Napa Valley Vine Trail
Greenway in California · OpenStreetMap relation
Runs through Calistoga, St. Helena, Yountville, Napa, American Canyon and Vallejo · Napa and Solano counties
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Napa Valley Vine Trail is a 47-mile walking and biking paved trail connecting Napa County, California from the Vallejo Ferry Terminal in Solano County to Calistoga. A grass-roots nonprofit called the Napa Valley Vine Trail Coalition funds and maintains the trail and fosters a sense of community through implementing artwork and educational elements along the path. The Napa Greenway Feasibility Study was commissioned by the Napa Valley Transportation Authority (NVTA) in 2007 to explore an active transportation system for the Valley. The first section of the trail opened in Yountville in 2012, and has been expanding since then.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Managed by Napa Valley Vine Trail Coalition.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Mare Island Way mile 0.1 · restrooms directions to trailhead 1
- Parking at Lozier Alley mile 0.3 directions to trailhead 2
- Parking at Mare Island Way mile 0.4 directions to trailhead 3
- Parking at Mare Island Way mile 0.5 directions to trailhead 4
- Parking at Mare Island Way mile 0.6 · restrooms directions to trailhead 5
- Parking at Harbor Way mile 0.7 directions to trailhead 6
- Parking at Harbor Way mile 0.8 directions to trailhead 7
- Lot C mile 0.9 directions to Lot C
- Parking at Mare Island Causeway mile 1 directions to trailhead 9
- Parking at Lewis Brown Road mile 3.7 directions to trailhead 10
- Parking at Sonoma Boulevard mile 3.7 directions to trailhead 11
- Parking at Sonoma Boulevard mile 3.7 directions to trailhead 12
- Parking at Sonoma Boulevard mile 3.7 directions to trailhead 13
- Parking at Lewis Brown Road mile 3.7 directions to trailhead 14
- Parking at Lewis Brown Road mile 3.7 directions to trailhead 15
- Parking at Sonoma Boulevard mile 3.7 directions to trailhead 16
- Parking at Sonoma Boulevard mile 3.7 directions to trailhead 17
- Parking at Car Wash mile 3.8 directions to trailhead 18
- Parking at Jack in the Box Drive-Thru mile 3.8 directions to trailhead 19
- Parking mile 4.2 directions to trailhead 20
- Parking mile 4.5 directions to trailhead 21
- Parking at Mini Drive mile 4.9 directions to trailhead 22
- Parking at American Canyon Road mile 5.7 directions to trailhead 23
- Parking at American Canyon Road mile 5.7 directions to trailhead 24
- Parking at American Canyon Road mile 5.7 directions to trailhead 25
- Parking at American Canyon Road mile 5.8 directions to trailhead 26
- Parking at Shenandoah Drive mile 6.2 directions to trailhead 27
- Parking at Renwood Lane mile 6.4 directions to trailhead 28
- Parking mile 6.4 directions to trailhead 29
- Parking at Donaldson Way East mile 6.9 · restrooms directions to trailhead 30
- Parking mile 9.3 directions to trailhead 31
- Parking mile 9.3 directions to trailhead 32
- Parking at Devlin Road mile 10 directions to trailhead 33
- Parking at Gateway Road East mile 11.9 directions to trailhead 34
- Parking at West Imola Avenue mile 17.1 directions to trailhead 35
- Parking at Soscol Avenue mile 18.3 directions to trailhead 36
- Parking at West Street mile 18.4 directions to trailhead 37
- Parking at Pearl Street mile 18.5 directions to trailhead 38
- Parking at McKinstry Street mile 18.6 directions to trailhead 39
- Trancas Street Park and Ride mile 20.5 directions to Trancas Street Park and Ride
- Parking at Redwood Park and Ride mile 20.5 directions to trailhead 41
- Parking at El Centro Avenue mile 21.6 directions to trailhead 42
- Parking at Salvador Avenue mile 22 directions to trailhead 43
- Parking at Solano Avenue mile 26.3 directions to trailhead 44
- Parking at Solano Avenue mile 26.5 directions to trailhead 45
- Parking at Webber Avenue mile 26.8 directions to trailhead 46
- Parking at Webber Avenue mile 26.8 directions to trailhead 47
- Parking at Washington Street mile 26.9 directions to trailhead 48
- Parking restrooms directions to trailhead 49
- Parking directions to trailhead 50
- Parking directions to trailhead 51
- Parking directions to trailhead 52
- Parking directions to trailhead 53
- Parking directions to trailhead 54
- Parking directions to trailhead 55
- Parking at Fair Way directions to trailhead 56
- Parking at Big Tree Road directions to trailhead 57
- Parking directions to trailhead 58
(opens in a new tab) About this trail
The Napa Valley Vine Trail is a planned 47-mile paved walking and cycling trail, separate from cars, from the Vallejo Ferry Terminal in Solano County to the Calistoga Depot at the head of the Napa Valley. The Napa Valley Vine Trail Coalition, a nonprofit formed in 2008, leads the project; the Napa Valley Transportation Authority commissioned the 2007 feasibility study behind it. The first section opened in Yountville in 2012, and the 12.5-mile Napa to Yountville section, which opened in 2016, runs on an easement from the Napa Valley Wine Train.
