Muskingum Recreational Trail
Rail-trail in Ohio · OpenStreetMap relation
In Muskingum County
Conditions now
Loading the weather near Dresden…
Forecast by the National Weather Service for Dresden · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Muskingum Recreational Trail is a paved trail along the Muskingum River south of Dresden in Muskingum County, Ohio, owned and operated by the Muskingum Valley Park District. The park district accepted the donation of the corridor from Muskingum Recreational Trail Incorporated in spring 1993, and construction of the first phase began in 2000. This record maps about 4.4 miles, in two pieces.
The park district describes about six miles of asphalt from Dresden River Park in the village of Dresden, in Jefferson Township, south to Rock Cut Road in Muskingum Township, with a further paved section between Rock Cut Road and Ellis Dam Road; it gives the trail's southern limit as just north of Gilbert Station Road. Paving was funded by a federal Transportation Alternatives Program grant, and most of the corridor's unpaved sections were scheduled for paving in the 2022 construction season. Near its southern end the trail crosses the Muskingum River on an old railroad bridge. Along the way it passes large rock formations along the river and two wetlands, one with an observation platform.
The trail is open from dawn to dusk every day, with no fee; pets must be leashed and off-road vehicles are not allowed. Parking is at the Jefferson Township building and Dresden River Park in Dresden, on Rock Cut Road near Zemba, and at Muskingum River State Park's Lock 11 at Ellis Dam Road, which usually has restrooms.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 90% of this route as a trail on former railroad right-of-way.
- Shade
65% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Coshocton Wpc Plt, 21 km from the trail's middle, 12 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 40 50 63 73 80 83 82 76 64 52 41 Low °F 20 22 30 39 50 58 62 61 53 42 32 25 Precipitation, in 3.1 2.5 3.7 4.2 4.3 4.7 4.2 4.2 3.2 3.1 3.1 3.2 Snow, in 5.6 3.1 2.9 0.2 0 0 0 0 0 0 0.5 3 - Old maps
USGS topographic maps of the trail's middle go back to the 1910 Frazeysburg sheet (1:62,500); the 1962 Dresden sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Zane's Landing Trail 4.4 mi away · 2.7 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9641215, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Muskingum Recreational Trail — Muskingum Valley Park District · organization · checked Oct 14, 2026 Supports: extent from Dresden River Park to just north of Gilbert Station Road, about six miles of asphalt from Dresden to Rock Cut Road, paved section Rock Cut Road to Ellis Dam Road, Transportation Alternatives Program grant, 2022 paving of unpaved sections, 1993 corridor donation from Muskingum Recreational Trail Inc., construction began 2000, rock formations, two wetlands and observation platform, hours, no fee, leashed pets, no off-road vehicles, parking and restrooms
- Muskingum Recreational Trail — TrailLink · web · checked Oct 14, 2026 Supports: old railroad bridge carrying the southern section over the Muskingum River
- Muskingum Recreational Trail — OpenStreetMap relation 9641215 · web · checked Oct 14, 2026 Supports: record extent: two pieces between Dresden and the Ellis Dam area
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.