States › Tennessee

North Murfreesboro Greenway

Greenway in Tennessee

In Rutherford County

Conditions now

Loading the weather near Murfreesboro…

Forecast by the National Weather Service for Murfreesboro · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.7 mi 4.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Central Valley Road mile 0.9 directions to trailhead 1
Providence Primitive Baptist Church, beside the trail (opens in a new tab)
Providence Primitive Baptist Church, beside the trail · Photo: Michael Fisher · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The North Murfreesboro Greenway is a paved greenway beside the East Fork Stones River on the north side of Murfreesboro, Tennessee, developed by Murfreesboro Parks and Recreation. According to NewsChannel 5, the city agreed to the project in the summer of 2014, dedicated the first phase at the end of 2016, and began a second phase in 2020.

The second phase, completed by March 2023 with more than $2 million in funding, added three miles to the trail and leveled parts of the 18-mile Twin Forks Equestrian Trail, along with updates to the equestrian trails at the Central Valley Trailhead. NewsChannel 5 reported that the long-term goal is to connect this greenway with greenways in Smyrna, La Vergne and Nashville. TrailLink, which describes the first 1.3 miles, places the trail along the river between the Walter Hill Trailhead and the East Fork Stones River, mostly shaded, with a loop at its northwest end, and lists parking at the southern end and at the Central Valley Trailhead on Central Valley Road.

OpenStreetMap maps about 2.7 miles of the greenway, most of it in one section of nearly 2 miles running north from the Central Valley Road area, with shorter sections to the southeast. It records an asphalt surface designated for bicycles and pedestrians, with horses excluded from the greenway itself.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

81% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Murfreesboro 5 N, 3.9 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485261717986898984736151
Low °F283037465564686759473731
Precipitation, in4.74.95.34.84.95.753.643.54.15.5
Snow, in0.80.70.4000000000.3
Old maps

USGS topographic maps of the trail's middle go back to the 1916 Murfreesboro sheet (1:62,500); the 1950 Walterhill sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. More miles added to North Murfreesboro Greenway — NewsChannel 5 (WTVF), March 8, 2023 · press · checked Oct 15, 2026
    Supports: Murfreesboro Parks and Rec; project agreed in summer 2014; phase one dedicated at the end of 2016; phase two started in 2020 and just completed; more than $2 million; three extra miles; leveling parts of the 18-mile Twin Forks Equestrian Trail; equestrian trails at the Central Valley Trailhead; goal of connecting with Smyrna, La Vergne and Nashville
  3. North Murfreesboro Greenway — TrailLink · web · checked Oct 15, 2026
    Supports: 1.3 miles beside the East Fork Stones River; end points East Fork Stones River and Walter Hill Trailhead; paved and mostly shaded; loop at the northwest end; parking at the southern end and the Central Valley Trailhead on Central Valley Rd.; asphalt
  4. North Murfreesboro Greenway, way 1169512641 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: main section of nearly 2 miles north from the Central Valley Road area; shorter sections to the southeast; asphalt; designated for bicycles and pedestrians; horses excluded

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.