States › Tennessee

Cleveland/Bradley County Greenway

Greenway in Tennessee

Runs through Cleveland · Bradley County

Conditions now

Loading the weather near Cleveland…

Forecast by the National Weather Service for Cleveland · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Cleveland/Bradley County Greenway is a four-mile (6.4 km)-long public greenway walking path in Cleveland, Tennessee maintained by the local Greenway Advisory Board. The path is the longest path in the Greenway Network, a network of public walking trails located in Bradley County, Tennessee.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
3.4 mi 5.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Harris Circle Northwest mile 1.7 directions to trailhead 1
  2. Parking at Keith Street mile 2 · restrooms directions to trailhead 2
Centenary Avenue Historic District, beside the trail (opens in a new tab)
Centenary Avenue Historic District, beside the trail · Photo: Andrew Jameson · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Cleveland/Bradley County Greenway, mapped here under the name Mouse Creek Greenway, is a paved linear park along Mouse Creek in Cleveland, Tennessee. It is a joint venture of Bradley County and the City of Cleveland and is overseen by the Greenway Advisory Board, whose members are appointed by the county commission, the city council, the chamber of commerce and Cleveland Utilities. The first phase opened in October 2001 after grants and land donations gathered from 1998. Later phases opened in 2005, 2008 and 2010, aided by Tennessee Department of Transportation and Tennessee Department of Environment and Conservation grants, and the fifth phase was dedicated on September 24, 2012, completing the main route. A 0.2-mile northward extension near Mohawk Drive was dedicated in November 2013.

The main trail runs about 4 miles from Willow Street north to beyond Mohawk Drive, following South Mouse Creek its whole length. Going north it passes under 17th and 20th streets, past the international offices of the Church of God, under 25th Street, and past Greenway Park between Keith Street and Raider Drive, Cleveland High School and Tinsley Park, then under Mouse Creek Road and Paul Huff Parkway. The 0.8-mile Casteel Connector, completed in July 2018, links Tinsley Park to North Ocoee Street (U.S. Route 11).

About two-thirds of the surface is concrete and the rest asphalt, and the path is lighted. The greenway association lists five pedestrian bridges over Mouse Creek, five underpasses, two playgrounds, three restrooms and an 18-space parking area at the north end of Harris Circle. A 2015 city ordinance bars juveniles from the greenway between 11 p.m. and 6 a.m. unless accompanied by an adult. The record maps about 3.4 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cleveland Fltr Plt, 7.9 km from the trail's middle, 15 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505563728086898883736153
Low °F293339475664686760483732
Precipitation, in5.24.95.654.64.95.13.84.73.54.85.5
Snow, in0.20.60000000000.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Cleveland sheet (1:125,000); the 1965 East Cleveland sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Cleveland/Bradley County Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q16258548, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Cleveland/Bradley County Greenway — Wikipedia · organization · checked Oct 15, 2026
    Supports: 4 miles from Willow Street past Mohawk Drive along South Mouse Creek; Greenway Advisory Board and its appointing bodies; route order (17th, 20th, 25th streets, Church of God offices, Greenway Park, Cleveland High School, Tinsley Park, Mouse Creek Road, Paul Huff Parkway); two-thirds concrete; phase dates 2001, 2005, 2008, 2010 (TDEC grant), 2012; grants and land donations 1998-2001; Casteel Connector 0.8 miles to U.S. 11 (North Ocoee Street), completed July 31, 2018; 2015 juvenile curfew ordinance
  5. The Cleveland, TN Greenway — Cleveland/Bradley County Greenway · web · checked Oct 15, 2026
    Supports: joint venture of Bradley County and the City of Cleveland; linear park of unbroken lighted path along Mouse Creek
  6. About — The Cleveland, TN Greenway · web · checked Oct 15, 2026
    Supports: 18-space parking at the north end of Harris Circle; five pedestrian bridges over Mouse Creek; five underpasses; two playgrounds; three restrooms; Church of God connection
  7. Chronological Highlights — The Cleveland, TN Greenway · web · checked Oct 15, 2026
    Supports: Phase Five ribbon-cutting September 24, 2012; 0.2-mile northward extension dedicated November 2013; Casteel Connector ribbon-cutting July 2018
  8. OpenStreetMap ways for Mouse Creek Greenway — OpenStreetMap contributors · web · checked Oct 15, 2026
    Supports: record name Mouse Creek Greenway; mapped length about 3.4 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.