States › Connecticut

Newtown Rail Trail

Rail-trail in Connecticut · OpenStreetMap relation

Runs through Town of Newtown, Monroe and Stepney

Conditions now

Loading the weather near Stepney…

Forecast by the National Weather Service for Stepney · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.8 mi 3.0 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Pepper Street mile 0.6 directions to trailhead 1
  2. Parking at Pepper Street mile 0.7 directions to trailhead 2
  3. Parking at Swamp Road mile 1.8 directions to trailhead 3
Housatonic Rail Trail near Botsford 100 (opens in a new tab)
Housatonic Rail Trail near Botsford 100 · Photo: Pedro Xing · CC0 · Wikimedia Commons

About this trail

The Newtown Rail Trail is the northern end of the rail-trail on the former Housatonic Railroad line between Bridgeport and Newtown, Connecticut. This record maps about 1.9 miles from Pepper Street in Monroe north to Swamp Road in the Botsford section of Newtown. South of the Newtown line the corridor carries the Pequonnock River Trail, a 16.9-mile, mostly flat multi-use path linking Bridgeport, Trumbull and Monroe.

Steam trains once ran from Bridgeport to Botsford Station and points north on a railbed that dates to the 1840s. In 2006 the Newtown Bee reported that trail users had to turn around at the town border: Newtown's portion of the railbed was landlocked, and the contaminated 30-acre Batchelder property, where an aluminum smelter operated from 1947 to 1987, stood in the way.

The Newtown Bike & Trail Committee, with the town's Economic and Community Development office, is extending the trail from Monroe to a new trailhead on Swamp Road with parking and a planned pavilion. The Newtown portion is to be fully ADA-compliant, and a review with the state Department of Energy and Environmental Protection found the alignment entirely outside the areas of environmental concern at the former Batchelder site. In July 2026 the committee's fundraising campaign reached its goal, and construction, coordinated by the town's Department of Public Works, was expected to begin that summer. Later plans would carry the trail to the Fairfield Hills campus.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

72% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Danbury, 14.8 km from the trail's middle, 7 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F363948607280858275625040
Low °F202229394959646355433426
Precipitation, in3.73.34.44.24.24.854.94.9544.6
Snow, in15.71110.41.70000001.98.6
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Danbury sheet (1:62,500); the 1951 Botsford sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9740885, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Developing Views 2026 – Vol. 8 — Newtown Economic and Community Development · organization · checked Oct 14, 2026
    Supports: extension from Monroe to a new trailhead on Swamp Road, Pequonnock River Trail 16.9 miles linking Bridgeport, Trumbull and Monroe on the former Housatonic Railroad line, ADA-compliant Newtown portion, DEEP review outside areas of environmental concern near the Batchelder site, future extension to Fairfield Hills
  3. Newtown Rail Trail Fundraising Goal Reached, Clearing Way For Construction — The Newtown Bee · press · checked Oct 14, 2026
    Supports: July 1, 2026 goal reached, construction expected that summer, Public Works coordinating, Swamp Road trailhead with parking and planned pavilion
  4. 'Rail-Trail-Blazer' Campaign Invites Community Donors To Close $50k Funding Gap — The Newtown Bee · press · checked Oct 14, 2026
    Supports: Newtown Bike & Trail Committee with the Economic & Community Development Office, first phase across the Monroe border
  5. Newtown's Link To Regional Rail Trail Is Blocked At The Border — The Newtown Bee · press · checked Oct 14, 2026
    Supports: 2006: steam trains from Bridgeport to Botsford Station, railbed from the 1840s, users turn around at the border, landlocked town portion, 30-acre Batchelder property with an aluminum smelter 1947-1987

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.