The coalition counts 33 miles complete in three sections. Vallejo to American Canyon, 7.5 miles, starts at the ferry terminal. Napa to Yountville passes Kennedy Park, downtown Napa, the Rail Arts District and Oak Knoll. St. Helena to Calistoga, 8.2 miles, passes vineyards and Bothe-Napa Valley State Park; agencies broke ground on it in May 2022 as a $12.58 million project from Pratt Avenue in St. Helena to Lincoln Avenue in Calistoga beside State Route 29, crossing the highway twice, and the Bay Area Ridge Trail, which shares 4.2 miles of it, held its ribbon cutting on August 16, 2024. Two gaps remain: the 3-mile Vista Carneros section between American Canyon and Kennedy Park in south Napa, and the 11-mile Yountville to St. Helena section, which is in engineering.
Wikipedia describes the trail as paved and level, with grades of about 2 percent. This record has no single OpenStreetMap route; it gathers about 19.8 miles of ways tagged with the trail's name between Vallejo and Calistoga, so not every completed mile appears on its map.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: January and March to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Napa State Hospital, 6 km from the trail's middle, 12 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 59 63 68 72 77 82 83 84 84 78 66 58 Low °F 40 42 44 46 50 54 56 56 53 49 44 40 Precipitation, in 5 5.1 3.7 1.7 1.1 0.3 0 0.1 0.1 1.3 2.8 5.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Napa Valley Railroad Depot, Calistoga · building, listed 1977 · nomination file for Napa Valley Railroad Depot
- Bale Mill, St. Helena · building, listed 1972 · nomination file for Bale Mill
- Mare Island Historic District(Boundary Increase), Vallejo · historic district, listed 1997 · nomination file for Mare Island Historic District(Boundary Increase)
- Beringer Brothers--Los Hermanos Winery, Saint Helena · historic district, listed 2001 · nomination file for Beringer Brothers--Los Hermanos Winery
- Saint Vincent's Hill Historic District, Vallejo · historic district, listed 2003 · nomination file for Saint Vincent's Hill Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1902 Napa sheet (1:125,000); the 1951 Napa sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- A rider on opening weekend in August 2024 reported asphalt, packed tread and brick surfaces on the St. Helena section, plus a closed quarter mile near Bale Grist Mill that forced highway riding. r/BAbike, Aug 2024
- One commenter in September 2024 said the St. Helena start had little signage, at Pratt Avenue and Highway 128. r/BAbike, Aug 2024
- Riders in April 2025 called the Vallejo-to-Napa miles unpleasant, citing freeway-side traffic, wind and a ride up to Highway 12 to cross the river; another linked the Vine Trail pieces by paths and quiet streets. r/BAbike, Apr 2025
- One rider in May 2026 reported riding 6 miles of the trail but said it was not a top pick for a beginner outing, since only two 8-mile segments existed. r/BAbike, May 2026
3 Reddit threads about this trail, Aug 2024 to May 2026
- St. Helena to Calistoga Vine Trail Mostly Open! r/BAbike · Aug 2024 · 6 comments
- Biking to Sonoma city from SF route r/BAbike · Apr 2025 · 7 comments
- Bike Routes for a beginner and an advanced? r/BAbike · May 2026 · 20 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationNapa Valley Vine Trail Coalition
- RedditSearch Reddit: r/California
Nearby trails
- San Francisco Bay Trail within 0.2 mi · 174 mi, paved
- Napa River Trail within 0.2 mi · 3.6 mi, paved
- City of Napa Rail Trail within 0.2 mi · 1.7 mi, paved
- Oat Hill Mine Trail 0.6 mi away · 8.0 mi, dirt
- Solano Bikeway 1.5 mi away · 2.1 mi, paved
- Blue Rock Springs Cycleway 2.1 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 3087449, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Napa Valley Vine Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q133896063, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Local Agencies Break Ground on the Vine Trail's St. Helena to Calistoga Segment — Napa Valley Transportation Authority (May 24, 2022) · government source · checked Oct 15, 2026 Supports: May 2022 groundbreaking, 7.4 miles from Pratt Avenue in St. Helena to Lincoln Avenue in Calistoga beside SR 29 with two highway crossings, $12.58 million, NVTA with the coalition, County of Napa and cities of St. Helena and Calistoga
- Construction — Napa Valley Vine Trail · organization · checked Oct 15, 2026 Supports: Yountville section by 2012, Napa to Yountville 12.5 miles opened 2016 on a Napa Valley Wine Train easement, Vallejo to American Canyon 7.5 miles, St. Helena to Calistoga 8.2 miles, Yountville to St. Helena 11 miles in engineering, Vista Carneros 3 miles American Canyon to Kennedy Park
- The Vine Trail — Napa Valley Vine Trail · organization · checked Oct 15, 2026 Supports: 47 miles from the Vallejo Ferry Terminal to the Calistoga Depot through Solano and Napa counties, 33 miles complete in three sections, places along each section, Vista Carneros and Yountville to St. Helena as remaining links
- Home — Napa Valley Vine Trail · organization · checked Oct 15, 2026 Supports: 47-mile multi-use trail separate from cars, coalition as grassroots nonprofit
- Calistoga Ridge and Vine Trail — Bay Area Ridge Trail · organization · checked Oct 15, 2026 Supports: ribbon cutting August 16, 2024, 4.2 miles from Bothe-Napa Valley State Park to the Calistoga Depot shared with the Vine Trail
- Napa Valley Vine Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: coalition formed September 19, 2008, NVTA 2007 feasibility study, first section in Yountville 2012, paved and level with about 2 percent grade
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.