New Boston Rail Trail
Rail-trail in New Hampshire · OpenStreetMap relation
Runs through New Boston · Hillsborough County
Conditions now
Loading the weather near Klondike Corner…
Forecast by the National Weather Service for Klondike Corner · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- New Boston Rail Trail mile 1.6 directions to New Boston Rail Trail
- Parking at Riverside Drive mile 3.9 directions to trailhead 2
(opens in a new tab) About this trail
The New Boston Rail Trail is a dirt rail trail of about 3.9 miles in New Boston, New Hampshire, along the South Branch of the Piscataquog River on the bed of the Boston and Maine's New Boston spur. The railroad came to New Boston in 1893 and carried farm produce to city markets; passenger service ended in 1931, and the tracks were removed in 1935. The New Boston Conservation Commission owns the trail.
In early 1970 the Boston and Maine put the right-of-way up for sale, and residents formed the Piscataquog Watershed Association, now the Piscataquog Land Conservancy, to buy it. After five years of negotiation, during which the railroad went through two bankruptcies and New Hampshire Route 114 was built across the eastern end of the line, the association bought four parcels totaling 3.4 miles and 68 acres for $14,625 in 1976. A federal Land and Water Conservation Fund grant let the town acquire them, and the association deeded the land to the Conservation Commission on May 19, 1979; the grant bars use other than public outdoor recreation without federal approval. A major refurbishment by the commission was finished in 2015, when the path was named the New Boston Rail Trail.
The trail runs from the 4-H fairgrounds near New Boston village east past Lang Station, a stone passenger shelter, and a footbridge on the old rail bridge abutments over the Middle Branch Piscataquog River, to Route 114, where riders continue on the Goffstown Rail Trail. The surface is hardpack dirt and gravel.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
New Boston and New Boston Branch. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
84% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Milford, 18.2 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 33 36 45 58 69 78 83 81 73 60 49 38 Low °F 14 15 24 34 45 55 60 58 50 38 28 20 Precipitation, in 3 3 3.8 4.2 3.4 4 3.7 3.7 4 4.9 3.9 4.5 Snow, in 15.4 11.5 14.4 2.3 0 0 0 0 0 0.1 1.1 12.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1927 Concord sheet (1:62,500); the 1967 Weare sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
-
360° view 1 of 6, photo by Lanka6359 -
360° view 2 of 6, photo by Lanka6359 -
360° view 3 of 6, photo by Lanka6359 -
360° view 4 of 6, photo by Lanka6359 -
360° view 5 of 6, photo by Lanka6359 -
360° view 6 of 6, photo by Lanka6359
Nearby trails
- Goffstown Rail Trail 1.8 mi away · 5.4 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19723883, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Happy 50th Birthday PLC! — Piscataquog Land Conservancy · organization · checked Oct 13, 2026 Supports: 1970 sale of the B&M right-of-way, formation of the Piscataquog Watershed Association, negotiations, B&M bankruptcies, Route 114 across the eastern end, 1976 purchase of four parcels (3.4 miles, 68 acres, $14,625), 1979 Land and Water Conservation Fund grant and deed to the Conservation Commission on May 19, 1979, recreation-only stipulation, 2015 refurbishment and naming
- New Boston, New Hampshire — Wikipedia · organization · checked Oct 13, 2026 Supports: railroad arrived 1893 carrying farm produce, passenger service ended 1931, tracks removed 1935, former grade now the New Boston Rail Trail
- Pedals & Pathways: The New Boston Rail Trail is a delight — Ink Link (July 2026) · press · checked Oct 13, 2026 Supports: trail along the Piscataquog River ending at NH 114 with continuation on the Goffstown Rail Trail, dirt and small gravel surface
- New Boston Rail Trail NH — Trailspotting · web · checked Oct 13, 2026 Supports: 4-H fairgrounds, Lang Station stone shelter, footbridge on former rail bridge abutments over the Middle Branch Piscataquog River, hardpack and gravel surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
