States › Virginia

Nimmo Parkway Multi-Use Path

Greenway in Virginia

Runs through Virginia Beach

Conditions now

Loading the weather near Virginia Beach…

Forecast by the National Weather Service for Virginia Beach · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.6 mi 4.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Radnor Hunt Trail mile 2.3 directions to trailhead 1
  2. Parking at McComas Way mile 2.5 directions to trailhead 2
  3. Parking at McComas Way mile 2.7 directions to trailhead 3
Virginia Beach, along the trail (opens in a new tab)
Virginia Beach, along the trail · Photo: SchuminWeb · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Nimmo Parkway Multi-Use Path is a paved path of about 2.6 miles beside Nimmo Parkway in the southern part of Virginia Beach, Virginia, in the Princess Anne and Nimmo areas of the city. As mapped in this record, it runs east from Princess Anne Road, crosses Holland Road, and continues along the parkway to a point just west of Newstead Drive, near the Red Mill area.

East of Holland Road, the parkway was built by the City of Virginia Beach as a 1.7-mile, four-lane divided road on new alignment from just east of Holland Road to the existing section of the parkway, which connects to General Booth Boulevard about half a mile farther east. The Commonwealth Transportation Board approved the construction contract in September 2011, with a bid of about $44.8 million from Waterfront Marine Construction and a fixed completion date of June 30, 2014. The project included bridges of 1,600 and 200 feet over West Neck Creek and a tributary at Hunt Club, about 1.6 miles of noise walls, signals, and bike paths; the state's project summary describes it as bicycle- and pedestrian-friendly, with widened outside lanes for on-street cycling and five-foot sidewalks for bicycle and pedestrian use. In June 2014 the city expected the new road between Holland Road and General Booth Boulevard to open to traffic in early to mid-August of that year.

West of Holland Road, the parkway was extended to Princess Anne Road as a four-lane divided road in road work reported by WTKR in 2014. No city page for the path itself was found, and the agency that maintains the path is not confirmed; OpenStreetMap maps it as paved.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Oceana Nas, 6 km from the trail's middle, 5 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505359697683878580716154
Low °F323339485666706964534235
Precipitation, in3.22.83.63.43.64.25.85.14.54.23.13.3
Snow, in2.20.80000000000.4
Old maps

USGS topographic maps of the trail's middle go back to the 1907 Norfolk sheet (1:125,000); the 1955 Princess Anne sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Bid Results for the CTB, September 28, 2011 (UPC 52058, Nimmo Parkway) — Commonwealth Transportation Board, Virginia Department of Transportation · government source · checked Oct 14, 2026
    Supports: City of Virginia Beach project; new four-lane divided roadway from just east of Holland Road to existing Nimmo Parkway, about 1.7 miles; Nimmo Parkway connects to General Booth Boulevard about 0.5 miles east of the tie-in; 1,600- and 200-foot bridges over West Neck Creek and Hunt Club Tributary; about 1.6 miles of noise barrier; signals, bike paths and soundwalls; widened outside lanes for on-street bicycle use and five-foot sidewalks for bicycle and pedestrian use; award recommended to Waterfront Marine Construction at $44,797,130.70; fixed completion June 30, 2014
  3. Your commute around southern Virginia Beach is about to change — WTKR (June 24, 2014) · web · checked Oct 14, 2026
    Supports: new 1.7 miles of Nimmo Parkway between Holland Road and General Booth expected to open to traffic in early to mid-August; extension of Nimmo Parkway between Princess Anne and Holland roads
  4. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 14, 2026
    Supports: route from Princess Anne Road past Holland Road to just west of Newstead Drive; paved surface

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.