NIACC Trail Extension
Greenway in Iowa
Runs through Mason City · Cerro Gordo County
Conditions now
Loading the weather near Mason City…
Forecast by the National Weather Service for Mason City · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 0.1 directions to trailhead 1
- Parking at South Yorktown Pike mile 1.4 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The NIACC Trail is a paved trail of about 2.2 miles on the east side of Mason City, Iowa, linking Asbury Park with the campus of North Iowa Area Community College (NIACC). The record carries the OpenStreetMap name NIACC Trail Extension; TrailLink and KIMT News call it the NIACC Trail, and Visit Mason City describes the same corridor as the Birch Drive Trail. It is a greenway, not a rail-trail. No city or college page describing the trail was found.
Visit Mason City puts the trail at 2.15 miles, following Ideal Creek with three creek crossings and ending beside the ponds on the college campus. TrailLink describes most of the route as open fields along Ideal Creek, past a couple of residential subdivisions, and says it gives students and residents an alternative to biking or walking along busy US 18. Asbury Park, at the west end, covers 2.66 acres on the bank of the Winnebago River.
The surface is asphalt. TrailLink lists parking at Asbury Park, just north of South Birch Drive and US 18, and on the campus along College Drive. In May 2025 Mason City dedicated the Murphy Park Trail and Bridge, a 240-foot crossing of the Winnebago River at 2nd Street NE and North Ohio Avenue that KIMT reported links the Scrip Road Waterfront Trail and the NIACC Trail, as part of the $4 million Prairie Rock Trails system funded by a Destination Iowa grant and local option sales tax.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Mason City, 4.5 km from the trail's middle, 10 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 29 41 56 69 79 82 80 74 60 43 30 Low °F 7 11 23 35 47 58 62 59 50 38 25 14 Precipitation, in 0.9 1.1 1.9 3.9 5.6 5.7 4.6 3.7 3.2 2.5 1.8 1.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Mason City sheet (1:250,000); the 1959 Mason City sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Shell Rock Greenbelt Trail 3.8 mi away · 5.2 mi, dirt
- Trolley Trail 4.2 mi away · 5.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Asbury Park — Visit Mason City · web · checked Oct 15, 2026 Supports: Asbury Park 2.66 acres on the Winnebago River; Birch Drive Trail to NIACC campus, 2.15 miles, three creek crossings along Ideal Creek, ends at campus ponds
- Mason City welcomes a new bike bridge over the Winnebago River (May 19, 2025) — KIMT · web · checked Oct 15, 2026 Supports: name NIACC Trail; Murphy Park Trail and Bridge, 240 feet, 2nd St. NE and N. Ohio Ave., link to Scrip Road Waterfront Trail and NIACC Trail, $4 million Prairie Rock Trails, Destination Iowa grant and local option sales tax
- NIACC Trail | Iowa Trails | TrailLink · web · checked Oct 15, 2026 Supports: 2.2 miles, Asbury Park to NIACC, asphalt, Ideal Creek and open fields, subdivisions, alternative to US 18, parking at Asbury Park and College Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.