Narrow Gauge Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Billerica and Bedford · Middlesex County
Conditions now
Loading the weather near Pinehurst…
Forecast by the National Weather Service for Pinehurst · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Lexington and West Cambridge Railroad was a railroad company chartered in 1845 and opened in 1846 that operated in eastern Massachusetts. It and its successors provided passenger service until 1977 and freight service until 1980 or early 1981.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Bedford Village mile 0.5 directions to trailhead 1
- Parking at Pine Hill Road mile 0.9 directions to trailhead 2
- Parking at Mickelson Lane mile 1 directions to trailhead 3
- 4 mile 1.4 directions to 4
- 15 mile 1.5 directions to 15
- Parking at Avenue L mile 1.5 directions to trailhead 6
- VA & MCC shuttle parking mile 1.6 directions to VA & MCC shuttle parking
- Fawn Lake Trailhead Parking mile 1.7 directions to Fawn Lake Trailhead Parking
- Parking at Sweetwater Avenue mile 2 directions to trailhead 9
- Parking at Sweetwater Avenue mile 2 directions to trailhead 10
- Parking mile 2.1 directions to trailhead 11
(opens in a new tab) About this trail
The Narrow Gauge Rail Trail is a 3-mile path in Bedford, Massachusetts, running north from Loomis Street near Bedford Depot to the Bedford–Billerica town line. It follows the roadbed of the Billerica and Bedford Railroad, which Bedford Depot, a local historical nonprofit, describes as the country's first two-foot-gauge common-carrier railway. MassBike describes the path as believed to be the only rail trail in the United States built on a two-foot narrow-gauge right-of-way.
The Billerica and Bedford Railroad was chartered in 1876 with George E. Mansfield as general manager. Construction began in May 1877, and the 8.63-mile line between North Billerica and Bedford was completed that August. The company went bankrupt and was liquidated in June 1878. In May 1885 the Boston and Lowell Railroad used most of the old roadbed to extend its standard-gauge Lexington Branch, which the Boston and Maine Railroad took over in 1887. Passenger service ended at the close of 1931, and the section from Bedford Depot to Billerica Depot was abandoned in 1962.
The southern end lies near the terminus of the Minuteman Bikeway on South Road, and a replica of the railroad's two-foot-gauge track stands at the Loomis Street entrance. The segment from Loomis Street to the Great Road is asphalt; the rest is stone dust, and hybrid or mountain bicycles are recommended. The trail passes Fawn Lake, once the site of the Hotel Sweetwater, whose guests arrived by train. Beyond the town line, marked by gates in the woods, the corridor is private property. A Metropolitan Area Planning Council project announced in 2019 set out to improve safety at the trail's crossings of Loomis Street, the Great Road and Pine Hill Road.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 95% of this route as a trail on former railroad right-of-way.
- Shade
75% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bedford, 2.8 km from the trail's middle, 3 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 39 47 59 70 78 84 82 74 62 51 41 Low °F 18 19 27 36 46 55 61 60 52 40 31 23 Precipitation, in 3.8 3.4 4.8 3.9 3.8 4.1 3.8 3.9 3.7 4.8 4.1 4.8 Snow, in 16.1 12.5 12.9 2.3 0 0 0 0 0 0.1 1.9 13.2 - On the National Register
- Bedford Depot, Bedford · historic district, listed 2003 · nomination file for Bedford Depot
- Bedford Center Historic District, Bedford · historic district, listed 1977 · nomination file for Bedford Center Historic District
- Old Bedford Center Historic District (Boundary Increase and Decrease), Bedford · historic district, listed 2014
- Bedford Veterans Administration Hospital Historic District, Bedford · historic district, listed 2012 · nomination file for Bedford Veterans Administration Hospital Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1886 Lowell sheet (1:62,500); the 1950 Billerica sheet (1:24,000) shows the area at mid-century. Browse all 19 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Minuteman Bikeway within 0.2 mi · 10.1 mi, paved
- Reformatory Branch Trail 0.4 mi away · 3.8 mi, dirt
- Battle Road Trail 2.4 mi away · 1.3 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18201745, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Lexington and West Cambridge Railroad”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q6537883, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Billerica and Bedford Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: 1876 charter, Mansfield, May 1877 construction, August 1877 completion, 8.63 miles, 1878 liquidation, 1885 Lexington Branch, 1887 Boston and Maine, 1931 end of passenger service, 1962 abandonment
- Rail Trails at Bedford Depot Park — Bedford Depot · organization · checked Oct 13, 2026 Supports: 3 miles from Loomis Street to the town line, first two-foot-gauge common carrier, Minuteman Bikeway connection, asphalt and stone-dust surfaces, bicycle type, Fawn Lake and Hotel Sweetwater, replica track, private property beyond the town line
- Metro Boston bikeways — MassBike · organization · checked Oct 13, 2026 Supports: only rail trail believed built on a two-foot right-of-way, stone-dust surface
- Bedford Narrow Gauge Trail — Metropolitan Area Planning Council · organization · checked Oct 13, 2026 Supports: 2019 project on the Loomis Street, Great Road and Pine Hill Road crossings
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.