New Berlin Trail
Trolley trail in Wisconsin · OpenStreetMap relation
Runs through Waukesha, New Berlin and West Allis · Waukesha and Milwaukee counties
Conditions now
Loading the weather near New Berlin…
Forecast by the National Weather Service for New Berlin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The New Berlin Trail is a 7-mile (11 km) shared-use path in Waukesha County, Wisconsin. It follows a former interurban route and a set of We Energies power lines.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Lincoln Avenue mile 7.3 directions to trailhead 1
(opens in a new tab) About this trail
The New Berlin Trail, also called the New Berlin Recreation Trail, is a seven-mile Waukesha County recreation trail in Wisconsin. It lies on the Wisconsin Electric Power Company right-of-way in the City of New Berlin and follows a former interurban route and a line of We Energies power lines. The Milwaukee Electric Railway and Light Company built the railroad in 1898 as part of a Milwaukee-Waukesha interurban route, and it fell out of use in 1951. Planning for the trail began in 1973, construction started in the fall of 1983, and the trail was dedicated on May 19, 1984, with six miles from 124th Street to Springdale Road. A one-mile extension from Springdale Road to Lincoln Avenue followed in the fall of 1998, the trail was paved in June 2006, and in 2020 it was designated part of U.S. Bicycle Route 30.
The trail runs from S. 124th Street, just south of Greenfield Avenue (State Highway 59) at the Milwaukee-Waukesha county line, west to Lincoln Avenue in Waukesha. In Greenfield Park in Milwaukee County it connects with the Oak Leaf Trail and the West Allis Cross-Town Connector, a 0.9-mile eastward continuation whose first segment opened in 2013. At the western end it reaches the Glacial Drumlin State Trail by way of Waukesha city streets, and a 1.3-mile connector built in 2018 and 2022 continues into the City of Waukesha.
The county lists parking at Greenfield Park (mile marker 0), Sunnyslope Road (near mile 1), Buena Park (between miles 2 and 3) and Springdale Road (near mile 6). No annual membership or daily permit is required.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Brookfield Wwtp, 5.6 km from the trail's middle, 4 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 28 32 42 54 66 77 81 79 72 59 45 33 Low °F 12 15 25 35 47 56 61 60 51 40 28 19 Precipitation, in 1.6 1.6 2.1 3.7 3.9 4.8 3.8 4 3.2 3.1 2.2 2 - Old maps
USGS topographic maps of the trail's middle go back to the 1892 Waukesha sheet (1:62,500); the 1959 Waukesha sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Oak Leaf Trail Root River Line within 0.2 mi · 12.4 mi, paved
- West Allis Cross-Town Connector within 0.2 mi · 1.0 mi, paved
- Fox River Trail 0.9 mi away · 10.1 mi, paved
- Hank Aaron State Trail 1.4 mi away · 14.4 mi, paved
- Dousman Trail 1.8 mi away · 2.1 mi, paved
- Glacial Drumlin State Trail 1.9 mi away · 52.2 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5610456, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “New Berlin Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q116196839, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Trails — Waukesha County Parks · government source · checked Oct 15, 2026 Supports: seven-mile lineal recreation trail on the Wisconsin Electric Power Company right-of-way in the City of New Berlin; from S. 124th Street just south of Greenfield Ave. (State Hwy 59) at the county line to Lincoln Avenue in Waukesha; connects to the Oak Leaf Trail in Greenfield Park and the Glacial Drumlin Trail via city streets in Waukesha; parking at Greenfield Park, Sunnyslope Road, Buena Park and Springdale Road with mile markers; no annual membership or daily permit required
- New Berlin Trail — Wikipedia · organization · checked Oct 15, 2026 Supports: also called New Berlin Recreation Trail; follows a former interurban route and We Energies power lines; railroad built 1898 by The Milwaukee Electric Railway and Light Company, disused 1951; planning from 1973; construction fall 1983; dedicated May 19, 1984, six miles 124th Street to Springdale Road; 1998 extension to Lincoln Avenue; paved June 2006; U.S. Bicycle Route 30 in 2020; West Allis Cross-Town Connector first segment 2013, 0.9 miles; westward connector built 2018 and 2022, 1.3 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.