Newtown Rail Trail
Rail-trail in Connecticut · OpenStreetMap relation
Runs through Town of Newtown, Monroe and Stepney
Conditions now
Loading the weather near Stepney…
Forecast by the National Weather Service for Stepney · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Pepper Street mile 0.6 directions to trailhead 1
- Parking at Pepper Street mile 0.7 directions to trailhead 2
- Parking at Swamp Road mile 1.8 directions to trailhead 3
About this trail
The Newtown Rail Trail is the northern end of the rail-trail on the former Housatonic Railroad line between Bridgeport and Newtown, Connecticut. This record maps about 1.9 miles from Pepper Street in Monroe north to Swamp Road in the Botsford section of Newtown. South of the Newtown line the corridor carries the Pequonnock River Trail, a 16.9-mile, mostly flat multi-use path linking Bridgeport, Trumbull and Monroe.
Steam trains once ran from Bridgeport to Botsford Station and points north on a railbed that dates to the 1840s. In 2006 the Newtown Bee reported that trail users had to turn around at the town border: Newtown's portion of the railbed was landlocked, and the contaminated 30-acre Batchelder property, where an aluminum smelter operated from 1947 to 1987, stood in the way.
The Newtown Bike & Trail Committee, with the town's Economic and Community Development office, is extending the trail from Monroe to a new trailhead on Swamp Road with parking and a planned pavilion. The Newtown portion is to be fully ADA-compliant, and a review with the state Department of Energy and Environmental Protection found the alignment entirely outside the areas of environmental concern at the former Batchelder site. In July 2026 the committee's fundraising campaign reached its goal, and construction, coordinated by the town's Department of Public Works, was expected to begin that summer. Later plans would carry the trail to the Fairfield Hills campus.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
72% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Danbury, 14.8 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 39 48 60 72 80 85 82 75 62 50 40 Low °F 20 22 29 39 49 59 64 63 55 43 34 26 Precipitation, in 3.7 3.3 4.4 4.2 4.2 4.8 5 4.9 4.9 5 4 4.6 Snow, in 15.7 11 10.4 1.7 0 0 0 0 0 0 1.9 8.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1892 Danbury sheet (1:62,500); the 1951 Botsford sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Stepney Rail Trail 0.3 mi away · 1.9 mi, crushed stone
- Pequonnock River Trail 2.8 mi away · 8.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9740885, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Developing Views 2026 – Vol. 8 — Newtown Economic and Community Development · organization · checked Oct 14, 2026 Supports: extension from Monroe to a new trailhead on Swamp Road, Pequonnock River Trail 16.9 miles linking Bridgeport, Trumbull and Monroe on the former Housatonic Railroad line, ADA-compliant Newtown portion, DEEP review outside areas of environmental concern near the Batchelder site, future extension to Fairfield Hills
- Newtown Rail Trail Fundraising Goal Reached, Clearing Way For Construction — The Newtown Bee · press · checked Oct 14, 2026 Supports: July 1, 2026 goal reached, construction expected that summer, Public Works coordinating, Swamp Road trailhead with parking and planned pavilion
- 'Rail-Trail-Blazer' Campaign Invites Community Donors To Close $50k Funding Gap — The Newtown Bee · press · checked Oct 14, 2026 Supports: Newtown Bike & Trail Committee with the Economic & Community Development Office, first phase across the Monroe border
- Newtown's Link To Regional Rail Trail Is Blocked At The Border — The Newtown Bee · press · checked Oct 14, 2026 Supports: 2006: steam trains from Bridgeport to Botsford Station, railbed from the 1840s, users turn around at the border, landlocked town portion, 30-acre Batchelder property with an aluminum smelter 1947-1987
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.