States › West Virginia

North Bend Rail Trail

Rail-trail in West Virginia · OpenStreetMap relation

Runs through Kanawha, Cairo, Ellenboro, Pennsboro, West Union, Salem and Wolf Summit · Wood, Ritchie, Doddridge and Harrison counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The North Bend Rail Trail is a 72-mile (116 km) rail trail in north-central and western West Virginia in the United States. It is operated by West Virginia State Parks and is part of the American Discovery Trail.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Managed by West Virginia State Parks.4

Length
69.1 mi 111 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Wolf Summit Terminus mile 0 directions to Wolf Summit Terminus
  2. Pennsboro Trailhead mile 31.9 · water directions to Pennsboro Trailhead
  3. Parking at Washington Street mile 37 · restrooms directions to trailhead 3
  4. Ellenboro Trailhead mile 37.2 directions to Ellenboro Trailhead
  5. Parking at Main Street mile 37.2 directions to trailhead 5
  6. Parking at Wagner Street mile 37.3 directions to trailhead 6
  7. Cairo Trailhead mile 44.6 directions to Cairo Trailhead
  8. Cairo Trailhead mile 44.7 directions to Cairo Trailhead
  9. Petroleum Trailhead mile 51.7 · restrooms directions to Petroleum Trailhead
  10. Walker Trailhead mile 58.5 directions to Walker Trailhead
  11. Happy Valley Trailhead mile 69 directions to Happy Valley Trailhead
  12. Happy Valley Trailhead mile 69.1 directions to Happy Valley Trailhead

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

North Bend Rail Trail Tunnel 12 (opens in a new tab)
North Bend Rail Trail Tunnel 12 · Photo: Mike Tewkesbury · CC BY-ND · Flickr

About this trail

The North Bend Rail Trail is a 72-mile rail trail in north-central and western West Virginia, operated by West Virginia State Parks and part of the 5,500-mile American Discovery Trail. It follows the Baltimore and Ohio Railroad's former Parkersburg Branch. The Northwestern Virginia Railroad, chartered in 1851, built the line from the B&O main line at Grafton to the Ohio River at Parkersburg, and it passed to the B&O on completion on May 1, 1857. Built with 23 tunnels and 52 bridges to hold grades to 1.5 percent, the branch carried the National Limited, the B&O's premier train between New York and St. Louis. B&O passenger service ended in 1971, and the Chessie System ended local freight service by 1985. CSX Transportation abandoned the line between Walker and Wilsonburg and removed the tracks in September 1988. The state bought the corridor for about $320,000, opened the first trail segments in 1991, and in 1996 bought the western portion from Walker to Parkersburg.

The trail runs parallel to U.S. Route 50 from Wolf Summit, west of Clarksburg, to Interstate 77 near Parkersburg. It passes through Harrison, Doddridge, Ritchie and Wood counties, the towns of Salem, West Union, Pennsboro, Ellenboro and Cairo, North Bend State Park and Walker Creek Wildlife Management Area. It crosses 36 bridges and passes through 10 tunnels, among them a 2,297-foot tunnel and the Silver Run Tunnel; tunnel No. 2, east of Salem, is 1,086 feet long.

Hikers, cyclists and horseback riders share the trail, and cyclists and hikers must yield to horses. West Virginia State Parks recommends tires wider than 1.5 inches and has bike repair stations at Happy Valley, Smithburg, Petroleum and Salem; bikes can be rented at North Bend State Park and Cairo. Horse trailer parking is at Happy Valley, Cairo, North Bend State Park, Ellenboro, West Union and Wolf Summit. Free primitive camping is allowed along the trail, with fires only in fireplaces.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

59% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April, June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
W Union 2, 20.8 km from the trail's middle, 22 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F414454677582858479685645
Low °F212229384858626154413126
Precipitation, in3.73.54.23.95.14.95.73.73.73.53.24
Snow, in9.96.72.80.10000000.33.4
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1906 Saint Marys sheet (1:62,500); the 1961 Ellenboro sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders posting in 2024 and 2025 described coarse, loose gravel: one reported a rough first three miles from Clarksburg on 38 mm and 2-inch tires; another noted dirt double track in places. r/WestVirginia, Apr 2024 · r/gravelcycling, Aug 2025
  • Riders posting in 2024 favored starting at the Parkersburg end over the other, which they called rough; a 2025 rider reported overnight parking at mile marker 2. r/WestVirginia, Apr 2024 · r/gravelcycling, Aug 2025
  • In 2025 one rider camped about a mile from the trail in Doddridge County, citing potable water, a bath house and cheap sites; another noted basic camp spots with picnic tables. r/gravelcycling, Aug 2025 · r/WestVirginia, Sep 2025
  • One rider in September 2025 gave up a ride because fiber-optic installation beside the trail had torn up sections and spread fresh crushed stone. r/WestVirginia, Sep 2025
7 Reddit threads about this trail, Apr 2024 to Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2204746, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “North Bend Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7054143, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. West Virginia State Parks · Official site · checked Oct 31, 2026
  5. North Bend Rail Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: operated by West Virginia State Parks, counties and towns, Northwestern Virginia Railroad chartered 1851, Grafton to Parkersburg, sold to the B&O May 1, 1857, Parkersburg Branch with 23 tunnels, 52 bridges and 1.5% maximum grade, National Limited, B&O passenger service ended 1971, local freight ended by 1985, CSX abandonment Walker–Wilsonburg and track removal September 1988, state purchase about $320,000, first segments 1991, western portion bought 1996, tunnel No. 2 east of Salem 1,086 feet
  6. North Bend Rail Trail — West Virginia State Parks · web · checked Oct 14, 2026
    Supports: 72 miles across north-central and western West Virginia, 36 bridges, 10 tunnels including a 2,297-foot tunnel and Silver Run Tunnel
  7. North Bend Rail Trail Additional Info — West Virginia State Parks · web · checked Oct 14, 2026
    Supports: parallel to U.S. Route 50, Wolf Summit west of Clarksburg to I-77 near Parkersburg
  8. Activities at North Bend Rail Trail — West Virginia State Parks · web · checked Oct 14, 2026
    Supports: 5,500-mile American Discovery Trail, free cold camping with fires in fireplaces only, bike rentals at North Bend State Park and Cairo, fix-it stations at Happy Valley, Smithburg, Petroleum and Salem, tires above 1.5 inches, Walker Creek WMA, yield to horses, horse parking locations

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.