 1958, and Guilford Transportation Industries abandoned the line in 1983. MaineDOT bought 40 miles of the corridor, from Windham to Fryeburg, in 1997.
The southern section runs about 6 miles from Johnson Field in Standish through Gorham to the Cumberland County Soil and Water Conservation District office in Windham. It opened in 2003 and was paved in 2009; almost 5 miles of it lie in Gorham, which has its own access at Shaw Park. The Fryeburg section runs 4 miles from the Maine State Visitor Information Center near the New Hampshire border to Route 113 near White Mountain Regional Airport. It was completed in 2012 and paved from the start.
Between the two sections lie 31 miles of state-owned, inactive rail line. MaineDOT formed a Rail Use Advisory Council for it in September 2021, and LD 404, signed on July 6, 2023, authorizes the department to remove the rails and ties and build a trail from Fryeburg to Standish. The first phase covers 10 miles through Fryeburg, Brownfield and Hiram; MaineDOT advertised it for bids on September 30, 2026, with significant construction expected to begin in spring 2027. Users of the built sections include walkers, runners, cyclists, in-line skaters, snowmobilers, cross-country skiers and snowshoers.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 89% of this route as an abandoned rail line.
- Shade
48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
West Buxton 2 NNW, 11.3 km from the trail's middle, 29 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 43 56 67 76 82 80 72 60 48 37 Low °F 8 10 20 31 43 52 58 56 48 36 26 16 Precipitation, in 3.5 3.4 4.2 4.7 3.8 4.3 4 3.5 3.9 5.5 4.4 4.4 - On the National Register
- Cumberland and Oxford Canal, Standish · structure, listed 1974 · nomination file for Cumberland and Oxford Canal
- Rivercroft Farm, Fryeburg · historic district, listed 2008 · nomination file for Rivercroft Farm
- Old maps
USGS topographic maps of the trail's middle go back to the 1896 Sebago sheet (1:62,500); the 1943 Sebago Lake sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Mar 2025 to May 2025
- Running Trails Southern/Western Maine r/Maine · Mar 2025 · 4 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFriends of the Mountain Division Trail
- FacebookFriends of the Mountain Division Trail (Facebook)
- RedditSearch Reddit: r/Maine
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 16889350, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Mountain Div. - Rail Use Advisory Council — Maine Department of Transportation · government source · checked Oct 13, 2026 Supports: council formed September 2021; 31 miles of state-owned, inactive rail line
- Town of Gorham testimony on LD 404 and LD 1450 — Maine Legislature, Committee on Transportation (May 18, 2023) · government source · checked Oct 13, 2026 Supports: trail inception 2003; almost 5 miles in Gorham between Standish and Windham; Shaw Park access; users include rollerbladers, walkers, runners, cyclists, snowmobilers, cross-country skiers and snowshoers
- Friends of the Mountain Division Trail · organization · checked Oct 13, 2026 Supports: 10 miles in use (4 in Fryeburg, 6 across Standish, Gorham and Windham); LD 404 signed July 6, 2023 authorizing rail and tie removal and a Fryeburg–Standish trail; first phase of 10 miles through Fryeburg, Brownfield and Hiram; MaineDOT bid advertisement September 30, 2026; construction expected spring 2027
- Mountain Division — Wikipedia · organization · checked Oct 13, 2026 Supports: built as the Portland & Ogdensburg Railroad before Maine Central acquisition; passenger service ended 1958; abandoned 1983 by Guilford Transportation Industries
- 5 things to know about the Mountain Division Trail — Portland Press Herald (July 22, 2026) · press · checked Oct 13, 2026 Supports: line opened in the 1870s; Maine portion 61 miles Portland to the state line; MaineDOT purchase of 40 miles Windham–Fryeburg in 1997; Standish–Windham section 6 miles from Johnson Field to the Cumberland County Soil and Water District, opened 2003, paved 2009; Fryeburg section 4 miles from the Maine State Visitor Information Center to Route 113 near White Mountain Regional Airport, completed 2012, paved
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.